MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206G6611999-05-0404 May 1999 Forwards SE Accepting GL 88-20,submitted by TVA Re multi-unit Probabilistic Risk Assessement (Mupra) for Plant, Units 1,2 & 3 DD-99-06, Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 9904281999-04-28028 April 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 990428 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205T1751999-04-0909 April 1999 Informs That on 990408 R Driscoll & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wk of 000807 for Approx Seven Candidates ML20205T3771999-04-0909 April 1999 Informs That on 990317,R Champion & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Are Wks of 000612 & 26 for Approx 16 Candidates ML20205J2521999-04-0505 April 1999 Informs That Effective 990328,A De Agazio Assigned as Project Manager for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20205F9231999-04-0101 April 1999 Forwards SE Authorizing Licensee 990108 Relief Request PV-38,from Requirements of ASME BPV Code Section XI IST, Valve Program for Plant,Units 1,2 & 3 ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20204J5451999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Sequoyah Plant Performance Review on Feb 1998-Jan 1999.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20205A1821999-03-19019 March 1999 Discusses Plant Performance Review of Browns Ferry NPP Completed on 990208.Determined Overall Performance to Be Acceptable.Security,Fire Protection,Radiation Protection & Plant Chemistry Continued to Be Effective ML20204J5721999-03-15015 March 1999 Forwards Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213.Violations Noted & Being Treated as non-cited Violations.Weakness Identified in Licensed Operator Training Program & Freeze Protection Program 1999-09-07
[Table view] |
Text
, 'I November 17, 1997 Mr. O. J. Zeringue Chief, Nuclear Officer and Executive Vice President Tennessee Val!ay Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402 2801
SUBJECT:
LETTER TO NUCLEAR ENERGY INSTITUTE (NEI) ON IMPROVED STANDARD TECHNICAL SPECIFICATIONS (STS) FORMAT
Dear Mr. Zeringue:
On October 29,1997, the NRP t a letter to NEl on H.B. Robinson's recent improved STS conversion license amendm We have enclosed a copy of the NEl letter for your information and consideration in your effoi to convert to the improved STS.
If you have any questions, please call one of us. (J. Williams at 301-415-1470, or R. Hernan at 301-415-2010.)
Sincerely,
/S/
/s/
Joseph F. Williams, Project Manager Ronald W. Hernan, Project Manager Project Directorate ll-3 Project Directorate ll 3 Division of Reactor Projects - 1/Il Division of Reactor Projects -l/Il Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation Docket Nos. 259, 50-260, 50-296 50 327 and 50 328
Enclosure:
As stated cc w/ encl: See next page t -
y y DISTRIBUTION w/ encl:
Docket File BFN R/F
[
SO N R/F PUBLIC D.L. Johnson (e-mail only, to DLJ) OGC ACRS J. JOHNSON, Region ll O DOCUMENT NAME: G:\NEI-MEM.TVA To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFC PDil-3/PM /m PDll 3/PM , , l PDil-3/LA PDil-3/D .i lC NAME JWilliams //j' RHernan W BClaytonh FHebdon M' DATE 11//H97 /' 11/j7/97 11hg/97 11/0/97 OFFICIAL RECORD COPY F J. A ,* ,
f,.Dk Nk h -
59
- h. . k. .
p
a i
a graaeog i* y* k
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 0001
% ,, November 17, 1997 Mr. O. J. Zeringue Chief, Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga. Tennessee 37402 2801
SUBJECT:
LETTER TO NUCLEAR ENERGY INSTITUTE (NEI) ON IMPROVED STANDARD TECHNICAL SPECIFICATIONS (STS) FORMAT
Dear Mr. Zeringue:
On October 29,1997, the NRC sent a letter to NEl on H.B. Robinson's recent improved STS conversion license amendment. We have enclosed a copy of the NEl letter for your information and consideration in your efforts to convert to the improved STS.
If you have any questions, please call one of us. (J. Williams at 301-4151470, or R. Hernan at 301-415-2010.)
