Forwards Haddam Neck Crdr Implementation Plan. Crdr Summary Rept Will Be Submitted by 880225
ML20202A711
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/28/1986
From: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
Shared Package
ML20202A715 List:
References
RTR-NUREG-0737, RTR-NUREG-737 A02959, A04135, A2959, A4135, GL-82-33, NUDOCS 8604110043
Download: ML20202A711 (2)


Text

.

s NORTHEAST UTHJTIES o.nor i Omc.. . semen street. Bernn. connecticut r co cwt uo r me.oma cow =.

J eve ssac usettsnec=c cowav P.O. BOX 270

    • e ..nm . co**'

HARTFORD. CONNECTICUT 06141-0270 L L J C7,[,2.[,[*', (203) 665-5000 February 23,1986 Docket No. 50-213 A02959 A04135 Office of Nuclear Reactor Regulation Attn: Mr. C. I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

(1) D. M. Crutchfield letter to W. G. Counsil, " Orders Confirming Licensee Commitments on Emergency Response Capability (Generic Letter 82-33, NUREG-0737)," dated June 12,1984.

Gentlemen:

Haddam Neck Plant Supplement I to NUREG-0737 Control Room Design Review Implementation Plan By Reference (1), the NRC issued an Order confirming various commitments made by Connecticut Yankee Atomic Power Company (CYAPCO) on behalf of the Haddam Neck Plant regarding the implementation of Supplement I to NUREG-0737. This Order required the submittal by February 28,1986 of the Control Room Design Review (CRDR) program plan and a schedule for the submittal of the CRDR summary report. Accordingly, we hereby submit fif teen (15) copics of the Control Room Design Review Implementation Plan for the Haddam Neck Plant. In addition, we commit to submitting the CRDR summary report for the Haddam Neck Plant by February 25,1988.

The February 25, 1988 submittal date was chosen, in part, to allow inclusion in the summary report of the results of those environmental surveys associated with the plant process computer /SPDS. Although the SPDS will not be declared operational at that time, the plant process computer /SPDS will be sufficiently completed subsequent to the 1987 refueling outage, which is currently scheduled to occur during July-September,1987, to allow the CRDR environmental surveys to be completed.

In accordance with Supplement I to NUREG-0737, no NRC Staff approval of this CRDR Implementation Plan is necessary prior to the initiation of the CRDR for the Haddam Neck Plant. However, we trust that any NRC perceived major deficiencies in this plan will be brought to our attention in a timely manner.

9 0h 8604110043 860228 PDR ADOCK 05000213 '

P pm

4 Should you have any questions, please contact us.

Very'truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY E F. CLA U

3. F. Ope'ka' Senior Vice President

.