ML20199G866

From kanterella
Jump to navigation Jump to search
Ack Receipt of ,Addressing 3 Examples of Violation Cited in Insp Rept 50-440/97-07,issued on 971024.Recinds Violation Examples 97007-01a & 97007-01c.Response to Example 97007-01b Acceptable
ML20199G866
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/28/1998
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
References
50-440-97-07, 50-440-97-7, EA-98-034, EA-98-34, NUDOCS 9802040357
Download: ML20199G866 (4)


See also: IR 05000440/1997007

Text

. ,

a

set \\

UNITED STATES

8

NUCLEAR RECULATORY COMMISSION

.

'

AEGION ill

}

801 WARRENVILLE ROAD

,

.

LISLE. ILLINOIS 60532-43$1

.....

January 28, 1998

EA 98034

Mr. Lew W. Myers

Vice President Nuclear

centerior service company

P. O. Box 97, A200

Pony, OH 44001

Dear Mr. Myers:

Thank you for your louer dated November 24,1997, addressing the three examples of a violation

cited in 'repecue , Report No. 60 440/97007 that was forwarded by our letter dated October 24,

,

1997. In your letter, you stated that you were contesting examples 97007 01a and 97007-01c of

1

the violation. You accepted example 97007 01b.

We have reviewed the information you provided fu example 97007 01a and, based on this

review and on our discussions of this issue with the Technical Specification (TS) Branch in NRR,

we have determined that this violation should be rescinded. The action to look the reactor mode

owhch in the shutdown position within one hour aner TS Limiting Condition for Operation (LCO)

3.3.1.2 la entered was moved from the TS to the TS ' ssis durin9 the TS improvemord Program.

a

Once this action was put in the basis, h was no longer required to lock the mode switch in the

shutdown position. Therefore, a procedure to perform this action was not needed, rad although

the operator's performance did not meet your expectations, no violation occurred when the

operator failed to lock the mode switch in shutoown within one hour after entering the T8 LCO.

'

Regarding Violation 97007-01c, we have reviewed the additionalinformation you provided and

have concluded that no violation occurred during leak testing of the emergency closed cooling

valves on June 10,1997. The basis for our determination was that tie initial bench test was

intended fer predictive and informatioral purposes to identify makr leakages as you stated in

/

i

your response. We agree anor the review of the information you provided that the work order

was sufficient to cover this type of test. Had we known that the test was for predictive and

g

Informational purposes, no violation would have been issued. Therefore, this violatiori is hereby

l

rescinded.

Due to our reclaion of violation examples 97007 01a and 97007-01c, we reviewed example

'

97007 01b to determine if this example warranted a ottation on its own. We concluded that,

based on the fact that your corrective actions for this example were not completed and specific

corrective actions were not committed to prior to the end of the inspection, it r'id not meet the

j

- orHerla for a Non CMed Violation established in Section Vll.B.1 of the NRC Enforcement Policy.

We have reviewed your response to this example of a violation and find the response

'

acceptable. Your actions relative to this example of a violation will be reviewed during a fature

NRC inspection.

-

-

.llllllllllII,ll:illpl[Illlll

9902040's57 990128

i

PDR

ADOCK 05000440

hQ

g" -p/

'

O

PDR

,

.-

.

- - -

_ _ , _

__

l

L Myers

2-

N you have any questions regarding this matter, please contact Mr. Tom Kozak of my stan at

(630) 829 9866.

.M.

ab

uo -

James L caldwell

'

Deputy Regional Administrator

,.

Docket No. 50440

Docket No. 50 441

oc:

H. L Hegrat, Manager

Regulatory Affairs

T. S. Rausch, Director, Quality

and Personnel Development

R. W. Schrauder, Director

,

Nuclear Enginwing Departmord

'

W. R. KarW,a, General Manager

Nuclear Power Plant Department

N. L Bonner, Director, Nuclear

Maintenance Department

H. W. BergendaN, Director

Nuclear Services Department

Ohio State Liaison Offwar

Robert E. Owen, ONo

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

i

.

..

._

..

..

.

_,

.

.

L Myers

-2-

if you have any questions regarding this matter, please contact Mr. Tom Kazak of try stan at

(630) 829-9066.

Sincerely,

/s/ James L. Caldwell

James L Caldwell

Deputy Regional Administrator

Docket No. 50-440

Docket No. 50-441

oc:

H. L Hegret, Manager

Regulatory ANairs

T,8. Rausch, Director, Quality

and Personnel Development

R. W. Schrouder, Director

Nuclear Engineering Department

W. R. Kanda, General Manager

Nuclear Power Plard Department

N. L Bonner, Drector, Nuclear

Maintenance Departmord

H. W. Bergendahl, Director

Nuclear Services Departmord

Ohio State Liaison Omoor

Robert E. Owen, Ohio

Departmord of Health

C. A. Glaser, State of Ohio

Pubite Utilities Commission

Dinitibutiotr

Docket Fine

DRP

J. Ueberman, OE

PUBUC IE 01

Rill PRR

J. Goldberg, OGC

Project '?:r+;;+:, NRR

CAA1 (E-mail)

R. Zimmerman, NRR

A. B. Beach

Rill Enf. Coordirrtor

T88

Deputy RA

DR8 (2)

SRI Perry

DOCDESK(E4 nail)

SEE PREVIOUS CONCURRENCE 8

DOCUMENT NAME: G:\\PERR\\PER97007.TY

ve ,es.t. e em se me. - hideem he to boa *C' = Copy metod emeshanweestmous *P i Om ute aussemmah estmous

  • w* - mees.e

_ , ,

OFFICE

Rill

Rill

Rill

Rill

Rill,

h

NAME-

Jackiw;oo

Kozak

Clayton

Grant

DATE

01/ /98

01/ /98

01/ /98

01/ /98

01/h

OFFICIAL RECORD COPY

,

.

.-

.'

.

L. Myers

2

If you have any questions regarding this matter, please contact Mr. Tom Kozak of my staff at

-(830) 829 9086.

sincerely.

-

A. Bill Beach

Regional Administrator

Docket No. 50 440

Docket No. 50-441

cc:

H. L. Hegrat, Manager

Regulatory Affairs

T. 8. Rausch, Director, Quality

and Personnel Development

R. W. Schrauder, Director

-

Nuclear Engineering Department

W. R. Kanda, General Manager

Nuclear Power Plant Department

N. L. Bonner, Director, Nuclear

Maintenance Department-

H. W. Bergendahl, Director

Nuclear Services Department

Ohio State Liaison Officer

Robert E. Owen, Ohio

Department of Health-

- C. A; Glazer, State of Ohio

Public Utilities Commission

Distnbution:

. Docket File

DhP

PUBLIC IE-01

Rlli PRR

Project Manager, NRR

CAA1 (E mail)

A.B. Beach

Rill Enf. Coordinator

Deputy RA-

DRS (2)

TSS-

=

DOCDESK (E-mail)

SRI Perry

DOCUMENT NAME: G;Wrr%per97007.ty

4,

w e . e.,

,,u

c . e

,,v

OFFICE

Rlli

Rill

6

Rill

Rlil

Rill

,,

NAME

JackWMg) Kozak @

Claytogh Grantdk Beach

DATE

01/4 98

01/4 98

01d96h

01/"fb8

01/ /98

OFFICIAL RECORD COPg*

$.5$

-

- . ..

-

. . . .

. .

. .,

.

-_