ML20199G471

From kanterella
Jump to navigation Jump to search
Summary of 971105 Meeting W/Nmss & Us Enrichment Corp Re Status of Activities at Gaseous Diffusion Plants.W/Agenda, List of Attendees,Handouts,Insp Schedule
ML20199G471
Person / Time
Site: Portsmouth Gaseous Diffusion Plant, Paducah Gaseous Diffusion Plant
Issue date: 11/20/1997
From: Pravin Patel
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9711250188
Download: ML20199G471 (10)


Text

O 2 0 C7 M$MORANDUM TO: Robert P::rs:n, Chl:f Sp:ci:1 Pr:J: cts Branch Division of Fuel Cycle Safety and Safeguards FROM:

Priya Patel Enrichment Section Special Projects Branch Division of Fuel Cycle Safety and Safeguards

SUBJECT:

MEETING

SUMMARY

FOR STATUS MEETING WITH U.S.

ENRICHMENT CORPORATION On November 5,1997, the staff from the Office of Nuclear Material Safety and Safeguards, Office of the General Counsel, Region lil, and Site Facilities and Security met with the U.S. Enrichment Corporation (USEC), to discuss the status of activities at the gaseous diffusion plants (GDPs). USEC discussed the status of complian:e plan issues, explaining that the seismicity issue was behind schedule. NRC stated plans to complete review of the seismic amendment by the end of November 1997. USEC also provided information on the status of certificate amendment requests. NRC discussed the status of rulernaking to revise the amendment process in Part 76. They also provided USEC with a list of scheduled GDP inspections. NRC agreed to provide USEC with a copy of the Annual Report to Congress regarding the GDPs after it is approved by the Commission and sent to Congress.

USEC discussed the status of the SAR update, explaining that everything except for Chapter 3 was submitted on October 31,1997. They expressed interest in meeting with the staff to discuss the layout for Chapter 3. USEC stated they were still waiting for the Administration to resolve certain issues regarding privatization. USEC explained that they had discussed nuclear criticality safety activity at Portsmouth with staff via telephone and were going to continue to look into NCSAs end NCSEs at both Paducah and Portsmouth.

USEC indicated that the Portsmouth emergency exercise was effective, and that they had compiled a lessons learned from the exercise detailing areas in need of improvement.

USEC agreed to provide the lessons learned to NRC. The agenda, list of attendees, USEC handouts, and GDP inspection schedule are attached.

Attachments:

1. Agenda hfg -
2. List of Attendees
3. USEC Handouts
4. GDPs inspection Schedule cc:

Steven Toetle, USEC g

i DISTRIBUT!ON:

l Dockets 70-7001, 70-7002 NMCtf90s Centery; PUBLIC SPB r/f NMSS r/f FCSS rk YF))razg heb ['lbhW (MI

/

O'Brien, Rill Hartland, Rlli Hiland, Rlll m' m -

OFC SPB C

kB _ -(

SPB b

SPB SPB N

NAME PPatel:ij[}(

TDH diev, M tin DATE

// / p[/97

/ /b

// ////97

/ /97

/ /97 C = COVER E = COVER & ENCLOSURE N = NO COPY G:\\mtgsumup OFFICIAL RECORD COPY o e o r,,.

in; e

is e e

e is llj l lll lf,lnne isllll lllIRC IRf. CEN 97.J q 9711250198 971120 ADOCK07007#1 PDR o a.

e c

MEMORANDUM TO: R:bert Pi:rs:n, Chl:f l

Sp:cial ProJ: cts Branch Division of Fuel Cycle Safety and Safeguards F

M:

Priya Patel i

Enrichment Section Special Projects Branch Division of Fuel Cycle Safety and Safeguards

SUBJECT:

MEETING

SUMMARY

FOR STATUS MEETING WITH U.S.