Sincerely,
! Q '
&, y ,
,/ Joseph F. Williams, Project Manager Ronald W. Hernan, Project Manager Project Directorate ll 3 Project Directorate 11-3 Division of Reactor Projects - 1/II Division of Reactor Projects - 1/II
, Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation Docket Nos.60-259,50-260,50 296 50-327 and 50-328
Enclosure:
As stated cc w/ encl: See next page
'Mr. O. J. Zeringue BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT Senior Vice President General Counsel Nuclear Operations Tennessee Valley Authority Tennessee Valley Authority ET 10H i 6A Lookout Place 400 West Summit Hill Drive 1101 Market Street Knoxville, TN 37902 Chattanooga, TN 37402-2801 Mr. Raul R. Baron, General Manager Vice President Nuclear Assurance Mr. Jack A.&Bailey,ical Engineering Techn Services Tennessee Valley Authority Tennessee Valley Authority 4J Blue Ridge 6A Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. Mark J. Burzynski, Manager
.Mr. Timothy E. Abney, Manager Nuclear Licensing Licensing and Industry Affairs Tennessee Valley Authority Browns Ferry Nuclear Plant 4J Blue Ridge Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Decatur, AL 35609 Mr. Karl W. Singer, Plant Manager Regional Administrator Browns Ferry Nuclear Plant U.S. Nuclear Regulatory Commission Tennessee Valley Authority Region 11 P.O. Box 2000 61 Forsyth Street. SW. Suite 23T85 Decatur, AL 35609 Atlanta, GA 30303-3415 Mr. Masoud Bajestani Chairman Site Vice President Limestone County Commission Sequoyah Nuclear Plant 310 West Washington Street Tennessee Valley Authority Athens AL 35611 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Pedro Salas, Manager Licensing and Industry Affairs Mr. J. T. Herron, Plant Manager Sequoyah Nuclear Plant Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Soddy Daisy TN 37379 Soddy Daisy, TN 373/9 Mr. Michael H. Mobley, Director County Executive Division of Radiological Health Hamilton County Courthouse ,
3rd Floor, L and C Annex Chattanooga, TN 37402-2801 401 Church Street Nashville, TN 37243-1532 Mr. Leonard D. Wert Senior Resident Inspector Mr. Melvin C. Shannon Browns Ferry Nuclear Plent Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 10833 Shaw Road U.S. Nuclear Regulatory Commission Athens, AL 35611 2600 Igou Ferry Road Soddy Daisy, TN 37379 Mr. C. M. Crane, Site Vice President Browns Ferry Nuclear Plant State Health Officer Tennessee Valley Authority Alabama Departmen; of Public Health P.O. Box 2000 434 Monroe Street Decatur, AL 35609 Montgomery, AL 36130-1701
f
, a
, p-fa%g% UNITED STATES e g 1 NUCLEAR REGULATORY COMMISSION i L
. WAsHlWef oN, s.c. EgggHgM a...+ October 29, 1997 Mr. James Davis !'
Nuc6 ear Energy instNulo 1775 Eye Street, N.W.
Washington, D.C. 20006 3706
Dear Mr. Devis:
On October 24,1997, the staff issueo a license amendment for the H.B. Robinson 2 conversion to the improved Standard Technical specifications (STS). This is the 12th conversion to the improved STS, which will result in 16 units operating with these technical specifications. The Robinson conversion is unique in that H served as a pilot for the development by NRC of a new format for the safety evaluation (SE) which should result in staff resource savings and more timely reviews, while at the same time providing a clearer and more succhet product. In addition, the Robinson conversion amendment included a new license con $ tion to ensure that surveillance schedules are not perturbed by the conversion to the improved STS. This amendment also contains a Scensee condition to enforce licensee cornmitments to relocate hems removed from the technical specifications to the appropriate licensee controlled l documents. This latter license condition is similar to one that is now being used by the staff for l
other relocations.
I A key feature of the revised SE is a series of tabler containing summary descriptions and i categories of the changes to the technical specifications as a result of the conversion. It is our i expectation that licensees will provide these tables to the staff late in the review process as the staff starts to write the SE. No change in the format of the initial submittalls being requestei However, licensees should be aware of this expectation so that they can ensure that their data bases and word processing can easily generate these tables from existing submittel material at the appropriate point in time. We request that you make the availability of this amendment and tovised SE format widely known throughout the industry and include a reference to N in your planned update to NEl 96 06.
Sincerely, ys: o. /,L William D. BecAner, Chief Technical Specifications Branch Associate Director for Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l
l Enclosure l c T10F07t1 IP*
. - . . - - - , - .