Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review 1999-09-30
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20196H5611998-11-30030 November 1998 Forwards Amended Ust Registrations for Millstone Station. Notification Supersedes Previous Registrations & Includes Documentation of in-place Abandonment of Seven Usts at Unit 1 Tank Farm ML20238F4581998-08-31031 August 1998 Forwards Copies of Decommissioning Cost Studies for Millstone Station & Maine Yankee.W/O Encl B17357, Informs That Scheduled Completion Date for Evaluation of Performance of Executive Review Board,Is Revised from 980701 to 0814.Commitments Made by Util,Encl1998-07-0101 July 1998 Informs That Scheduled Completion Date for Evaluation of Performance of Executive Review Board,Is Revised from 980701 to 0814.Commitments Made by Util,Encl B17358, Informs That Scheduled Completion Date for Review of ECP File 142 Revised from 980701 to 0901.Schedule Change Necessary Because Concerned Individual Requested Concern Be Put on Hold in Mar 19981998-07-0101 July 1998 Informs That Scheduled Completion Date for Review of ECP File 142 Revised from 980701 to 0901.Schedule Change Necessary Because Concerned Individual Requested Concern Be Put on Hold in Mar 1998 B17222, Revises Schedule for Completion of Previous Regulatory Commitment.Table Which Identifies Actions Committed to by Util in Ltr,Listed1998-04-30030 April 1998 Revises Schedule for Completion of Previous Regulatory Commitment.Table Which Identifies Actions Committed to by Util in Ltr,Listed B17087, Revises Scheduled Completion Date of Commitments as Listed1998-02-27027 February 1998 Revises Scheduled Completion Date of Commitments as Listed B17016, Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Commitment Schedular Change.Encl Table Identifies Actions Committed by Util1998-01-31031 January 1998 Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Commitment Schedular Change.Encl Table Identifies Actions Committed by Util B16958, Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Employee Concerns Program.Encl Table Identifies Actions Committed by Util1998-01-21021 January 1998 Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Employee Concerns Program.Encl Table Identifies Actions Committed by Util B16851, Provides Response to Little Harbor Consultants,Inc Recommendations Included in 970825,0922 & 25 Ltrs to Nrc. Listing of Commitments Contained in Ltr1997-12-29029 December 1997 Provides Response to Little Harbor Consultants,Inc Recommendations Included in 970825,0922 & 25 Ltrs to Nrc. Listing of Commitments Contained in Ltr ML20197B1891997-12-17017 December 1997 Forwards Slides Used During Presentation of Findings, Developed as Result of Oversight Activities,To NRC Commissioners on 971212 ML20199G8571997-11-18018 November 1997 Forwards Slides Used During 971113 Little Harbor Consultants Presentation to Licensee & NRC B16858, Forwards Change to Commitment Made by Util in Response, & Revised in Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting. Revised Commitment,Listed1997-11-14014 November 1997 Forwards Change to Commitment Made by Util in Response, & Revised in Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting. Revised Commitment,Listed ML20199A2831997-11-12012 November 1997 Summarizes Verbal Notification to B Kenyon on 971106,that Little Harbor Consultants,Inc Was Concerned About Certain Circumstances within Quality Control Group Which Were Getting Worse & Needed Mgt Attention B16783, Provides NNECO Response to Clarifications of Info Communicated by Little Harbor Consultants,Inc During 970722 Meeting.Listed Commitments Contained within Ltr1997-11-0707 November 1997 Provides NNECO Response to Clarifications of Info Communicated by Little Harbor Consultants,Inc During 970722 Meeting.Listed