ML20199G504

From kanterella
Jump to navigation Jump to search
Forwards Rev 27 to Er Plan & Rev 23 to EPIP Erpip B.1, Equipment Checklist, for Calvert Cliffs Npp,Iaw 10CFR50, App E,V & 10CFR50.4(b)(5)
ML20199G504
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/19/1999
From: Forgette T
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199G509 List:
References
NUDOCS 9901220315
Download: ML20199G504 (1)


Text

CALVERT CLurs NocLEra Powrn PLANT Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Lusby. Maryland 20657 January 19,1998 U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Resoonse Plan Imnlementation Procedures l

As remdxd by 10 CFR Part 50, Appendix E, V, " Implementing Procedures," and 10 CFR 50.4(b)(5),

changes to the Emergency Response Plan and Implementing Procedures are enclosed.

Should you have questions regarding this matter, please contact me (410-495-4996) or Mr. Tim Grover (410-495-2064).

Very truly yours,

/?

/,

T. E. Forgette g00M Director-Emergency Planning TEF/FWG/ dim t

Enclosure:

Emergency Response Plan, Revision 27

{L[

s ERPIP B.1, Revision 23

/'

cc:

(Without Enclosure)

R. S. Fleishman, Esquire H.J.Milkr NRC J. E. Silberg, Esquire Resident inspetor,NRC A. W. Dromerick, NRC R. I. McLean, DNR Director, Project Directorate I-1, NRC J. H. Walter, PSC r

9901220315 990119

(

PDR ADOCK 05000317 F

PDR

______