ML20199G673

From kanterella
Jump to navigation Jump to search
Mod 13 to Contract NRC-04-96-037
ML20199G673
Person / Time
Issue date: 01/20/1999
From: Mace M
NRC OFFICE OF ADMINISTRATION (ADM), RISK ENGINEERING, INC.
To:
References
CON-FIN-W-6248, CON-NRC-04-96-037, CON-NRC-4-96-37 NUDOCS 9901220371
Download: ML20199G673 (2)


Text

.

,u

]

) Q)

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT "5

2. AMENDMENT / MODIFICATION NO.
3. EFFECTIVE DA'TE
4. REQUISITION / PURCHASE REQ. No.
5. PROJECT No.

Thirteen (13) g g g 31 1,. ' *

6. ISSUED BY CODE

-l

7. ADMINISTERED By CODE l l

(If other than item 6)

U.S. Nuclear Regulatory Consnission Division of Contracts and Property Management Mail Stop: T 7-1 2 Washington, DC 20555

8. NAME AND ADDRESS OF CONIRACTOR (No., street, county, State and ZIP code)
94. AMENDMENT OF SOLICITATION NO.

Risk Engineering, Inc.

4155 Darley Avenue, Suite A

98. DATED (SEE ITEM 11)

Boulder, CO 80303 1 A. M IHCAU N F C NTRACT/ R ER E Principal Investigator: Robin McGuire Telephone No.: (303) 499-3000 NRC-04-96-037 l

108. DATED (SEE ITEM 13)

CODE l FACIL!1Y CODE

11. THl$ ITfM ONLY APPLIES TO AMENDMENTS OF SOLICITAi!ONS O The above nunbered solicitation is amended as set forth in item 14 The hour and date specified for receipt of Offers O is extended. O is not extended. Offerors must acknowledge receipt of this 6mendment prior to the hour arJ date specified in the solicitation or as amended by one of the following methods: (a) By completing items 8 and 15, l

and returning copies of the amendment; (b By acknowledging receipt of this amerdnent on each copy of the of fer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. F AILUR$ OF YOUR ACKNOWLEDuMENT TO BE RECE!VED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFER HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change En offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. A m N ON0F" rs'OiW1'1T3T*

W6248 252A Obligated Amount: $24,500 l

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14 i

A. THis CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE lh THE CONTRACT ORDER NO. IN ITEM 10A.

j

8. THE ABOVE NUMBERED CONTRACT / ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying i

l X

office, appropriation data, etc.) SET FORTH IN ITEN 14, PURSUANT 10 THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INio PUR$UANT TO AUTHORiiY OF:

l i

D. OTHER (Specify type of modification and authority) i X

E. IMPORTANT: Contractor O is not, 9 is required to sign this document and return 2 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (organized by UCF section headings, including solicitation / Contract subject matter where feasible.)

(see page 2) h'

~

i 9901220371 990120

/

I PDR CONTR l

NRC-04-96-037 PDR i

& L l

Eacept as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

154. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND flTLE OF CONTRACi!NG OFFICER (Type or print) l Marygace, Congacting Officer 158.

A t

-15C. DATE SIGNED 168. U ATE OF 1F.

ATE IGNED f h0[9T 1

BY l

(Sign &ture of person authed red to' sign)

(Signafure W Contraafting Officer)

I

[ STANDARD FORM [30 (REv.10-83)

NSN 7540-01-152-8070 30-105 l

PREVIOUS EDlilON UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243 l

l

. Contract No. NRC-04-96-037 Modification No.13 Page 2 of 2 l

1 The purpose of this modification is to provide incremental funding in the amount of i

$24,500 to cover increases in fringe and overhead costs as allowable by DCAA for FY 1996-1997 (reference DCAA Audit Report Nos. 3121-98B10250016 for 1996 and 3121-98B10250056 for 1997). NOTE: In accordance with FAR 52.232-22, the indirect costs to be covered as projected by the contractor for FY 1998-99 will only be considered as allowable when pending DCAA audits for those fiscal years are approved. The contractor shall currently bill with indirect rates approved at this time by DCAA until the audits for FY 1998-99 are completed.

This action increases the obligated amount from $884,556 to $909,056. Accordingly, the following change is hereby made:

1.

Under Section B, Paragraph B.3," CONSIDERATION AND OBLIGATION--COST REIMBURSEMENT (JUNE 1988)- ALTERNATE I (JUNE 1988)"is hereby revised to read as follows:

"b.

The amount presently obligated by the Government with respect to this contract is $909,056.

It is estimated that the amount currently allotted will cover c.

performance through 9/30/99."

i All other terms and conditions under this contract remains unchanged.

A summary of obligations for this contract, from award date through the date of this action, is given below:

Total FY 96 Obligation Amount:

$275,000.00 Total FY 97 Obligation Amount:

$260,000.00 Total FY 98 Obligation Amount:

$250,000.00 Total FY 99 Obligation Amount:

$124,056.00 Cumulative Total of NRC Obligations:

$909,056.00 1

i This modification obligates FY 99 funds in the amount of $24,500.00.

l l