Forwards Insp Rept 99900912/98-01 on 980106-08.No Violations Were Identified
ML20199L666
Person / Time
Issue date: 02/05/1998
From: Black S
NRC (Affiliation Not Assigned)
To: Rotti T
NTS (NATIONAL TECHNICAL SYSTEMS)
Shared Package
ML20199L669 List:
References
REF-QA-99900912 99900912-98-01, 99900912-98-1, NUDOCS 9802100002
Download: ML20199L666 (4)


Text

(

' Mr. Timothy R tti, Division Manager National Technical Systems Fabruary 5, 1998 Nuclear Services Group 533 Main Street Acton, Massachusetts 01720

SUBJECT:

NRC INSPECTION REPORT 99900912/95-01

Dear Mr. Rotti:

On January 6-8,1998, the U.S. Nuclear Regulatory Commission (NRC) performed an inspection at the National Technical Systems (NTS) facility in Acton, Massachusetts. The enclosed report presents the findings or that inspection. The inspection was conducted to assess specific at'ributes and implementation of the NTS quality assurance (QA) program to ascerta!n whether it mst NRC requirements. The inspectors specifically reviewed your activities relating to the procurement, dedication, and supply of replacement 4-kV circuit breakers to the Diablo Canyon Power Plant. The inspectors assessed NTS's conformonce to customer procurement requirements, commercial grade dedication activities and compliance with NRC regulations. In addition, the inspectors examined corrective action taken in response to the findings of the previous inspection of NTS documented in inspection Report 99900912/93-01. Within the scope c

of this inspection, we found no instance in which NTS failed to meet NRC requirements.

As discussed in detailin the enclosed report, the inspectors found that NTS's commercial-grade dedication of the Yaskawa modular assemblies, the conversion hardware, and final conversion units was acceptable. The inspectors also found that the evaluations of Yaskawa design changes and PDS conversion hardware by NTS and PG&E were adequate to support taking credit for the Yaskawa ANSIinterrupting capacity test.

In accordance with 10 CFR 2.790 of the NRC's

  • Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.

Sincerely, originai s1gned by Richard P. Correia for Suzanne C. Black, Chief Quality Assurance, Vendor Inspection, and Maintenance Branch N

rvU Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No,99900912 g{% g

Enclosure:

Inspection Report 99900912/98 01 cc: See enclosure l

Distribution:

RIDS Code IE:09 Docket File Nos. 50-275 and 50-323 3

g ~ p0 N"M Central Files /Dochet File No. 99900912 HQMB R/F PUBLIC SBloom EW BRogers (one additional signed copy for NUREG 0040)

JLee

HWong, RIV DPowers, RIV PGage, RIV WBateman PGwynn CPaulk, RIV RWise, RIV EWilliamson, RIV PJoukoff, RIV SAlexander (two additional signed copies)

DOCUMENT NAME: G:\\ DRAFT \\CWALINA\\NTS.LTR lll ll ll ll

.c

  • SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicata in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

~

OFFICE HOMB:DRCH E

HOMB:DRCH E

HOMB:DRCH HQMB:DRCH l

NAME GCCwalina SAlexander RAGramm SCBlack l

DATE 02/04/98*

02/05/98*

02/04/98*

02/04/98*

9902100002 980205

^ FICIAL RECORD COPY PDR GA999 EECNATTS 99900912 PDR

Mr. Timothy R:tti, Division M:n:ger h

N:tional Tcchnical Syst:ms February 5,1998 Nuclear Services Group 533 Main Street Acton, Massachusetts 01720 l

SUBJENT:

NRC INSPECTION REPORT 99900912/98-01 1

Dear Mr. Rotti:

(

On January 6-8,1998, the U.S. Nuclear Reguletory Commission (NRC) performed an inspection I

at the National Technice; Systems (NTS) facility in Acton, Massachusetts. The enclosed report l

presents the findings of that inspection. The inspection was conducted to assess specific i

attributes and implementation of the NTS quality assurance (QA) program to ascertain whether it i

met NRC requirements. The inspectors specifically reviewed your activities relating to the procurement, dedication, and supply of replacement 4-kV circuit breakers to the Diablo Canyon l

I Power Plant. The inspectors assessed NTS's conformance to customer procurement requirements, commercial grade dedication activities and compliance with NRC regulations, in

)

addition, the inspectors examined corrective action taken in response to the findings of the

)

previous inspection of NTS documented in Inspection Report 99900912/93-01. Winin the scope 1

of this inspection, we found no instance in which NTS failed to meet NRC requirements.

As discussed in detail in the enclosed report, the inspectors found that NTS's c.ommercial-grave dedication of the Yaskawa modular assemblies, the conversion hardware, and final conversion units was acceptable. The inspectors also found that the evaluations of Yaskawa design changes and PDS conversion hardware by NTS and PG&E were adequate to support taking credit for the Mk&wa ANSIinterrupting capacity test.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.

