Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/97-18 & 50-301/97-18.Violation Associated W/Failure to Calibr Emergency Plan Self Reading Dosimeters IAW Procedures
ML20199G832
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/19/1997
From: Grove J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-97-18, 50-301-97-18, NUDOCS 9711250314
Download: ML20199G832 (2)


See also: IR 05000266/1997018

Text

-

. .-

.

- -

'

.o:

9 g,,, 0

4

,.

i

November 19, 1997

!

l

Mr. S. A Patuiski

,

'

Site Vice President

Point Beach Nuclear Plant

Wisconsin Electric Power Company

6610 Nuclear Road

Two Rivers, WI 54241

r

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORTS 50 266/97018(DRS),

50-301/97018(DRS))

Dear Mr. Datulski:

This will acknowledge receipt of your letter dated Noven.9er 3,1997, in response to our

i

letter dated October 4,1997, submitting a Notice of Violation sssociated with the failure to

~

-'

calibrate emergency plan self reading dosimeters in accordance with your procedures. We

have reviewed your corrective actions and have no further questions at this time. These

corrective actions will be examined during future inspections.

Sincerely

Original Sfqned by Gary L. shear (for)

'

John A. Grobe, Director

Division of Reactor Safety

Docket Nos. 50 266,50-301

License Nos. DPR 24, DPR 27

4/

Enclosure:

Ltr dtd 11/03/97, S. A. Patulski

l

Wisconsin Electric Power Company

to USNRC

See Attactled Distribution

v.

.

..

w., e n., .~ . .~

w.1

DOCUMENT NAME: G:DRS\\ pol 11 7.DRS

c

c . c.

.n--.

= . ,m

,

OFFICE

Rlli

l c. Rlli

lc RIN

/

3l11

,. ]

s

NAME

KLambert:Jp 6LG& GShear A5

JMcCo W

Jr robe

St. 4

DATE-

11//p/9f

11/A/97

11/A 97 N

11/M/97

"

OFFICIAL RECORD COPY

y

I

9711250314 971 19

PDR

i

.

---

.=

.

.._

9

4

l

!

.,

S. A. Patuiski .

2

November 19, 1997

i

'

.

-

.

cc w/o encl:

R. R. Grigg, President and

Chief Operating Officer, WEPCo

'

,'

A. J. Cayla, Plant Manager

t

- cc w/ encl:

B. D. Burks, P.E., Director

i

Bureau of Field Operations

Cheryl L Parrino, Chairman,

_ _

.

Wisconsin Public Service Commission

'

State Liaison Officer

Distribution.

Docket Fi!e w/ encl

Rlli PRR w/encI

Rlli Enf, Coordinator w/enci

!

'

PUBLIC IE-01 w/enci

. SRI, Pt. Beach w/enci

TSS w/enci

,

- OCFO/LFARB w/enci

LPM, NRR w/enci .

DOCDESK w/enci

DRP w/ encl

A. B. Beach, Rlli w/ encl

CAA1 w/enci

DRS w/ encl

J. L. Caldwell, Rlll w/enci

-,

?

I

,

!

l

i

,--.

3

.y %. . . ,, , _ , . , _

y

. _ .

,_

.

.,

y.

-m.,,-.,m.,-

- , ,,.

  1. .

. . , . ,_

.,,, .,

. . ,

. -

-

l

.

t

,.

04

Wisconsin

Electnc

.

POWER COMPANY

Poht Beoch Nuclear Pbnt

(920)IS232I

6610 Nuclear Rd., Two Rtvers, WI 54241

NPL 97 0703

10 CFR 2.201

.

November 3,1997

Document Control Desk

U. S. NUCLEAR REGULATORY COMMISSION

Mall 3tation Pl.137

War.itngten DC 20555

Ladies / Gentlemen:

DOCKETS $d 266 AND 50-301

RE11EID A NOTICE OF VIOLATION

NRC fNSPECTION REPORT NOS. 50-266/97018 AND $0-301/97018

POINT HEACII NUCLEAR PLANT. UNITS 1 AND 2

in a letter from Mr. Joim A. Grobe dated October 4,1997, the Nuclear Regulatory Commission

forwarded the results of an inspection conducted by your staff at our Point Beach Nuclear Plant from

August 25 29,1997. This inspection report included a Notice of Violation which identified a violation

of NRC requirements.

We have reviewed the Notice of Violation and, pursuant to the provisions of 10 CFR 2.201, have

prepared a written' response to the violation as requested by your letter of October 4,1997, Our written

response is included as an attachment to this letter.

We believe that the attached reply is responsive to the Notice of Violation and fulfills the requirements

identified in your October 4,1997 letter.

If you have any questions or require additional information regarding this response, please contact me.