Commitments Contained within Ltr ML20199A5661997-11-0707 November 1997 Forwards Test Results of full-scale Testing of Hydrazine Testing at Millstone Station,Unit 2.Notification That All Discharges as Authorized by Temporary Authorization Were Discontinued on 971027,provided B16842, Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting1997-11-0303 November 1997 Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting B16812, Submits Change to Commitment Made in 970924 Response to Recommendations Made During 970722 Meeting1997-10-16016 October 1997 Submits Change to Commitment Made in 970924 Response to Recommendations Made During 970722 Meeting ML20198J8291997-10-10010 October 1997 Requests Extension of Temporary Authorization for full-scale Testing of Hydrazine Treatment ML20211F2821997-09-25025 September 1997 Forwards Slides Used During Presentation at 970924 Meeting at Millstone Plant as Result of Oversight Activities B16685, Forwards Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting.List of Util Commitments Provided1997-09-24024 September 1997 Forwards Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting.List of Util Commitments Provided ML20216J3171997-09-0404 September 1997 Requests Ltr of Confirmation of Understanding Re Operation of Portable Air Compressor for Millstone Nuclear Power Unit 3,testing of Svc Air Sys ML20210T2331997-09-0202 September 1997 Requests Temporary Authorization Per Section 22a-6k of CT General Statutes to Conduct Test Treatment of Wastewaters within Condensate Polishing Facility Waste Neutralization Sumps at Plant,Unit 2 ML20216F0991997-08-29029 August 1997 Forwards Quarterly Aquatic Toxicity Monitoring Rept for Jul 1997 for Millstone Station, Discharge Serial Numbers 001A,001B,001C & 006.All Test Acceptable Except for Dsn 001A ML20216E0521997-08-28028 August 1997 Forwards Corrected Page 7 & Water Quality Data Summary Table to May 1997 Discharge Monitoring Rept ML20216E0781997-08-28028 August 1997 Submits Notification of Discharges of Wastewater Containing Small Amounts of Hydrazine Above Detection Limits for Month of August 1997,as Requested ML20217Q4431997-08-26026 August 1997 Informs That Daily Composite Sampling Protocol Used by NNECO for Discharge Serial Number 006 May Have Resulted in Time Intervals Between Certain Samples in Excess of Sixty Minutes.Will Readjust Automatic Sampler ML20210P5761997-08-21021 August 1997 Provides Clarification of Certain Info Little Harbor Consultants,Inc Provided During 970722 Meeting ML20217N3961997-08-15015 August 1997 Clarifies Info Re Sampling & Reporting of Results at Certain Discharge Locations & Updates Dept of Environ Protection on Actions Taken at Plant to Rectify Concerns About Compliance W/Npdes DMR Reporting Requirements,Per ML20216J2981997-08-13013 August 1997 Informs That Util Authorized to Discharge Hydrazine in Accordance W/Limitations,Terms & Conditions Specified in NPDES CT0003263 Issued on 921214 ML20210S6041997-08-11011 August 1997 Identifies Interim Solution for Millstone,Unit 3 Which Will Remove Chlorine from Strainer Backwash Discharge.Application for Emergency Discharge Authorization Forwarded ML20217Q8211997-08-11011 August 1997 Withdraws NPDES Permit Modification Request as Amended on 960620.By Agreement NNECO May re-submit All Parts of Request in Future Without Prejudice ML20210J7591997-08-11011 August 1997 Forwards Slides,Including Textual Responses to Structured Interviews Used During 970722 & 970806 Presentation of Findings & Recommendations Developed as Result of Oversight Activities at NNECO ML20151K8801997-08-0101 August 1997 Provides Examples of Discrepancies Leading to Conclusions Presented During 970722 Presentation to NRC & NNECO ML20198F5161997-07-31031 July 1997 Forwards Monthly Discharge Monitoring