ML20199K748
| ML20199K748 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 01/21/1999 |
| From: | Hannon J NRC (Affiliation Not Assigned) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20199K753 | List: |
| References | |
| TAC-MA0352, TAC-MA352, NUDOCS 9901270013 | |
| Download: ML20199K748 (3) | |
Text
,.
4 n
Mr. William T. Cottle January 21, 1999 President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadswonh,TX 77483
SUBJECT:
INSERVICE INSPECTION PROGRAM - RELIEF REQUEST RR-ENG-18, SOUTH TEXAS PROJECT, UNIT 2 (TAC NO. MA0352)
Dear Mr. Cottle:
By letter dated December 22,1997, STP Nuclear Operating Company (STPNOC) submitted a
[
request for relief from the ASME Code,Section XI requirements, to defer Code repair of a flaw ident;fied in the Essential Cooling Water System (ECWS) piping at the South Texas Project, Unit 2. The Nuclear Regulatory Commission (NRC) staff has reviewed the request as discussed in the enclosed Safety Evaluation.
1 The staff finds that the performance of an immediate Code repair would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The staff, I
therefore, concludes that STPNOC's proposed alternatives to the Code requirements are authorized pursuant to 10 CFR 50.55a(a)(3)(ii).
Sincerely, ORIGINAL SIGNED BY:
John N. Hannon, Project Director Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-499
Enclosure:
Safety Evaluation cc w/ encl: See next page l
QISTRIBUTION:
> Docket File PUBLIC PD4-1 r/f K. Brockman d*
EAdensam (EGA1)
JHannon CHawes TAlexion OGC ACRS f
Document Name: STPA0352.LTR
,.f OFC PMJED4-!
LA/PD4-1 BC/EQGB OGdhbIN Pk/PD4k1 NAME Tale (i CHa h [Bhi
/j][(fnM JHa\\inon
/98 II/ S /98 11/ Ik/98
//f3 h d
/98 h/k DATE
/
YES/NO YES/NO YES/M
/h hO y'EbNO COPY U
OFFICIAL RECORD COPY lG i
9901270013 990121
{
Ut N
5,3 5 (%_m m [g
.-v i
=
@ ct:oq
\\
4 0
t UNITED STATES l
s g
NUCLEAR RE!!ULATCRY COMMISSION 1
1 WASHINGTON, D.C. 20046 0001
'+9*****
,o l
January 21, 1999 t
l Mr. William T. Cottle i
President and Chief Executive Officer STP Nuclear Operating Company l
South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
INSERVICE INSPECTION PROGRAM - RELIEF REQUEST RR-ENG-18, SOUTH TEXAS PROJECT, UNIT 2 (TAC NO. MA0352)
Dear Mr. Cottle:
By letter dated December 22,1997, STP Nuclear Operating Company (STPNOC) submitted a request for relief from the ASME Code,Section XI requirements, to defer Code repair of a flaw identified in the Essential Cooling Water System (ECWS) piping at the South Texas Project, Unit 2. The Nuclear Regulatory Commission (NRC) staff has reviewed the request as discussed in the enclosed Safety Evaluation, j
The staff finds that the performance of an immediate Code repair would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The staff, therefore, concludes that STPNOC's proposed alternatives to the Code requirements are authorized pursuant to 10 CFR 50.55a(a)(3)(ii).
i Sincerely,
/
N John N. Hannon, Project Director Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
'~
Docket No. 50-499
Enclosure:
Safety Evaluation cc w/ encl: See next page I
i r
l
g.___._.___-_.
i I
l Mr. William T. Cottle l
STP Nuclear Operating Company _
South Texas, Units 1 & 2 oc:
Mr. Comelius F. O'Keefe Jack R. Newman, Esq.
Senior Resident inspector..
Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1800 M Street, N.W.
1 l
P. O. Box 910 Washington, DC 20036-5869 i
BayCity TX 77414 Mr. T. H. Cloninger Vice President l
A. Ramirez/C. M. Canady Engineering & Technical Services Cityof Austin STP Nuclear Operating Company i
Electric Utility Department P. O. Box 289 I
721 Barton Springs Road Wadsworth,TX 77483 Austin,TX 78704 i
Office of the Govemor 1
Mr. M. T. Hardt ATTN: John Howard, Director i
Mr. W. C. Gunst Environmental and Natural l
City Public Service Board Resources Policy h
P. O. Box 1771 P. O. Box 12428 San Antonio,TX 78296 Austin,TX 78711 Mr. G. E. Vaughn/C. A. Johnson Jon C. Wood Central Power and Light Company Matthews & Branscomb P. O. Box 289 One Alamo Center MailCode: N5012 106 S. St. Mary's Street, Suite 700 i
.Wadsworth,TX 74483 San Antonio, TX 78205-3692 INPO Arthur C. Tate, Director Records Center Division of Compliance & Inspection 700 Galleria Parkway Bureau of Radiation Control Atlanta, GA 30339-3064 Texas Department of Health 1100 West 49th Street Regional Administrator, Region IV Austin,TX 78756 l
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Jim Calloway Arlington,TX 76011 Public Utility Commission of Texas Electric industry Analysis D.G. Tees /R. L. Balcom P. O. Box 13326 Houston Lighting & Power Co.
Austin, TX 78711-3326 P. O. Box 1700 Houston,TX 77251 i
I Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street i
Bay City, TX 77414 I
l
\\
t.
_,