November 24, 1997 MEMORANDUM TO:
John N. H:nnon Direct:r Project Direct:rcte ill 1, DRPW FROM:
Beth A. Wetzel, Senior Project Manager ORIGINAL SIGNED BY Project Directorate 1111, DRPW Tao J. Kim for
SUBJECT:
INDUSTRY WORKSHOP ON GENERIC LETTER (GL) 96-06,
" ASSURANCE OF EQUlPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN BASIS ACCIDENT CONDITIONS" DATE 8 TIME:
December 4,1997 8:00 a.m. - 5.00 p.m.
LOCATION:
Gaitliersburg Marriott 9751 Washington Blvd.
Gaithersburg, MD 20878 PURPOSE:
The NRC and NEl are jointly sponsoring an industry workshop on Gl. 96-06 issues in order to facilitate resolution of the GL 96 06 issues. Attached is an agenda for the workshop.
- PARTICIPANTE:
NRC participants are from the Office of Nuclear Reactor Regulation (NRR).
NRC NEl L. Marsh D. Modeen R. Wessman K. Cozens G. Hubbard K. Manoly B. Wetzel CONTAC O Beth Wetzel, (301) 415-1355
Attachment:
Meeting Agenda cc w/att: See next page l1 DISTRIBUTION: See attached page
' Meetings between NRC tecnnical staff and applicants or licensees are open fo, interested members of the public, petitioners, intervenors, or other parties to attend as observers
. pursuant to " Commission Policy Statement on Staff Meetings Open to the Public," 59 Eeneral Besitter 48340,9/20/94.
DOCUMENT NAME: G:\\VADOCS\\Gl.96C6\\D:iC.MTG To receive a copy of this documen*. indicate in the box Caco 0y w/o attachmentlenclosure E= Copy wnh attachment /endosure N = No copy OFFICE PM:PD31
,E LA:PD31 E
BC:SPLB.
I D:PD31,
[d ' *j 3g ktfWetzel CJamerson(f.tl LMarsh bk JHanrN
\\
[ tl' NAME M Yg7 ll /2{/97 [
', /#/97 H/2497 M
DATE-
/
[%
OFFICIAL RECORD COP'!
"~
ll!lll @ll ll ll lll [dh" bh~ hh L, hh "C
9711260kO9971124 PDR REV0P ERONUNRC d"
]
o th' clear Energy Institute cc:
David Modeen Director, Engineering Nuclear Generation Division 1776 I Street. NW Suite 400 Washington, DC 20006 3708 Kurt Cozens Project Manager Nuclear Generation Division 1776 1 Street. NW Suite 400 Washington. DC 20006-3708 i'.
l
-i AGENDA POR JOINT NRC/NEllNDUSTRY WORKSHOP DN GL 96-08 Dacanhar 4.1997 Morning Sannion 8:00 8:15 -
Opening Remarks NRC and NEl 8:15-8:40 -
Background, Charaderization of issues and Status of Reviews NRC 8:40 9:00 -
GL 96-08 Supplement 1 and GL 91 18 Rev.1 NRC 9:00 9:45 -
Waterhammer and Two Phase Flow Findings / Lessons Learned - NRC (Considerations for analytical solutions, Potential Supplement 2) L 9:45 10:00-Break 10:00 12:00 Industry Experience with Watsrhammer losue 12:00 1:00 -
Lunch Aftamoon Session 1:00 1:15-Opening Remarks - NRC and NEl 1:15 2:00 -
Thermal Overpressurization lasues - NRC (GSI 150, Use of Appelidix F Code Inquiries and Proposed Code Case) 2:00 3:00 -
EPRI Testing - EPRI 3:00 3:15-Break 3:15 4:00-
- Industry Experience with Thermal Overpressurization Issue 4:00 - 4:30 -
Risk /ReliaWiity insights - NRC and NEl 4:30 - 5:00 -
Summary Remarks and Future Activitias NRC and NEl ATTACHMENT o
o
>c DISTRIBUTION FOR GL 96-06 MF.ETING NOTICE DATED:- November 24, 1997 Hard Copy Centeal File PUBLIC PD# 31 Reading -
E-Mail S. Collins /F Miraglia (SJC1/FJM)
R. Zimmerman (RPZ)
E. Adensam (EGA1)
J. Hannon (JNH)
B. Wetzel(BAW)
C. Jamerson (CAJ1) i T. Martin (SLM3)
L Marsh (LBM)
R. Wessman (RHW)
- G. Hut, bard (GTH)
K. Manoly(KAM)
B. McCabe (BCM)
M. Tschiltz (MDT)
- G. Tracy (GMT)
T. Hiltz (TGH)
D. Screnci(DPS)
K. Clark (KMC2)
J. Strasma (RJS2)
- 8. Henderson (BWH)
M.' Hammond (MFH2)
PMNS C. Hehl(CWH)
J. Johnson (JRJ)
G. Grant (GEG)
T. Gwynn (TPG)
K. Perkins (KEP)
.~
_.