Rept for June 1997 for Millstone Nuclear Power Station ML20198E8961997-07-25025 July 1997 Forwards Ecological Studies Proposed for 1998 at Mnps, Per Paragraph 7 of NPDES Permit CT0003263,Ref 1 B16617, Provides Response to Recommendations Made by Little Harbor Consultants,Inc During 970603 Meeting1997-07-24024 July 1997 Provides Response to Recommendations Made by Little Harbor Consultants,Inc During 970603 Meeting ML20141H2821997-07-0909 July 1997 Forwards Corrected Discharge Monitoring Repts & Suppl Info from Dec 1995-Apr 1997.Clarification That Unit 1 Circulating Water Pumps Did Not Discharge During Quarter Due to Extended Refueling Outage,Provided B16529, Forwards Response to Recommendations Made During 970513 Meeting & Reflected in & Submits Commitments1997-07-0606 July 1997 Forwards Response to Recommendations Made During 970513 Meeting & Reflected in & Submits Commitments ML20149F3281997-07-0202 July 1997 Forwards Revised Discharge Monitoring Repts 920401-970331 & 970430 ML20140C8811997-06-0505 June 1997 Forwards Slides Used During 970603 Meeting Presentation, Adjusted to Reflect Discussion Points & Examples Used ML20148K8071997-05-28028 May 1997 Submits Individual Permit Application for Temporary Operation of Detroit Diesel Ptms 900 Compressor.Fee Paid ML20140D8461997-05-27027 May 1997 Forwards Summary of Util Position Re Discharge of Hydrazine from Dsn 001C-6,per Agreement at 970320 Meeting ML20148C7201997-05-21021 May 1997 Forwards Slides Used During Presentation,Adjusted to Reflect Discussion Points & Example Used ML20141F6261997-05-0606 May 1997 Repts Activities Which Include Discharge of Wastewaters from RBCCW Sys Via Dns 001B-2 & Seawater from RBCCW Sys Drains Via Dsn 001B-9 ML20141F2141997-04-28028 April 1997 Forwards 1996 Annual Rept Entitled, Monitoring Marine Environ of Long Island Sound at Millstone Nuclear Power Station,Annual Rept 1996. W/O Encl ML20138F0581997-04-25025 April 1997 Provides Written Notification & follow-up to Notification Telcon Made on 970422,that Util Has Taken Steps Necessary to Correct Situation Re Emission Reduction Credits ML20137N4941997-03-31031 March 1997 Forwards Discharge Monitoring Rept for Month of Feb 1997 ML20138F0491997-03-31031 March 1997 Submits Details of Planned Performance of Certain Maint Activities Associated W/Mnps Unit 1 Svc Water Sys,As Discussed Via 970218 Telcon ML20140C4061997-03-31031 March 1997 Forwards Rev to Jan 1997 Discharge Monitoring Rept B16348, Forwards Annual Low-Level Radwaste Rept for Millstone Site for 1996, by Ltr1997-03-26026 March 1997 Forwards Annual Low-Level Radwaste Rept for Millstone Site for 1996, by Ltr 1998-08-31
[Table view] |
Text
. . - . . .
ar
.- - Little Harbor Consultants,Inc.
Millstone -ITPOP Project Office i
' P.O. Box 0630 Niantie, Connecticut 06357-0630 Telephone 860-4471791, ett 5966 Fax 860-444 5758 November 18,1997 ITPOP 97-0049 Bruce D. Kenyon President and CEO Northeast Nuclear Energy Company P.O. Box 128 Waterrord, CT 06385-0128
SUBJECT:
November 13,1997 Little Harbor Consultants Presentation Little Harbor Consultants, Inc. (LHC) presented Sndings and recommendations, developed as a result of our oversight activities, to Northeast Nuclear Energy Company (NNECo) and the Nuclear Regulatory Commission (NRC) at a meeting on November i3,1997. The meeting was held in the Millstone simulator building and was open for observation by the public. This letter forwards the slides used during the presentation, if you have any questions or require further explanation on any of our Sndings or recommendations please do not hesitate to contact me.
Very truly yours, N
John M. Griffin // j 1 Deputy Team Lea , OP Little Harbor Consultants, Inc.
[h i I \
Attachment -
cc: Distribution 9711250320 971119 25 DR- ADOCK 0
"' lilEIEllyllE!Rl!Rilli
F .
