Notifies of 971104 Nrc/Nei Workshop on GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. Agenda for Workshop Encl
ML20199J310
Person / Time
Issue date: 11/24/1997
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Hannon J
NRC (Affiliation Not Assigned)
References
GL-96-06, GL-96-6, NUDOCS 9711280109
Download: ML20199J310 (4)


Text

-

November 24, 1997 MEMORANDUM TO:

John N. H:nnon Direct:r Project Direct:rcte ill 1, DRPW FROM:

Beth A. Wetzel, Senior Project Manager ORIGINAL SIGNED BY Project Directorate 1111, DRPW Tao J. Kim for

SUBJECT:

INDUSTRY WORKSHOP ON GENERIC LETTER (GL) 96-06,

" ASSURANCE OF EQUlPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN BASIS ACCIDENT CONDITIONS" DATE 8 TIME:

December 4,1997 8:00 a.m. - 5.00 p.m.

LOCATION:

Gaitliersburg Marriott 9751 Washington Blvd.

Gaithersburg, MD 20878 PURPOSE:

The NRC and NEl are jointly sponsoring an industry workshop on Gl. 96-06 issues in order to facilitate resolution of the GL 96 06 issues. Attached is an agenda for the workshop.

  • PARTICIPANTE:

NRC participants are from the Office of Nuclear Reactor Regulation (NRR).

NRC NEl L. Marsh D. Modeen R. Wessman K. Cozens G. Hubbard K. Manoly B. Wetzel CONTAC O Beth Wetzel, (301) 415-1355

Attachment:

Meeting Agenda cc w/att: See next page l1 DISTRIBUTION: See attached page

' Meetings between NRC tecnnical staff and applicants or licensees are open fo, interested members of the public, petitioners, intervenors, or other parties to attend as observers

. pursuant to " Commission Policy Statement on Staff Meetings Open to the Public," 59 Eeneral Besitter 48340,9/20/94.

DOCUMENT NAME: G:\\VADOCS\\Gl.96C6\\D:iC.MTG To receive a copy of this documen*. indicate in the box Caco 0y w/o attachmentlenclosure E= Copy wnh attachment /endosure N = No copy OFFICE PM:PD31

,E LA:PD31 E

BC:SPLB.

I D:PD31,

[d ' *j 3g ktfWetzel CJamerson(f.tl LMarsh bk JHanrN

\\

[ tl' NAME M Yg7 ll /2{/97 [

', /#/97 H/2497 M

DATE-

/

[%

OFFICIAL RECORD COP'!

"~

ll!lll @ll ll ll lll [dh" bh~ hh L, hh "C

9711260kO9971124 PDR REV0P ERONUNRC d"

PDR

]

o th' clear Energy Institute cc:

David Modeen Director, Engineering Nuclear Generation Division 1776 I Street. NW Suite 400 Washington, DC 20006 3708 Kurt Cozens Project Manager Nuclear Generation Division 1776 1 Street. NW Suite 400 Washington. DC 20006-3708 i'.

l

-i AGENDA POR JOINT NRC/NEllNDUSTRY WORKSHOP DN GL 96-08 Dacanhar 4.1997 Morning Sannion 8:00 8:15 -

Opening Remarks NRC and NEl 8:15-8:40 -

Background, Charaderization of issues and Status of Reviews NRC 8:40 9:00 -

GL 96-08 Supplement 1 and GL 91 18 Rev.1 NRC 9:00 9:45 -

Waterhammer and Two Phase Flow Findings / Lessons Learned - NRC (Considerations for analytical solutions, Potential Supplement 2) L 9:45 10:00-Break 10:00 12:00 Industry Experience with Watsrhammer losue 12:00 1:00 -

Lunch Aftamoon Session 1:00 1:15-Opening Remarks - NRC and NEl 1:15 2:00 -

Thermal Overpressurization lasues - NRC (GSI 150, Use of Appelidix F Code Inquiries and Proposed Code Case) 2:00 3:00 -

EPRI Testing - EPRI 3:00 3:15-Break 3:15 4:00-

- Industry Experience with Thermal Overpressurization Issue 4:00 - 4:30 -

Risk /ReliaWiity insights - NRC and NEl 4:30 - 5:00 -

Summary Remarks and Future Activitias NRC and NEl ATTACHMENT o

o

>c DISTRIBUTION FOR GL 96-06 MF.ETING NOTICE DATED:- November 24, 1997 Hard Copy Centeal File PUBLIC PD# 31 Reading -

OGC ACRS 1

E-Mail S. Collins /F Miraglia (SJC1/FJM)

R. Zimmerman (RPZ)

E. Adensam (EGA1)

J. Hannon (JNH)

B. Wetzel(BAW)

C. Jamerson (CAJ1) i T. Martin (SLM3)

OPA (OPA)

L Marsh (LBM)

R. Wessman (RHW)

- G. Hut, bard (GTH)

K. Manoly(KAM)

B. McCabe (BCM)

M. Tschiltz (MDT)

- G. Tracy (GMT)

T. Hiltz (TGH)

D. Screnci(DPS)

K. Clark (KMC2)

J. Strasma (RJS2)

8. Henderson (BWH)

M.' Hammond (MFH2)

PMNS C. Hehl(CWH)

J. Johnson (JRJ)

G. Grant (GEG)

T. Gwynn (TPG)

K. Perkins (KEP)

.~

_.