Sincerely, originai signed by Richard P, Correia for Suzanne C. Black, Chief Quality Assurance, Vendor inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No. 99900912

Enclosure:

Inspection Report 99900912/98-01 cc: See enclosure Distribution:

RIDS Code IE:09 Docket File Nos. 50-275 and 50-323 Central Files / Docket File No. 99900912 HOMB R/F PUBLIC SBloom BRogers (one additional signed copy for NUREG 0040)

JLee

HWong, RIV DPowers, RIV PGage, RIV WBateraan PGwynn CPaulk, RIV RWise, RIV EWilliamson, RIV PJoukoff, RIV SAlexander (two additional signed copies)

DOCUMENT NAME: G:\\ DRAFT \\CWAtJNA\\NTS.LTR

  • SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with cnclosures "N" = No copy OFFICE HOMB:DRCH E

HOMB:DRCH E

HOMB:DRCH HOMB:DRCH l l_

NAME GCCwalina SAlexander RAGramm SCBlack l

DATE 02/04/98*

02/05/98*

02/04/98*

02/04/98*

OFFICIAL RECORD COPY 1

I

W Mr. Timothy Rotti 2-cc:

NRC Resident inspector Regional Administrator, Region IV Diablo Canyon Nuclear Power Plant U.S. Nuclear Regulatory Commission clo U.S. Nuclear Regulatory Commission Harris Tower & Pavilion P.O. Box 369 611 Ryan Plaza Drive, Suite 400 Avila Beach, California 93424 Ar.ington, Texas 76011 8064 Dr. Richard Ferguson, Energy Chair Christopher J. Wamer, Esq.

Sierra Club Califomia Pacific Gas & Electric Company 110011th Street, Suite 311 Post Office Box 7442 Sacramento, Califomia 95814 San Francisco, California 94120 Ms. Nancy Culver Mr. Robert P. Powers San Luis Obispo Vice President and Plant Manager Mothers for Peace Diablo Canyon Nuclear Power Plant P.O. Box 164 P.O. Box 56 Pismo Beach, Califomia g3448 Avila Beach, Califomia 93424 Chairman Telegram-Tribune San Luis Obispo County Board of ATTN: Managing Editor Supervisors 1321 Johnson Avenue Room 370 P.O. Box 112 San Luis Obispo,':A 93406 County Govemment Center San Luis Obispo, California 93408 Mr. Trumt,n Burns Mr, Robert Kinoslan California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, Califomia 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Socramento, Califomia 94232 Diablo Canyon independent Safety

. Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Stree* Suite D Monterey, California 95940 t

Mr, Timothy Rotti 3

oc w/ encl; NRC Resident inspector Regional Administrator, Region IV Diablo Canyon Nuclear Power Plant U.S. Nuclear Regulatory Commission clo U.S. Nuclear Regulatory Commission Harris Tower & Pavilion P.O. Box 369 611 Ryan Plaza Drive, Suite 400 Avila Beach, California 93424 Arlington, Texas 76011 8064 Dr. Richard Ferguson, Energy Chair ChristopherJ.Wamer Esq.

Sierra Club Califomia Pacific Gas & Electric Company 1100 it ' $treet, Suite 311 Post Office Box 7442 Sacramento, Califomia 95814 San Francisco, Califomia 94120 Ms. Nancy Culver Mr. Robert P. Powers San Luis Obispo Vice President and Plant Manager Mothers for Peace Diablo Conyon Nuclear Power Plant P.O. Box 164 P.O. Box 56 Pismo Beach, California 93448 Avila Beacn, Califomia 93424 Chairman Chief, Fuel Cycle and Decommissioning San Luis Obispo County Board of Branch, Region IV Supervisors U.S. Nuclear Regulatory Commission Room 370 611 Ryan Plaza Drive, Suite 400 County Government Center Arlington, Texas 76011 8064 San Luis Obispo, California 93408 Mr. Peter I '. Kaufman Mr. Truman Burns Deputy Attomey General Mr. Robert Kinoslan State of Califomia Califomia Public Utilities Commission 110 West A Street, Suite 700 505 Van Ness, Room 4102 San Diego, Califomia 92101 Sen Francisco, Califomia 94102 Mr. Thomas A. Moulia Mr. Steve Hsu Humboldt Bay Plant Manager

- Radiologic Health Branch Humboldt Bay Nuclear Power Plant State Department of Heatth Services 1000 King Salmon Avenue Post Office Box 942732 Eureka, Califomia 95503 Sacramento, Califomia 94232 Chairman, Humboldt County Board Diablo Canyon Independent Safety of Supervisors Committee County Courthouse ATTN: Robert R. Wellington, Esq.

825 Fifth Street Legal Counsel Eureka, Califomia 95501 857 Cass Street, Suite D Monterey, Califomia 93940 Redwood Alliance P.O. Box 293 Arcata, Califomia 955.1 9

]

- - - - - - _ - - - -