ML20202A926
| ML20202A926 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 11/22/1997 |
| From: | Sorensen J NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20202A930 | List: |
| References | |
| NUDOCS 9712030022 | |
| Download: ML20202A926 (2) | |
Text
~.
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonada Dr. East Welch. Mnesota 55089 November 22,1997 U S Nuclear Regulatory Comn;ission Attn: Document Control Desk Washington, DC 20555 PRAIR'E ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50 282 License Nos. DPR-42 50-306 DPR-60 Core Operatir.g Limits Report for Prairie Island Unit 1 Cycle 19. Revision 0 The attached revision to the Core Operating Limits Report for Prairie Island Unit 1 Cycle 19 is being provided in accordance with the requirements of Technical Specification Section 6.7.A.6. The limits specified in the attached Core Operating Limits Report have been established using NRC approved methodology.
The Unit 1 Core Operating Limits Report has been revised for Cycle 19 to incorporate the following changes:
- 1. Table 1 has been updated to incorporate revised bounding V(z) values.
- 2. Figures 2a through 2f have been updated to incorporate revised bounding V(z) values.
We have ritade no new Nuclear Regulatory Commission commitments in this letter or the attachment. Please contact Gene Eckholt (612-388-1121) if you have any questions related to this report.
3
'f f
i Wue -oaGO94 el P Sorensen Plant Manager Prairie Island Nuclear Generating Plant gi.i,gggig gg 9712030022 971122
- PDR ADOCK OSMO 282 P
PDR-
1 f
C NORTHERN STATES POWER COMPANY November 22,1997 I
Page 2 c: Regional Administrato Region 111, NRC NRR Project Manager, NRC Senior Resident inspector, NRC State of Minnesota Attn: Kris Sanda J E Silberg
Attachment:
Core Operating Limits Report - Unit 1 Cjcle 19 Revision 0 couu.ra.txx
~
__