WISCONSIN ELECTRIC POWER COMPANY
~
DOCKET N0. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 101 License No. DPR-24 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated May 8, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Conrission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisior.s of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with,the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8607090127 860625 PDR ADOCK 05000266 p
PDR l
i i
l Y
1 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-24 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.101, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective immediately upon issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Y n W b. [h YN w Timothy G. Colburn, Project Manager PWR Project Directorate #1 Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 25, 1986
I 49 4
/"
S UNITED STATES t,
NUCLEAR REGULATORY COMMISSION 1
p j
WASHINGTON, D. C. 20555
....+
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 POINT BEACH NUCLEAR PLANT, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 104 License No. DPR-27 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated May 8, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
= l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in.the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
l DPR-27 is hereby amended to read as follows:
l B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.104, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective immediately upon issuance.
FOR THE NUCLEAR REGULATORY COMMISSION y h.
Timothy G. Colburn, Project Manager PWR Project Directorate #1 Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 25, 1986
6 ATTACHMENT TO LICENSE AMENDMENT NOS.101 AND 104 TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 DOCKET NOS. 50-266 AND 50-301 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 15.3.3-5 15.3.3-5 1
i 1
1 I
l t
y_,,.,..,,
,,_,,._,n.,
i e
requirements of 15.3.3.C-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be placed in the cold shutdown condition.
a.
One of the assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
One heat exchanger or other passive component may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.*
l Two Unit Operation 1.
Both reactors shall not be made critical unless the following conditions are met:
a.
Three component cooling pumps are operable.
b.
Three component cooling heat exchangers are operable.
c.
All valves, interlocks and piping required for the functioning of the system during accident conditions and associated with the above components are operable.
2.
During power operation, the requirements of 15.3.3.C-1 may be modified to allow one of the following components to be inoperable at any one time.
If the systen is not restored to meet the conditions of 15.3.3.C-1 within the time period specified, one reactor shall be placed in the hot shutdown condition.
If the requirements of 15.3.3.C-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, that reactor shall be placed in the cold shutdown condition, a.
One of the three assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
One heat exchanger or other passive component may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.*
D.
Service Wap r System 1.
Neither reactor shall be made or maintained critical unless the following conditions are met:
- During the installation of an additional component cooling heat exchanger, one of the component cooling heat exchangers may be out of service for up to five (5) days.
This installation will take place during the period from July to September 1986.
Unit 1 15.3.3.5 Amendment No. 3,101 l
i
9 i
requirements of 15.3.3.C-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be placed in the cold shutdown condition, a.
One of the assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
One heat exchanger or other passive compor.ent may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.*
}
Two Unit Operation 1.
Both reactors shall not be made critical unless the following conditions are met:
a.
Three component cooling pumps are operable.
b.
Three component cooling heat exchangers are operable.
c.
All valves, interlocks and piping required for the functioning of the system during accident conditions and associated with the above components are operable.
2.
During power operation, the requirements of 15.3.3.C-1 may be modified to allow one of the following components to be inoperable at any one time.
If the system is not restored to meet the conditions of 15.3.3.C-1 within the time period specified, one reactor shall be placed in the hot shutdown condition.
If the requirements of 15.3.3.C-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, that reactor shall be placed in the cold shutdown condition, a.
One of the three assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
One heat exchanger or other passive component may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.*
D.
Service Water System 1.
Neither reactor shall be made or maintained critical unless the following conditions are met:
- During the installation of an additional component cooling heat exchanger, one of the component cooling heat exchangers may be out of service for up to five(5) days. This installation will take place during the period from July to September 1986, 15.3.3-5 Unit 2 Amendment No f, M,104