Sinec ly

-

%c

'

A . Ca

Plan

anager

Poiry 1 ach

ear Plant

Attachment

cc:

NRC Regional Administrator -

NRC Resident Inspector

PSCW

T!!!O70090Jpp,

d" #" # * *'# " U " *"

"I M

'

-

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___

_

_ _ _ - _ - _ _ - -

_ _ ______ __ _ _ ___-__ _ _ _ - _ _ _

9'4

4

$

DOCKETS 50 266 AND $0 301

,

REPLY TO A NOTICE OF VIOLATION _

NRC INSPECTION REPORTS 50 266/97018 AND 50-301/97018

POINT BEACH NUCLEAR PLANT UNITS 1 AND 2

During an NRC inspection conducted from August 25-29,1997, a violation ofNRC

g

requirements was identified. Inspection Reports 50 266/97018 and 50 301/97018 and the Notice

of Violation (Notice) transmitted to Wisconsin Electric on October 4,1997, provide details

_

regarding the violation.

-

In accordance with the instructions provided in the Notice, our reply to the vioktion includes:

(1) the reason for the violation, or if contested, the basis for disputing the violation; (2) the

corrective action taken and the results achieved; (3) corrective action to be taken to avoid further

violations; and (4) the date when full compliance will be achieved.

Violationt

"Techtdcal Specibeation L5.6.11 requires, in part, that radiological control proce

and made available to all station personnel, and shall state permissible radiation exposure levels.

The radiation protection program shall meet the requirements of 10 CFR Part 20.

Ilealth Physics Calibration Procedure, HPCAL 1.28, requires in part, that self-reading dosimeters

(SRDs) will be checked for response (calibration) at the following frequencies: prior to initial

use, when damage may have occurred and routinely in June and December for the emergency

plan SRDs Documentation of SRD checks will be logged onto the Self Reading Dosimeter

Response /Drin Check form.

Contrary to the above, as of August 29,1997, eleven emergency plan SRDs were not calibrated

in June 1997, and had not been calibrated since December 1996. In addition, as of August 29

.

1997, cl;ecks were not documented for 23 of the dosimeters calibrated in June 1997 "

Reaannfor.Y1olatiom

We concur that this is a violation of NRC requirements as characterized in the inspection rep

During our investigation of the cause of this violation the following information was verified.

Calibration of Emergency Plan 0-200 R self reading dosimeters (SRDs) is performed in

accordance with Health Physics Calibration Procedure HPCAL 1.28, "Self Reading Dosimeter

Response and Drift Check (Calibration) Procedure." Requirements for the calibration of these

SRDs are delineateil via form PDF-4013, " Monthly Health Physics Checklist," and form

EPMP 1 lb, " Emergency Plan Quarterly Checklist "

There are seventy two 0 200 R SRDs required and maintained fer the Emergency Plan. On

June 24 and June 30,1997, forty of forty-one Emergency Plan 0 200 R SRDs that were

calibrated, passed the calibration acceptance criteria contained in HPCAL 1.28 (one SRD was

recorded twice on the data sheet). Records documenting these calibrations are contained in pla

files.

'

_ _ _ _ _ _

_

_ _

_ _ -- _ _ . __._ . . _ __ .___ ._ _ __ _ _ ._.

' a

i

Attachment to NPL 97-0703

.

Pcge 2

Records documenting the calibration of the remaining SRDs calibrated in June an

that failed to pass the calibration criteria contained in HPCAL 1.28 could not be locate

Condition Report CR 97 2545 was initiated on August 21,1997, to document and ta

'

action for this situation when it was discovered and reported to Health Physics supe

the calibration records could not be located. Additional SRDs were ca

seventy two SRDs were available for use.

As stated in the inspection report, of the seventy two Emergency Plan SRDs in service,

had not been calibrated since December 1996. Th: remaining sixty one SRDs had cal

stickers that indicated they were last calibrated in June 1997. Of the sixty-one SRDs with

calibration stickers, calibration data was available for thirty eight of the SRDs resulti

twenty-tluce pieces of missing documentation. The cause of the missed calibration

documentation is due to a less than adequate infrastructure of checks and balances to

'

completion of the calibrations.

_

1

Corrective Acilona Taken:

,

On August 21,1997, CR 97 2545 was written to document Emergency Plan SRD calibrati

deficiencies. As a result, to ensure that seventy two SRDs were available for Emer

use, greater than ninety 0 200 R SRDs were verified to have calibrations which had been

<

completed siace June 1997.

Corrective Actioni to be Taken to Prevent Recurrenqu

1.

The procedure, HPCAL 1.28, was reviewed oad determined to be in need of revision to

provide the checks and balances to ensure proper and timely calibration of the

Plan SRDs. The mthly health physics checklist. form PDF-4013, was reviewed and

'will also be revised, Mds action will be completed by November 30,1997.

,

2.

Expectation's on the completion and documentat on of surveillances will be reinforced

i

with all members of the Health Physics gmup by November 7,1997. An administrative

procedure outlining these expectations will be implemented by March 31,1998.

3.

The need for prompt and timely initiation of Condition Reports has been reinforced w

all Health Physics personnel during group meetings and briefings.

'

Date Full Cornnilance Will be Achievedt

Full compliance with NRC requirements was ensured on October 31,1997, when reca

greater than ninety emergency plan 0 200 R dosimeters was completed.