ITPOP 97-00049, Page 2 Novernber 18,1997
.- t Dis'ribution:
D.M. Goebel, NNECo Charles Brinkman Manager WasMngon & clear Operatiom P. leftus* NNECo ABB Combustion Engineering Nuclear Power K. M. McBrien, NNECo 12300 Twinbrook Pkwy, Suite 330 -
RockMHe, W 20852 W. J. Temple, NNECo S. Baranski, NNECo Mr. John Buckingham Depanment of Mc UtH3y Control M. Quinn, ECOP Electric Unit 10 Liberty Square U.S. Nuclear Regulatory Commission Nev. Jritain, CT 06051 Attn: Document Contiol Desk Washingtort DC 20555 Citizens Regulatory Conunission ATTN: Ms. Susan Perry Luxton U.S. Nuclear Regulatory Commission 180 Great Neck Road Atta: W.D. Travers Waterford CT06385 hhil Stop: 014D4 Washington, DC 20555-0001 Citizens Awareness Natwork 54 Old Turnpike Road U.S. Iluclear Regulatory Commission Haddam, CT 06433 Attn: P.F. McKee Mail Stop: DI AD4 The Honorable Terry Concannon Washington, DC 20555-0001 Nuclear Energy Adsisory Council Legislative Office Building U.S. Nuclear Regulatory Comnussion Hartfc;d, CT 06106 Attn: H.N. Partis Mail Stop: 014D4 Mr. Evan W. Woollacott Washington, DC 20555 0001 Co-Chair Nuclear Energy Advisory Council Mr. Wayne D. Lam.ing 128 Terry's Plain Road Deputy Director ofInspections Simsbury, CT 06070 Special Projects Office 475 Allendale Road Ernest C. Hadley, Esquire King of Prussia, PA 19406-1415 1040 B Main Street Kevin T, A. McCanhy, Director P.O. Box 549 West Wareham, MA 02576 Monitoring and Radiation Division Department of Environmental Protection Mr. Paul Choiniere 79 Elm Street Hartford, CT 061tv127 "The Day" 47 Eugene O'Neill Drive Allan Johanson, Assistant Director New London CT 06320 Offi:e of Policy and Management Bob DeFayette Policy Development and Planning Division 100 Kings Street 450 Capitol Avenue-MS 52ERN Gettysburg, PA 17325 P.O. Box 341441 Hartford, CT 06134-1441 Don Beckman 1071 State, Route 136 First Selectmen Belle Vernon, PA 15012 Town of Waterford Hall of Records 200 Boston Post Road Waterford, CT 06385
g-
= .,- ,
4
INDEPENDENT sNVESTIPATION OF ALLEGATIONS OF RFYALIATION "'
AND HANDLING OF TriE TRAINING '***$".*,'#,",,Q'"*"'dN*M*in t, y,,,, tn DISCIPLINARY ACTION Protected Activities.
- NNECO Should Anticipate and Take .
Little Harbor consultants Appropriate Action to Consider and MM6 gate.
Presentation to the impact and Potential" Chilling Effect" That '
NRCS NNECu Could ResuN When D6ecipline la Announced, November 13,itey Particularly Where Persons Disciplined Nave Seen involved in Protected Activttles.
a n se ,,,,ne,
t-4 LHC EXPECTATIONS EXECUTIVE
SUMMARY
- N Retallationis Alleged, NNECo Should fake 4
immed6 ate and Adequate Action to Specir6cally R ts the Consensus of LNC That the July 23, Respond to and Investigate the Allegations of 1997, Disciplinary Act6on Was Not in Retallation
- Retallation. for Employee involvement in Legally Protected '
- NNECo Should Conduct en Adequate Activtt6es.
investigation of " Chilling EMect" Which M6ght Resuit Prom the Discipline and Take Timely 4
and Appropriate Action to MMigate the "ChlNing ENect."
=qym a t
b.
