ML20199G999

From kanterella
Jump to navigation Jump to search
Forwards Page 9 of 29 of Status & Description of Listed Commitments from Portsmouth Gaseous Diffusion Plant
ML20199G999
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 01/20/1999
From: Wells R
UNITED STATES ENRICHMENT CORP. (USEC)
To: Ferez J
NRC
References
NUDOCS 9901250086
Download: ML20199G999 (2)


Text

.. - -.. - _.... - -

. - - ~. ~.. -. - - -

l Tw T

IN FACl!.fTY ISSUE 4f TASKlp DUE DATE COAIMfrMENTIESCRil* TION STATUS Q

R ci M.

PORTS 09 CPI-POA-X09.02 12/2/96 1he procedural changes to se.sulve abe aJministralise concosnpliances in Complete Issue will be reopened see USEC j

the Nuclear Criticality Safety Program (fnem SAR Section 5.2.4 and as letter GDP 98 0264 g

identined in the Summary of Requiscinents and Corumitments table o

b below) will be completed by December 2,1996.

?

R CPI-POA-X09.03 Transition All aspects ofTechnical Safety Requirement 3.9 implernentatioa and its Complete issue will bc scopened see USEC qw associated tentac!cs fos NCS will be in place no lates than the transition letter GDP 984264 to NRC segulatory evenight is to CPI-POA-XO9.05 On Going if a saw or revised NCSE identifies the need for modifications to she Complete is:ue will be scopeacd see USEC cnisting plant configwalion, affected activities will be curtailed and wi!I letter GDP 984264 not be restated until either (1) the plant configeiration is modified or (2) the activity is rnodified so that it can be pedermed safely in the current configuration. If the plant coaliguration or activity is smodified, the Plant Operations Roitw Corumistee uill review the proposed modification psiur to its resumption to verify that the adivity, as modified, can be pi;rformed safely.

10 CPI-POA-X10.01 3131/96 A list of managers who sequise amiaing for oversight of nuc! car criticality Closed issues will be developed.

CPI-POA-X10.02 3/31/96 Individuals equiring training uiti comp!ste the designated NCS manager Closed training course.

11 CPI-POA-Xil.01 9/3Gr96 USEC will provide criticality detecaer covesage in all areas of she plant Complete t3 eacept for those areas identified andjusti6cd by USEC and approved by til NRC Asalyses abat psovide the technicaljenstification for not providing criticality accident alarm system coverage in designated areas of the plant art being developed, Except fos Buildings X-330, X-333, and X-700, analyses have been submitted to NRC that (1) verify the adequacy of the esisting criticality accident alarm systern and its detector locations for detecting a criticality accident and (2)jenstify abat defectors are not required for recaitoring other ascas of the plant.1hc analyses for g

Buildings X-330, X-333, and X-700 will be completed by Sepiersbes 30, 1996.

8 813 S

N 9901250006 990120 9

'PDR ADOCK 07007002 L C

PDR L Enass.ac I. rm 94ze i

m

]M LbdsLG 301 564 3210 P.01/02 d

'j{)RGOV USEC A Global Energy Company 6903 Rockledge Drive Bethesda, MD 20817-1818 Telephone 301-564-3200 Fax 301-564-3201 http://www.usec.com Fax Memorandum Date:

Time:

c l

To:

u C tv cc nrc f Fax:

Phone:

From:

Russ WtIls Fax:

301 564-3210 Phone:

301 564-3245 Number of Pages:

(including cover sheet) m e-(

ce//

Subject:

JW r

\\>

C. C C,('f c h {L b

I

~

~

IMPORTANT: This facs' anile is intended only for the use of the indMdual or entity to which it is addressed. It may contain information that is prMieged, cor:fldential, or otherwise protected from disclosure under applicable law, if the reader of this transmission is not the intended fecipient or the employee of agent responsiDie for delivenng the transmission to the intended recipient, you are hereby nottfied that any dissemination, distribution, copying or use of thrs transmission or its contents is strictty prohibited, if you have received this transmission in error, p) esse notify us by telophoning 301/564-3200 and retuming the original to us at the above address.