Text
_ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _
m
f M*O
UNITED STATES
g.
-
NUCLEAR REGULATORY COMMISSION
.
l'
{,
RE0loN IV
%'+,
g
611 RYAN PLAZA DRIVE, SulTE 400
o
s
AR LINGTON, T EMAS 760114064
JAN 2 81998
S. K. Gambhir, Division Manager
Engineering & Operations Support
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
,
Hwyi75 - North of Fort Calhoun
i
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/97-20 AND NOTICE OF VIOLATION .
Dear Mr. Gambhir:
An NRC inspection was conducted December 7,1997, through January 17,- 1998, at your Fort
Calhoun Station reactor facility. The enclosed report presents the scope and results of that
inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Fort
,
Calhoun Station was generally characterized by safety-conscious operations, sound engineering
I
and maintenance practices, and careful radiological controls. However, one cited violation of
NRC requirements was identified. The violation involved the use of operations memorandums
to direct operator actions such that, in effect, procedure changes were being implemented
without processing in accordance with Technical Specification requirements.
i
j
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the encicsed report. Please note that you are -
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure ecmpliance with regulatory
requirements.
< In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR). To the
extent possible, your response should not include any personal orivacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
/
Il ll Illill ll llll
.
9802050124 900128
ADOCK 05000285
Q
. ,.
- . _ . . _ . _ .
,
_
._.._.._ . _____ _
,_. _ ._ _._ _ _ .__ ___._ . _
_
.
-
'
5
Omaha Public Power District -
f2-
'
i
.
.
. . .
.
..
.
-
.
Should you have any questions concoming this inspection, we will be pleased to discuss them .
i:
!. with you.=
-
'
"
Sincerely, '
.
.
..
l
1 Willi
D. Johnson, Chief .-
Project Branch B 1
L,
Division of Reactor Projects--
-
Docket No.: 50-285
License No.: DPR-40 -
-
,
Enclosures:
.
l
2. NRC Inspection Report -
.U
50-285/97-20
..
- cc w/ enclosures:
l
James W. Tills, Manager:
. Nuclear Licensing
- L
Omaha Public Power District
- Fort Calhoun Station FC-2-4 Adm.
<
I
P.O. Box 399.'
Hwy. 75 - North oiFort Calhoun
Fort Calhoun, Nebraska 68023-0399
' James W. Chase, Manager
Fort Calbrun Station-
,
.
P.O. Box 399 -
- -
Fort Calhoun, Nebraska 68023
- Perry D. Robinson, Esq.
.
1--
Winston & Strawn
11400 L. Street, N.W.-
-Washington, D.C. 20005-3502
4
Chairman
Washington County Board of Supervisors
- '
Blair, Nebraska 68008
i
i
,
- '.
- _ -
- - .
. . - _ . _ - . _ , ._
.-
-
-
.
. _ - , . . _ . . . , _ . -
.
_ _ - _ _ _ _ _ _ _ _ _ - _
.
.
Omaha Public Power District .
3-
Cheryl Rogers, LLRW Program Manager -
Environmental Protection Section
,
= Nebraska Department of Health
l
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
I
L
.
. _ - _ _ .
. - - _ _ _ _ _ _ - - - - _
-____----- - -
4
.
Omaha Public Power District
-4
ggg g
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH):
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
,
E-Mail report to Richard Correia (RPC)
I
= E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
' bec distrib. by RIV:
. Regional Administrator
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
i-
Resident inspector
i
DOCUMENT NAME: R:\\_FCS\\FC720RP.WCW
To receive copy of document,indicato in box:"C" = Copy without enclosures "E" = Copy withynclosufes "N" = No copy
RIV: SRI:DRP/B
RI
PE:DRP/B
C:DRP/B U
WCWalker.ncY t*,
VGGaddyVM DNGraves P
WDJohn(8'n
1/ %98
P
1/ tt/98 f
1/1,9/98
1/g?/98
'
t
OFFICIAL RECORD COPY
_ - - - _ - _ _ _ _ _ _ _ _ _ _ _ - - -
_ _ _ -
..
..
,
- s
,
Omaha Public Power District'
-4-
A 28 m:
E-Mail report to TiFrye (TJF)
E-Mail report to T. Hilt::(TGH)- .
__ _
E-Mail report to NRR Event Tracking System (IPAS)'
E Mail r9 port to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
_
_.
E-Mail report to Frank Talbot (FXT)
b
gooADCD (IE01),%
bec distrik by RIV:
.
Regional Administrator
DRS-PSB
DRP Director
MIS System
- Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Rosident inspector .
1
050023
DOCUMENT NAME: R:\\ FCS\\FC720RP.WCW
..
To receive copy of document, indicate in boa:"C" = Copy wdhout enclosures "E" = Copy wepnclosures "N" = No copy
RIV:SRl:DRP/B
RI
PE:DRP/B
C:DRP/B []
WCWalker:ncY t~,
VGGaddyW DNGraves P
WDJohngifn
1/ @/981
7
il tt/98 V'
il1,9 /98
1/9 ?/98
'
OFFICIAL RECORD COPY
'
_____