Informs of Review Status of Topical Rept, RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model:Fuel Assembly Exposure Evaluation, Including Suppls 1 & 2 That Siemens Power Corp Submitted in Sept 1996 & Aug 1997
ML20199H236
Person / Time
Issue date: 01/30/1998
From: Essig T
NRC (Affiliation Not Assigned)
To: Curet H
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
NUDOCS 9802040447
Download: ML20199H236 (2)


Text

___ _________ _ _ _ _ _ _

January 30, 1998 Mr. H. D. Curet, Manager e Product Ucensing Siemens Power Corporation 2101 Horn Rapids Road P. O. Box 130 Richland, WA 99352 0130

SUBJECT:

TOPICAL REPORT "RODEX2A (BWR) FUEL ROD THERMAL MECHANICAL EVALUATION MODEL: FUEL ASSEMBLY EXPOSURE EVALUATION,"

EMF 85 74(P), REVISION 0, REVIEW STATUS (TAC NO. M06726)

Dear Mr. Curet:

The purpose of this letter is to inform you of the r ,iew status of the subject topical report, including Supplement 1 and 2 that Siemens Power Corporation (SPC) rubmitted in September,1996 and August,1997, respectively. The topical report requests NRC approval for rod average burnup of 62 Gwd/MTU for BWR fuei c;esign and assembly-average bumups of 54 Gwd/MTU for ATRIUM

  • 9 and 10 fuel designs. Currently, the technical evaluation report (TER) has been completed and the safety evaluation report (SER) is in the concurrence process. As of today, the following staff has concurred in this SER: '

the technical reviewer (Reactor Systems Branch), the Section chief (Reactor Systems Branch), and the Branch Chief, Reactor Systems Brench.

Please note that this SER is still subject to additional changes and requires a Committee To Review Generic Requirements (CRGR) waiver to be approved by the Associate Director for Technical Paview before the SER can be officially issued. The next step in this process is to obtain the concurrences from the Division Director of Systems Safety and Analysis and the Associate Director for Technical Review. This process normally requires two to three weeks to complete, if you have any questions regarding this matter please contact Mr. Egen Wang of my staff i by phone 301/4151076 w email eyw@nrc. gov.

Sincerely, Melioda Malloy for/

Thomas H. Essig, Acting Chief Generic issues end Environmental Projects Branch Office of Nuclear Reactor Regulation DISTRIBUTION:

Contral File PUBLIC GHolahan TEssig

!)

FAkstulewicz SWu TCollins LPhillips Db2

  • 4 EWang PGEB r/f OGC Ai:RS Document Name: rvw-stts.ser Ifld OFFICE PGEB 4 g SC:PGEBfArjh PC:SRXB ,

AC:PGEB NAME l EWang FAkstulewicz YEssig pCQ TCollinh '

DATE 01/h98 01/30/98

, 01m/98 01/3o!98 OFFICIAL RECORD COPY

$20&& &y , ,

                                                                                                      ?b M.

nas FRf CENTER COPY mw

 .       OAtog y*          pk                                                                                    UNITED STATE 6 s*              }                                                                       NUCLEAR REGULATORY COMMISSION
                 '$                                                                               WA&!HNQToN. D.C. 3066164001 k......'/

January 30. 1998. Mr. H. D. Curet, Manager Product Licensing Siemens Power Corporation 2101 Horn Rapids Road P. O. Box 130 Richlanci, WA 99352 0130

SUBJECT:

TOPICAL REPORT "RODEX2A (BWR) FUEL ROD THERMAL MECHANICAL EVALUATION MODEL: FUEL ASSEMBLY EXPOSURE EVALUATION," EMF 85 74(P), REVISION 0, REVIEW STATUS (TAC NO. M96726)

Dear Mr. Curet:

l The purpose of this letter is to inform you of the review status of the subject topical report, including Supplement 1 and 2 that Siemens Power Corporation (SPC) submitted in September,1996 and August,1997, respectively. The topical report requests NRC approval for rod average burnup of 62 Gwd/MTU for BWR fuei design anti assembly-average burnups of 54 Gwd/MTU for ATRIUM". 9 and -10 fuel des:gns. Currently, the technical evaluation report (TER) has been completed and the safety evaluation report (SER) is in the concurrence process. As of today, the following staif has concurred in this SER: the technical reviewer (Reactor Systems Branch), the Section chief (Reactor Systems Branch), and the Branch Chief, Reactor Systems Branch. Please note that this SER is still subject to additional changes and requires a Committee To Review Generic Requirements (CRG9) waiver to be approved by the Associate Director for Technical Review before the SER can be officially issued. The next step in this process is to obtain the concurrences from the Division Director of Systems Safety and Analysis and the Associate Director for Technical Review. This process normally requires two to three weeks to complete. If you have any questions regarding this matter please contact Mr. Egan Wang of my staff by phone 301/4151076 or email eyw@nrc. gov. Sincerely,

                                                                                                                  !     M$x.        ut$$Yb      '
                                                                                                         \ Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Offics of Nuclear Reactor Regulation