ML20202B478

From kanterella
Jump to navigation Jump to search
Ack Receipt of Which Transmitted Changes to REP for Fort Calhoun Station Submitted Under Provisions of 10CFR50,Appendix E & 10CFR50.4(b)(5)(iii).NRC Approval Not Required
ML20202B478
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/06/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9802120026
Download: ML20202B478 (3)


Text

e p* **%g miTro sicTes t

NUCLEAR REGUI.ATORY COMMISSION g.

g RioioN iv 611 RYAN PLAZA DRIVE, sulTE 400 4

ARLINo 6 oN.T LXAs 76011 a064 February 6, 1998 S. K. Gambhlt, DMslori Manager Engineering & Operations Support Omaha Public Power District Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023 0399

SUBJECT:

CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY PLAN This letter acknowledges receipt of your letter dated April 11,1997, which transmitted changes to the Radiological Emergency Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(lii).

Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initlai review of these changes Indicates that they are in accordance with 10 CFR 50.54(q).

Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the b'RC Public Document Room.

Sincerely, M

Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket No.:

50 285 License No.: DPR-40

$6bd a 9002120026 900206 jt DR ADOCK0500g5

Omaha Public Power District 2-cc:

James W. Tills, Manager Nuclear Licensing Omkhc Puh'io Power District Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399 Hwy. 75 - Nurth of Fort Calhoun Fort Calhoun. Nebraska 68023-0399 Mtms 06 Chtr>e, Manager Fort Caltoun Gtetion P.O. Box 309 Fett Calhoun, Nebraska 68023 Perry D. Robinson, Esq.

Winaton & Strawn 1400 L. Street, N.W.

Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Roaers, LLRW Program Manager Envirenmental Protection Section Nebraska Cepartment of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 5007 e

e Omaha Public Power District 3-DISTRIBI) TION:

DN Regional Administrator DRS Director DRS Deputy Director DRS-PSB DRP Director Branch Chief (DRP/B)

'1 Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

Resident inspector MIS System (Elko)

RIV File DRS Action item File (97 E-0017)

DOCUMENT NAME: G:\\DRSLTRS\\FC9803EP. LOO TAC #XO3388 G:\\DRSLTRS\\FC9803EP. MOO To receive copy of document, Indicate in box:"C" a Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:PSB C:DRS\\PSB THAndrews:nh 4W BMurray f) 02/ 4 /98 02/Cj /98 '

OFFICIAL RECORD COPY