EXECU, NE
SUMMARY
OVERSIGHT OF MILLSTONE EMPLOYEE CONCERNS 4
m in Aiso the Consonous of LNC that NNEco:
- 06d Nei Enocovely Aneci,ete and rien tne PROGRAM
- Disciphnery Actens to Avo6d orMeninese Any
Uttle Harbor Consultants
- 06d Not Conduct en Adequete Investeetkn of
- Once Rotenet6on Wes Attaged, Presenta6on to or Tate 7tnely AcDon to Mitagste the 'Ch8kil ' NRC & NNEco
- Old Not Fusy Inveetagste Allegettons of P etenetton.
-q r =*
57..
, 1 4
i
.. . - . . . - . . - - . = _ . .. . . . - . .
, s 1
4 ACTIVITIES COMPLETED DURING - - ACTIVITIES COMPLETED DURING LHC CONTINUING REVIEW OF ECP LHC CONTINUING REVIEW OF ECP
"."M *seme roes - 12 ECP Staff Members
. rs acer ese- nei w e ne.wter 6, ec,
. ECP mwedy mePats Dwe > the me* Pumat 11 Employees Prom the **New" Filea
- 8 Employees Prom the "Old" Filee
. meces is ew hac(f est,f 4347 f N ti,t64&
s7,tt444 - 4 NNEco Offkers
. Jes,e mvesieseene owsmanes, new e
= scoe mapwee n smeste tCP
. a.cP manuet new t J
3.,mc.
g..; ees e t
r---
ACTIVITIES COMPLETED DURING CONCLUSION LHC CONTINUING REVIEW OF ECP AREAS ADDRESSED s . DDoerved Activttnes Aaeocwted wth the concern e Organization and Leadership Procese:
- OUnllRCatton and Training
- . Miehes . RCoP Debnetag ef ECP
. Start moeilnes, ECP and . p.,,, g,,, op ang , Program Definition
" " . Nuties owwslurd e Program Implementation
- TvWning et EcP Rosenese vennsesen kwetigmars pan, . Intake
. Taage . Stuttes owwsight All
- Innstigation - Documentation Hande mesung . Closure . Reporting
. Clos se Panas
. Ecetownes posewees . Employee Satturactun . Administration
= Eneautive Revsew of ECP me.m, no,en Jo .e me.ane i
e g..j u. e e g..j u. i.
L CONCLUSIONS: CONCLUSIONS:
ORGANIZATION & LEADERSHIP QUALIFICATION AND TRAINING
- Ace ptable ECP Staft Quahfication Guidelines Have
- ECP Resources Heve increased. ***"I'"""*"****#""*****""***'"'""*'
- ELi Organizational 8 Structure Has Stabilized. Seing Meviewed and Documented Perthe Outdennes.
- ECP Staff Morsie Has imptoved,
- Tratams for intate and inveet>gations Has improved, e' Management Presence and involvement Has . Adequate Training on Identifying Potentut
' improved, . operablHty and Reportablitty lasues Has Been
. ECP Management's "Sig P6cture" Provided to the tcP staff.
Understanding Of Collective ECP issues
- Additional Training in HIRD and Sensitivity in Deakne
. Neetas To improve. Wth Employees is Needed.
.e .;u. u ey;n. ,,
2
. l d
l l
l I
CONCLUSIONS: - CONCLUSIONS:
PROGRAM DEFINITION PROGRAM IMPLEMENTATION
- Ahernettve Management Methods for g '
Receiving and Processing Concerne Are Now -
- Improwe end includesValidaten WHh Employee.
Being Conducted in a Consletent Manner. .
- The Resun for Empseyw Coming to ECP who
- Accepteble Common Guidehnes for Deahng hannagement le Acenewledged but Normerly Not With Concerne Have Been Estabhehed; acwd upon, implementat6on le Yet to Be Evolueted. . inves er e teneeloperobtiety e and Reperentulety -
. Contractore Are Not Required to Have EsR interviews.
