ML20199K336

From kanterella
Jump to navigation Jump to search
Special Rept Spr 86-002:on 860310-0425,Control Bldg Room Cb 36-06 Will Be Renovated to Accommodate New Alarm Station & Associated Computer Equipment.Licensee Has Taken Compensatory Action Per Tech Specs
ML20199K336
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/25/1986
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
SPR-86-002, SPR-86-2, NUDOCS 8604100085
Download: ML20199K336 (2)


Text

e I

South Carolina Electric & Gas Company Den A.Nauman c *

. P.O. Box 764 Vice President Columbia, SC 29218 Nuclear Operations (803) 748-3513 SCE&G March 25, 1986

.3 i ; ' ',t, ' 2.

A 7 : 0' Dr. J. Nelson Grace Regional Administrator U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 86-002)

Dear Dr. Grace:

Attached is a Special Report for the Virgil C. Summer Nuclear Station. This report is submitted pursuant to the requirements of Section 6 of t'a e Technical Specifications.

Shou ld there be any questions, please call us at your convenience.

ry tru y yours, v

D. . Nauman RJB: DAN / led Attachment c: V. C. Summer K. E. Nodland O. W. Dixon, Jr./T. C. N ichol s , Jr. R. A. Stough E. H. Crews, Jr. G. O. Percival E. C. Roberts R. L. Prevatte J. G. Connelly, Jr. J. B. Knotts, Jr.

W. A. Williams, Jr. S. D. Hogge Group Managers I& E Was hing ton O. S. Bradham Document Management D. R. Moore Branch C. A. Price INPO Records Center W. T. Frady ANI Library C. L. Ligon (NSRC) NPCF R. M. Campbell File 1

l l

l 8604100085 860325 g PDR ADOCK 05000395 S PDR

0 i

i Dr. J. Nelson Grace i SPR 86-002 1 Page Two March 25, 1986 i

{ EVENT DESCRIPTION

! During the period of March 10, 1986 to approximately April 25, 1986,

! Control Building Room CB 36-06 will be renovated to accommodate a new alarm station and associated computer equipment.

>f Renovation includes:

1 A '. Erection of new two hour fire-rated walls 'for Room CB 36-06 l A, B, C.

I

! B. Installation of new-HVAC system and modification of existing i ductwork.

1

C. Modification of the three inch fire header.

I D. Modification of the sprinkler system.

I j E. Installation of a Halon 1301 system.

a j Because of the length and extent of renovation, fire barrier material / penetrations will exceed the Technical Specification limit.

i 1

J l ACTION TAKEN i

j The Licensee has taken the compensatory action as required by the

} Technical Specifications.

4

)

1 F

l.

d 1

i 4

i A

4 i

. , , . , - , - , , - . . ~ , - . . , , . , ,

.,,-,,..,--n,,, -,n.n ,,.,--,_~.,.--a. ,.,,nm-,,,--,, --,.,,-,m.~-r, - - - , . , . , . . . - - -