November 21,1997
)
Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster -
P.O. Box 270 Hartford, CT 06141 0270
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) SEABROOK
- On October 22,1997,the NRC staff completed the semiannual Plant Performance Review (PPR) of Seabrook. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC rnanagement to f acilitate planning and allocation of inspection resources. The PPR for Seabrc:& involved the p rticipation of all technical divisions in evaluating inspection results and safety po.89tmance information for the period April 1,1997 to October 1,1997.
PPRs provlje Nh? managemerit with a current summary of licensee performance and serve as inputs 1a the Nh; Systematic Assessment of Licensee Performance (SALP) and senior managem.... meef.)g (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Seabrook PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 12 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
Please note that this is an interim schedule and a more detailed listing will be issued in January 1998 as a part of the SALP report.
We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337 5183.
Sincerely, Original Signed By:
1 Richard J. Conte, Chief Reactor Projects Branch 8 l
Division of Reactor Projects l
Docket Nos. 50-443
Enclosure:
Inspection Plan 9g2010001971121 5
^"
- 2 ll!8ER]RJI!s,gg
a Mr. Ted C. Feigenbaum 2
cc w/oncl:
B. D. Kenyon, President - Nuclear Group D. M. Goebel, Vice President - Nuclear Oversight F. C. Rothen, Vice President Work Services D. B. Amorine, Vice President Nuclear Engineering & Support Officer R. N. Johannes, Director Nuclear Training B. L. Drawbridge, Executive Director - Services & Senior Site Officer A. M. Callendrello, L! censing Manager - Seabrook Station W. A. DiProfio, Nuclear Unit Director - Seabrook Station R. E. Hickok, Nuclear Training Manager Seabrook Station L. M. Cuoco, Senior Nuclear Counsel W. D. Meinert, Nuclear Engineer W. Fogg, Director New Hampshire Office of Emergency Management D. McEthinney, RAC Chairman, FEMA Rl, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. P. Forbesi, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Getman, Jr., Vice President and General Counsel Great Bay Power Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti Pollution League State of New Hampshire, SLO D. Toff t, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States
(
l e
f Mr. Te 1 C. Felgenbaum 3
i
?
QJatribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
PUBLIC t
NRC Resident inspector DRS Director, Region i DRS Deputy Director, Region i DRS Branch Chiefs, Region i DRP Director, Region l
~
DRP Deputy Director, Region I
.DRP Branch Chiefs, Region I E. Conner, DRP M. Oprendek, DRP C. O'Daniell, DRP Distribution w/enci(VIA E MAIL):
K. Kennedy, OEDO A. Wang, PD l 3, NRR A. DeAgario, PD l-3, NRR R. Correia, NRR F. Talbot, NRR M. Callahan, OCA DOCDESK inspection Program Branch, NRR (IPAS) 1 DOCUMENT NAME: G:\\ BRANCH 8\\PPR\\SB1197LR.PPR To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP
.l Bl/DRP
[
l NAME EConner gA/,
RConte
/), /
DATE 11p/197 C 11bj/97 C /
OFFICIAL RECORD COPY
)
SEABROOK INSPECTION PLAN INSPECTION TITLE / PROGRAM AREA DATES COMMENTS
- IP 71001 Licensed Operator Requal Program Evaluation 11/17/97 Core inspection IP 81700-02 Physical Security Program 11/17/97 Core inspection IP 92903 Engineering Fellowup on M&TE issues 12/15/97 Regional Initiative IP 82301 Emergency Preparedness Exercise 6/1/98 Core inspection IP 81700-01 Physical Security Program 7/13/98 Core inspection Legend:
IP - Inspection Procedure TI - Temporary Instruction Core inspection
- Minimum NRC Inspection Program (mandatory at all plants)
+
Regional Initiative - Additional inspection Effort Planned by Region i 1
,