^***".""*8U"'N"
or convend
- o. - g .;. .n ,,
.= g, u..
CONCLUSIONS: CONCLUSIONS:
PROGRAM IMPLEMENTATION, Cont. PROGRAM IMPLEMENTATION, Cont.
Investicatkn Closure power Mehrreio end Addeen of M* Staff to RCP is
- Closure PeMis Are EffectNe in Defmang Correceve Actions and Communicetmg With Management.
en improvement.
- All Concerns Are Not Recemng Constetent
. Quality of invoetegetiene to taproving,
"'"D*#O'""""'*'*'8**""*"""""*8'"
- ECP Review and Centrol of Meterred invesepetens
- Masing leaues Have im proved.
- Inappropetste Resolueenclosure
- Moseng Trends y .y.. ..;.ja.
CONCLUSIONS: CONCLUSIONS:
PROGRAM IMPLEMENTATION, Cont. PROGRAM IMPLEMENTATION, Cont.
Employee Satisfaction Analysis & Trendinn *
- Se% Of the Employees Contacted Exprueed
- The ECP Data home has been improved.
Diesenetecaen and Wsuld Not use tne ECP Again. . 'Seg Picture
- Analyets and Trondlag of Conective Concerne la Not Seing Performed and Reported in a
- Communwesen With Employees la ineneettve:
. Na en.een ow.s in pruou er = Roseionen . .
annre empeeree undereennsme end hyan.
- Cleeure Leners to Employene Are onen Impereenal
- and uncieer.
- ,,,= g
- g. .
3 l-
t CONCLUSIONS: CONCLUSIONS:
PRouRAM IMPLEMENTATION, cont. PROGRAM IMPLEMENTATION, cont.
Documentation .Reportina
- Compliance With the ECP Manual is improving.
- The ECP Monthh Report has improved.
. Tine un of Coneem eu. neekioisaweips riie . eCe is Pr.sen.no summ.., inform.iien te execuove Organtration. Enagement on a Monthly Basis,
. Ce rn. Chroneiosion Lee enme .re ineens .nt. . en.c. nos Th..e pr.ena.on. i. sai nano evoium.d
.,.,..m.
..gme.
CONCLUSIONS: LHC RECOMMENDATIONS FOR ECP PROGRAM IMPLEMENTATION, cont. PROGRAM
. increaw Contact With employees Throuonaut the Administration Process, Partsculatty at Resolution;Obtain Employee
. ilksits-Faceted Concems Are Not Classmed. Counted reedback at Resolution, and Tracked AsindMdualConcerns. . Improve the integrated Assessment of AN Concems
. Securtty of Wm Files Has imp.,ved, but Seeg for to identry Problem Areas 6n a femely Manner.
Working Files m Annes 3 is Not Adequate. . Provide Additional Training to ECP Staff on HIRD and Sensitivny in Deanng With Employees.
. There to No MonWn0 of Off-Sne Centracsar Employee Concem Requirements. . Require s More Consistent Closure Process for Au Concems.
si sms:. u
- s. we, =a me.
7 LHC RECOMMENDATIONS FOR ECP LHC RECOMMENDATIONS FOR ECP PROGRAM PROGRAM
. mmain wn.nu .f invutioatien ounty, and . Cinswy, Count ead f run indudni inwoo rrem Anure Tn.t Av enun Assaw.d Wah a Concem Mum-faceted Concems ae indmdni Concerns.
Are Mentwad au Ad*ened. . en.or, once Contreet., Regwrement, Are
- Report Why lasues Are Coming to ECP vs.Une implemented, Management in the Monthly Report.
- Modify the Estt Process to Assure AN Contractors
. Require Conceme With Operatusty or ReportaotutY Receive an Exit Intervtew.
Potential to be Documented on CRs.
- Ensure That Commen Guldettnes Are Used by AN Organiaations Processang Concerns, r .m e wo me. p
- y. ae.wme.
