ML20199H794

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/97-20 on 971207-980117 & Nov. One Violation Identified Re Use of Operations Memo to Direct Operator Actions Such That,In Effect,Procedure Change Being Implemented W/O Processing IAW TS Requirements
ML20199H794
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/28/1998
From: Johnson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20199H799 List:
References
50-285-97-20, NUDOCS 9802050124
Download: ML20199H794 (5)


See also: IR 05000285/1997020

Text

_ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _

m

f M*O UNITED STATES

.

g. NUCLEAR REGULATORY COMMISSION

-

l' {, RE0loN IV

%'+,

g 611 RYAN PLAZA DRIVE, SulTE 400

so AR LINGTON, T EMAS 760114064

JAN 2 81998

S. K. Gambhir, Division Manager

Engineering & Operations Support

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 ,

Hwyi75 - North of Fort Calhoun i

Fort Calhoun, Nebraska 68023-0399

SUBJECT: NRC INSPECTION REPORT 50-285/97-20 AND NOTICE OF VIOLATION .

Dear Mr. Gambhir:

An NRC inspection was conducted December 7,1997, through January 17,- 1998, at your Fort

Calhoun Station reactor facility. The enclosed report presents the scope and results of that

inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Fort ,

Calhoun Station was generally characterized by safety-conscious operations, sound engineering I

and maintenance practices, and careful radiological controls. However, one cited violation of

NRC requirements was identified. The violation involved the use of operations memorandums

to direct operator actions such that, in effect, procedure changes were being implemented

without processing in accordance with Technical Specification requirements. i

j

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the encicsed report. Please note that you are -

required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure ecmpliance with regulatory

requirements.

< In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room (PDR). To the

extent possible, your response should not include any personal orivacy, proprietary, or

safeguards information so that it can be placed in the PDR without redaction.

/

9802050124 900128

.

Il********

ll Illill ll llll

PDR ADOCK 05000285

Q PDR

. ,. - . _ . . _ . _ . , _ ._.._.._ . _____ _ ,_. _ ._ _._ _ _ .__ ___._ . _ _

-

.

'

5

'

Omaha Public Power District - f2-  ;

i

.

.

. . . . .. . -

. Should you have any questions concoming this inspection, we will be pleased to discuss them .  :

'

i:

"

!. with you.=

-

Sincerely, ' .

.

..

l

D. Johnson, Chief .-

1 Willi

Project Branch B 1

L, Division of Reactor Projects--  ;

-

Docket No.: 50-285

License No.: DPR-40 -

-

,

Enclosures:

. 1? Notice of Violation

l 2. NRC Inspection Report -

.U 50-285/97-20 ..

: cc w/ enclosures:

l James W. Tills, Manager:

. Nuclear Licensing

L Omaha Public Power District  ;

<

- Fort Calhoun Station FC-2-4 Adm.

I P.O. Box 399.'

Hwy. 75 - North oiFort Calhoun

Fort Calhoun, Nebraska 68023-0399

'

James W. Chase, Manager

. Fort Calbrun Station- ,

P.O. Box 399 -

- Fort Calhoun, Nebraska 68023

- Perry D. Robinson, Esq. .

1-- Winston & Strawn

11400 L. Street, N.W.-

4 -Washington, D.C. 20005-3502

Chairman

'

Washington County Board of Supervisors

Blair, Nebraska 68008

i

i

,

'.

- _ -

- - . . . - _ . _ - . _ , ._ .- - - _ . . _ - , . . _ . . . , _ . - .

_ _ - _ _ _ _ _ _ _ _ _ - _

.

.

Omaha Public Power District . 3-

Cheryl Rogers, LLRW Program Manager -

Environmental Protection Section ,

= Nebraska Department of Health

l

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

I

L

.

. _ - _ _ . . - - _ _ _ _ _ _ - - - - _

-____----- - -

4

.

Omaha Public Power District -4

ggg g

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH):

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) ,

E-Mail report to Richard Correia (RPC) I

= E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

' bec distrib. by RIV:

. Regional Administrator DRS-PSB

DRP Director MIS System

Branch Chief (DRP/B) RIV File

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

i- Resident inspector

i

DOCUMENT NAME: R:\_FCS\FC720RP.WCW

To receive copy of document,indicato in box:"C" = Copy without enclosures "E" = Copy withynclosufes "N" = No copy

RIV: SRI:DRP/B RI PE:DRP/B C:DRP/B U

WCWalker.ncY t*, VGGaddyVM DNGraves P WDJohn(8'n

1/ t%98 P 1/ tt/98 f 1/1,9/98 '

1/g?/98

OFFICIAL RECORD COPY

_ - - - _ - _ _ _ _ _ _ _ _ _ _ _ - - - , _ _ _ -

.. ..

s

,

Omaha Public Power District' -4-

A 28 m:

E-Mail report to TiFrye (TJF)

E-Mail report to T. Hilt::(TGH)- . __ _

E-Mail report to NRR Event Tracking System (IPAS)'

E Mail r9 port to Document Control Desk (DOCDESK) _

E-Mail report to Richard Correia (RPC) _.

E-Mail report to Frank Talbot (FXT)

gooADCD

b (IE01),%

bec distrik by RIV: .

Regional Administrator DRS-PSB

DRP Director MIS System

- Branch Chief (DRP/B) RIV File

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

Rosident inspector .

1

050023

DOCUMENT NAME: R:\ FCS\FC720RP.WCW ..

To receive copy of document, indicate in boa:"C" = Copy wdhout enclosures "E" = Copy wepnclosures "N" = No copy

RIV:SRl:DRP/B RI PE:DRP/B C:DRP/B []

WCWalker:ncY t~, VGGaddyW DNGraves P WDJohngifn

1/ @/981 7 il tt/98 V' il1,9 /98 ' 1/9 ?/98

OFFICIAL RECORD COPY

'

_____