Advises That Baseline Insp of Facility Maintenance Rule Program Will Be Conducted for Wk of 971215.Reference Material Encl
ML20199L424
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/18/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9712020018
Download: ML20199L424 (5)


Text

.

November 18, 1997 Mr. Donald A. Reid Senior Vice President, Operations Vermont Yankee Nuclear Power Corporatlon RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301

SUBJECT:

MAINTENANCE RULE BASELINE INSPECTION FOR VERMONT YANKEE

Dear Mr. Reid:

In a telephone conversution on November 13,1997, between Mr. Rich Rusin and Mr. Don Florek, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Vermont Yankee. The inspection is planned for the week of December 15,1997.

The inspection objective is to evaluate your performance to support compliance with the requirements of 10 CFR 50.65, " Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The inspection will be conducted using inspection Procedure 62706, " Maintenance Rule" and willinvolve a team of at least four inspectors.

The team will require ir. formation about your program for their in-office preparation for the inspection. This information is identified in the enclosure to this letter. Please provide this information to Mr. Florek by December 5,1997. Mr. Rusin has been advised of this request.

Thank you for your cooperation in this matter, if you have any questions regarding this inspection, please contact me at (610) 337-5211 or e-mail addrew GWM@NRC. GOV.

Sincerely, I

g/

t Glenn W. Meyer, Chief Operator Licensing and

, pL/

y Human Performance Branch Division of Reactor Safety j

Docket No. 50-271 971202C 018 971118 PDR ADJCK 05000271 kk,!! !

-. - -. = -. _..

9 9 4

Mr. Donald A. Reid 2

cc w/ encl:

R. McCullough, Operating Experience Coordinator -Vermont Yankee R. Wanczyk, Director, Safety and Regulatory Affairs G. Maret, Plant Manager J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Pov/er Corporation J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Ra<fiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts.

D. Lewis, Esquire G. Bisbee, Esquire J. Block, Esquire T. Rapone, Massachusetta Executive Office of Public Safety

. State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee D. Katz, Citizens Awareness Network (CAN) 9 l

= _

F Mr. Donsid A. Reid.

3 Distribution.w/ encl:

Region i Docket Room (with concurrences).

PUBLIC Nuclear Safety Information Center (NSIC)

NRC Resident inspector G. Morris, DRS 4

C. Cowgill, DRP D. Bearde, DRP W. Dean, OEDO K. Jabbour, NRR S. Bajwa, NRR R. Correia, NRR F. Talbot,- NRR inspection Program Branch, NRR (IPAS)

DOCDESK I

1

-~-s...-

-.l.

g ng-e-

-~

e e.

Mr. Donald A. Heid 4-h i

DOCUMENT NAME: A: MRILTR VY Tc receive a copy of thk docusment, Indicate la the bon C" a Copy without attachment /eiiclosure

  • E" = Copy with attachment / enclosure "N" = No copy OFFICE Rll QW1 l Rl/ t } #,

Rl/

Rll Rl/

NAME-

/

gg DATE 11/14/pf1

(/

11/\\$/9/ V 11/ /97 11/ /97 11/- /97 FICIAL RECORD COPY

REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION

  • 1.

Copy of Maintenance Rule Program anc all related procedures (covering all modes of operations) including those relating to expert panels, PRA, risk assessments and ranking, and scoping. Also, procedures used for assessing risk when taking-equipment out of service. If not included in the procedures, please provide the definition of availability and reliability used a+ the site.

  • 2.

List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.

' 3.

List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.

  • 4.

List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.

  • 5.

List of high risk and low risk significant SSCs. In this list also include: (1) low risk significant standby SSCs; (2) the top 20 low risk significant SSCs which missed the cut off; (3) the SSCs with risk significance different from that determined by PRA.

  • 6.

Assessments of risk significant and risk rankings. Risk reduction worth, risk t

achievement worth, and core damage frequency results, if applicable.

i

  • 7.

Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems, f

8.

Background explanations ( i.e. copies of " conditions adverse to quality reports" etc.)

for SSCs currently assigned to the (a)(1) category.

l 9.

Copy of any internal or external maintenance rule assessments.

10.

Current maintenance rule trending data.

  • 11.

Current performance criteria and goals for SSCs. Include a list of SSCs classified as

" inherently reliable" and/or "run to failure", if PRA used, provide PRA information such as reliability and availability basic events in the PRA used for risk ranking compared to performance criteria established for these SSCs.

12.

Qualifications and backgrounds for Expert Panel Members. Criteria used by the expert panel to determine risk significance for all modes of operation. Minutes from the last five expert panel meetings.

  • 13.

Summary of significant changes made to the PRA model since the IPE.

14.

Copies of equipment status documents (LCO logs, Equipment tagging logs, RO and SRO logs) for the last month of power operation.

Items identified with asterisk (*) are needed for in-office review prior to the inspection onsite.