4
LHC RECOMMENDATIONS FOR ECP PROGRAM COMPREHENSIVE PLAN
- Improve ECP Pie secutuy en Annes 3. EFFECTIVENESS
. emplement EcP staff Quattricetion noview and oceveeni. con n.gwr.m.n .
. ,,i nu.i sneuw cio.ny conn. negwres Little Harbor Consultants Chroneisgical Log Entn.s (e.g. Employos Centacts, Ptesentation to ca e's,inaee.l NRC & NNECo November 13,1997 a
w - = c. .
g=, - -u.
AREAS EXAMINED BY LHC CONCLUSIONS:
+ ' Safety Conscious Work Environment . A Significant Number of HIRD Concerns (SCWE) Results. Are Currently Being Received and
- Employee Concerns Oversight Panel.
Substantiated by ECP, a Site Training. . Actions to Address Known Problein'.
and Problem Areas Are Not Beint implemented in a Timely Manner.
,.y. u pu. r .e --e. .
CONCLUSIONS: CONCLUSIONS:
- ECDP's Chartet is Broader Than the CP Management Activities Are Not Requirements ar.4 Duplicates some sCws Activities.
Adequately Coordinated,
- ECOP Findings and information Are Not Communicated to ECP. sCWE, and Line Management in e Timely Manner.
= w =see = ene w = c.
! 5 l
t .
.9 4
t
- 4 CONCLUSIONS: CONCLUSIONS:
- _ Current Training Courses for Managers
- The ECi Presentation in " Managing for and Supervisore Are Not Sumclent for Nuclear Safety"is Not Being Managing Concems in the Current Consistently Delivered to Environment: Communicate:
- Man *9ern*nt EXPedabons for ECP;
- Lacking in the Areas of Protected Activities,
- How ECP Conducts Business; Retalladon, and Chilling Effects.
- How Employeea Should Interface With ECP.
- j. f 1
CONCLUSIONS: LHC RECOMMENDATIONS ,
- NNECO M*n*9'm'at MU81 ProvM'*f*h6P
- EmploMe Are Not Being Trained on to Correct Problem Areas in a Timely Manner, SCWE and ECP: . Develop improved Mechanisms for
. A Key Employee Course, Partnership Communicating, Coordinating and Effectively Beyond 2000" Has Been on Holo Since the Acting on information Between EC', ECOP, Training Department Shutdown, SCWE Oroup and Management.
- Narrow ECOP Activttles to Pocus on Greatest SCWE Needs of the Organizatie in a Timely Manner, 7
agg = r.c. n -
w w me. a.
I
'LHC RECOMMENDATIONS' LHC RECOMMENDATIONS
- Communkate ECOP Pindings and
- improve the ECP Training Segment Necommendations on a Realtime Basis to included in " Managing for Nuclear ECP the SCWE Oroup and Line Management So The; Can Act on the Results. 88Y'
- Provide AseconalTraining for Managers and Resume Employee Training on SCWE supervisors Thet Adequately Covers and ECP.
Protected Acuvit6es, Retal6ation, and Ch6lling EWect. :
m - _ .n c w =w. m
_ = == w, me.
4 4
6
.o ..
e CONCLUSIONS: MEASURING EFFORTS TO IMPLEMENT A SA7ETY
- A Significant Number of HIRD Concerns CONSClOUS WORK Are Currently seing Received and ENVIRONMENT AT MILLSTONE Substantiated by ECP. a ConsuMants
- Actions to Address Known Problems "'"""*"'"
and Problem Areas Are Not seing " ""
implemented Iri a Timely Manner. No m
,.,,,;,.,--. c ,,,.,,--.
LHC APPRDACRTO MEKSURWG-LHC's OVERALL MISSION: OVER. NNEco IS BASED ON OVERSIGHT SEE IMPLEMENTATION OF SCWE PLAN
- From Oversight Plan: "... oversight will ' Oversight Plan Identifles 11 Attributes Usually continue until such time that the NRC deter. Present When Strong Safety culture Exists.
mines that [NU) has demonstrated by its per.
formance that the conditions ...have been
- AGditional Attributes May Be Added Based on corrected and that safety issues raised by LHC Observations.
