ML20199L255

From kanterella
Jump to navigation Jump to search
Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Facility on 980408.GFES Will Consist of 100 Questions.Max Time Allowed to Complete exam,3 Hours & Passing Score 80 Percent
ML20199L255
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/05/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9802090161
Download: ML20199L255 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

g" "' %q UNITE D ST ATES

~,

.7 I*.

NUCLEAR REGULATORY COMMISSION

)-

REGION IV

%'t,

~

,f_

611 RYAN PLAZA ORIVE, SUITE 400 s

AR LINGTON, TEXAS 760118064 FEB 5 1998 G. R. Hom, Senior Vice President of Energy Supply Nebraska Public Power District 141415th Street Columbus, Nebraska 68601

SUBJECT:

GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION

Dear Mr. Hom:

The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 8,1998. The GFES will consist of 100 questions. The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score will be 80 percent, in order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing Branch. The letter must be received both in the Region and at NRC Headquarters by March 6,1998, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for edministration. The letter must certify that the candidates will have completed their fundamentals training by the date of the examination and are enrolled in your training prngram leading to an NRC operator or senior operator license. The letter must also !!st the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.

The address for the Operator Licensing Branch Chief is as follows:

Robert M. Ga;lo, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission Mail Stop OWFN 9 D25 Washington, DC 20555 f

9802090161 90 c= ^= = =0205=ma gguppnit

,a ej Nebraska Public Power District

-2 Approximately 2 weeks prior to the examination administration date, your designated facility

. contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)

Sincerely, 3

'4 Joh L, Pellet, Chief Operations Branch Division of Reactor Safety Docket No.:

50-298 License No.: DPR-46

Enclosure:

As stated cc w/ enclosure:

Ken McCall, Operations Training Supervisor Nebraska Public Power District P.O. Box 98

. Brownville, NE 68321 John R. McPhail, Geaeral Counsel Nebraska Public Power District 4

P.O. Box 499 Columbus, Nebraska 68602-0499 P. D. Graham, Vice President of Nuclear Energy Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 B. L. Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District P.O. Box 98 -

Brownville, Nebraska 68321 Dr. William D. Leech MidAmerican Energy 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303-0657

9 4

h#

p Nebraska Public Power District Mr. Ron Stoddard Lincoln Electric System 11th and O Streets Lincoln, Nebraska 68508 Randolph Wood, Director Nebraska Department of Environmental -

Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Aubum, Nebraska 68305 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 R. A. Kuctora, Department Director of Intergevommentai Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Kansas Radiation Control Program Director r

1 l

l

4 Nebraska Public Power District

-4 bec to DCB (IE42) bec distribution by RIV:

DRP Branch Chief.

Resident inspector R. Hall, NRR (OWFN 13-H 20)

Leah Tromper, OC/DAF/LFARB (TWFN 9-E-10)

RIV file L. Miller, TTD E. W. Merschoff, RA L. A. Hurley, GFES file

  • t i

e

,)

DOCUMENT NAME:, GFES1 -

Jte men,an a w.ww w w. c= =ew.=iew. T - cm.e.emen v - m em

[RN OB:LA

/[ [N C:OB 6@!

-l~

~

i l#1urley.

g,r~'

JLFellM"j '-

l s

~

02/j/98

// li 02/Q98

/ /98

/ 19 7

~j t

O OFFICIAL RECORD CE

~

~

1 m__.-a_m._.-m

e Enclosure Samole Reaistration Letter (Name)

Regional Administrator U. S. Nuclear Regulatory Commission Region (Number)

(Street Address)

(Citv. State Zio Code)

Dear (Name),

(Facility name) requests to have the (number) individuals listed below take the (soecifv BWR or PWR) generic fundamentals examination (GFE) eaction of the written operator licensing examination to be administered on (date). All the personnel are enrolled in the (facility name) operator licensing training program and will have completed the generic fundamentals portion of the program by the examination date.

Name Date of Birth Previous Docket No.

(Insert the name. date of birth. and the orevious Part 55 Docket Number (if anolir shle) for each oerson.)

The following personnel will have access to the examinations before they are administered:

Name Iltle (Insert the name and title of each oerson who will be alven access to the examinatians before thev are administered (e.o.. oroctors).

4:

The examinations should be sent to the following address:

Name Title Addiess Gly Slah.lio Code if you have any questions please contact (facility contact name) at (telechone number).

Sincerely, 3cg Name. title cc:

Chief, Operator 1.icensing Branch h;

- - - - -