SENTINEL Amersham Corporation 40 North Avenue llurhngton, M A 01803 tel PHI) 272-2000 U. S. Nuclear Regulatory Commission tel (800) 815-1383 ATTN: Document Control Desk fax (781) 273-2216 Washington, DC 20555 Fax: 3014154555 30 Jan 98 Amersham Dear Mr. llaughney; This letter is in response to the NRC Bulletin 97-02 dated 23 Sep 97 and the revision to the bulletin dated 17 Oct 97.
The testing schedule for the Amersham Type B packages is attached. He model 660 (Certificate number 9033) is currently being tested and does not appear on the table. The remaining packages that are not listed in the retesting schedule will be terminated and this list is also attached. The termination requests will be sent in to the Transport Branch by 30 Jun 98. His time is neejed in order to notify users of these packages and provide for alternative transport options.
The testing schedule has been determined based on the following factors:
1 Information learned from our retesting of the model 660 package.
The limited availability of units that can be manufactured or used for testing, taking into account the level of detail of earlier fabrication and quality assursnce records.
The use of an outside resource to help in certain steps of the testing process.
' Please note that this schedule revises the dates Amersham committed to in response to cal 97-7-005. The amount of time and resources to conduct the retesting is much greater than originally anticipated, as we have learned during the 660 retesting.
I trust this provides the information requested by the bulletin. If you require any additional information, please contact me.
I Sincerely, Cathleen Roughan
{f}
}
Qj h_
Regulatory Afrairs and Safety Manager
- * ' *f cc:
Charles Haughney, Director Spsnt Fuel Project Offke 9902060143 900130 PDR ADOCK 0710 3
C 1
A RETESTING SCIIEDULE Certificate Number Package Model Test Report Complete 9035 680 7 Aug 98 9032 650 7 Aug 08 9269 650L 7 Aug 98 6613 702 13 Nov 98 9187 865 13 Nov 98 9107 771 19 Feb 99 9187-855 19 Feb 99 9148 770 28 May 99 9027 741 28 May 99 9029 676 3 Sep 99 c
9039 715 3 Sep 99 9166 864 10 Dec 99 PACKAGES TO BE TERMINATED Certificate Number Package model
-9126 20/20A 50/50A 9127 100/100A 200/200A 9006 500SU 684 9028 850 9147 920 9143 C-8 9128 3206B,3227B,3218 9167