- mployees are being evaluated and resolveu
- LHC la Continuously Monitoring for Presence in a timely manner,a of These Attributes Throughinterviews,
- LHC's Oversight Activttles Focus on All Program Reviews, and/or observations.
a Aspects of NNECo's Erforts to tmprove the a
Safety quitur.t timplement a Sqwg1 STATUS INDICATORS FOR SCWE STATUS REPORT IS PRELIMINARY IMPLEMENTATION EFFORTS AND PARTIALLY COMPLETED
~~
meets supectet6ons . LHC Has Completed Some Kay Activities Approachino - Structured Interviews Espectettons - ECP and CAP initial Reviews (dettel R
- Other Oversight Activities Still Ongoing a
i.,ttor w gg;;g, - Com,,ehen*e Pian Enoc e-se Re*w -
- Ads 'lonal structured interviews liiii.h went g - Closure of ECP and CAP Reviews
._Weeknese t one. i ener ee -s si.4* 4 o.onee - CQatinul%Ditit1Y8tl9A91}IltACllYllif 8 7
.-- . . . . . _ -. _ . - ~
e
.e LHC ASSESSMENT OF SCWE 1
'LHC ASSESSMENT OF SCWE -
IMPLEMENTATION STATUS IMPLEMENTATION STATU?.
'"""" "^""' "*"
pc manna rmacaam=. ama-- o ,. . w n c "3.r.n a 3 e e ce 5, ea se . ... .. is
.truso,.e.e. . pensy th.t cP41.64 h4 jl *
.ct" .n ce i 4$n ce v . .564.n i .
n,,.
sh.amne...
...,...t.l et r 'ile.r.n.
- w. e.CP.S.nes..
(
c v,
a u.e . m
..w,
.G ,b.ni.n n., e. 4 i
- s. East.n.
m- . - . , ,. , . - - .
LHC ASSESSMENT OF SCWE NNECo PERFORMANCE IMPLR1ENTATION STATUS MEASURES inc a-umm. ==mc. aaa"= aima SAFETY CONSClOUS WORK c...."" ENVIRONMENT
.i.. .. .e =ina .,.e .. i. - t ne .e .. .a.c
.. .na.iin, e
Little Harbor Consultants
',=4ea;8 .;'=gyd saad
.sen e s., ..un i. Presentation to I N'*'"*"*'*** NRC& NNEco November 13,1997 Example g r. . -,.-,,.,--.
~
LHC ATINiBUTES A6 DRESSED BT~
LHC SCWE ATTRIBUTES NOT MILLSTONE PERFORMANCE g INCLUDED IN NNECo ATTRIBUTES MEASURES _1
. Employee Perceptions of SCWE Policy. . Employee Perceptions of SCWE Policy.
. Mutual Respect for People at All Levels. . Worti Force Has sense of identity.
. No Evidence of an Atmosphere Causing a . Mutual Respect for People at e i ll Levels.
"ChMng Noct." . HIR&D Events are Rare; Management Reaction Timely.
- -me. .
e.
.,w w .-
8
' LHC AffitTBlfEEiNdT ERC7TTRTeTTE!FADDREHEHV--'
MILLSTONE PERFORMANCE ADDRESSED BY MILLSTONE ,
MEASURES PERFORMANCE MEASURES a ido Evidence of en Atmosphere Causing a + Senior Management Endorsement of SCWE
- Effective and Efficient Corrective Action
- Senior Management Provides Adequate -
Program. Training.
- ECP Progrem is Vigorous and Effec 0ve.
- Employees Exhibit a Questioning Attitude.
+ Self Assesernents Are Effective.
- Positive Recognition to Employees Who identify Safety issues.
- gma. . - - g g--.
E i
f-4 9
, - _ _ _