NRICHMENT CORPORATION On November 5,1 7( the Nuclear Regulatory Commission.aff from the Office of Nuclear Material Safety and Safeguards, Office of the General Cr 31, Region Ill, and Site Facilities and Security meyith the U.S. Enrichment C

,wtion (USEC), t. discuss the status of activities at the gaseous diffusion plants (GDb USEC discussed the status of

~

compliance plan issues, explairWry that the seismicity isst, wa9 behind schedule. NRC stated plans to complete review o'f(he seismic amendmen oy the end of November 1997.

USEC also provided information on thgstatus of certificate amendment requests. NRC discussed the status of rulemaking to rev'se the amandment process in Part 76. They also provided USEC with a list of scheduled Ga ous Diffusion Plant inspections. NRC agreed to provide USEC with a copy of tht, Annual sport to Congress regarding GDPs after it is approved by the Commission and sent to Congr s.

USEC discussed the status of the SAR update, expla n ng that everything except for They(expressed interest in meeting with Chapter 3 was submitted on October 31,1997.

the staff to discuss the layout for Chapter 3. USEC stated they were still waiting for the s

administration to resolve regulatory issues regarding privatiz'at they had discussed criticality activity at Portsmouth with staff (on. USEC explaine v{a telephone and were going to continue to look into NCSAs and NCSEs at both Paducah and Portsmouth.

N USEC indicated that the Portsmouth emergency exewise was effectiva and that they had g

compiled a lessons learned from the exercise detailing areas in need of improvement.

USEC agreed to provide the lessons learned to NRC. The agenda, list of ahendees, USEC handouts, and GDP inspection schedule are attached.

Attachments:

1. Agenda
2. List of Attendees
3. USEC Handouts
4. GDPs Inspection Schedule cc:

Steven Toelle, USEC DISTRIBUTION:

Dockets 70 7001, 70 7002 NRC File Center PUBLIC SPB r/f NMSS r/f FCSS r/f YFaraz Rill O' Brier 9111 Hartland, Rill 44CE/d Hiland, R;ll OFC SPB C.,

SPB h/

SPB SPB SPB NAME PPatel:ij M dcbo,adley DMartin DATE

/

/97 ll l'l /97

/ /97

/ /97

/ /97 C = COVER E = COVER & ENCLOSURE N = NO COPY G:\\mtgsumup OFFICIAL RECORD COPY

3 NRC/USEC SENIOR MANAGEMENT MEETING l

November 5,199710:00 a.m.

l NRC Headquarters, Rockville, MD l

e Compliance Plan Status - see page 2 o

Cenificate Amendment Requests - see pages 3 through 6 e

NRC Activities Part 6 Rulemaking Status 7

Inspa etionic e

SAR Update Status e

Privatization Activities i

[

11/5/97-1 1

'l a

1 MEETING OF U.S. NUCLEAR REGULATORY COMMISSION AND UNITED STATES ENRICHMENT CO*PORATION November 5, 1997 TOPIC USEC Status Meeting NAME AFFILIATION PHONE (Y)e ai }lorn

/VR C 3 c/ WJ 1/26 fdt'riex N$qwcl VAC RE

& 5Wr.1 A-1& oJ

~

Etch. %1h DSCL 3ol SM. 30S1 Spnt'st$ facts v's FA -

Bo t-KH - 5 sot 3

/Vh//er yJEc got 569 2309 STEM

~~Il E L L E U MC-

% i - Gl -3250 2// Stach A / & / h /?II l N T 5

thi en;-7212

[a4T% LkdC Wi26/b,1<%/I 6Y b i-ih s a w ?

6 h2k fn FA h$RIGLk l;c; Aj pc So;-y/7-79m

((liL U M l F N/h X Ll5WA C 3n -4t>G 73SC Vc

&c.s 1 NAc)& MSS /SP/L 3st v iV - Wilb e.vt

$4dJ b2 Mu /w/Mfflf/7/

30/ Wf d7ff fn0<0 A1 NKc/Nm.s.s/.SPB DI-Wr-T 7S5 W

.C L a Am iNha l A P&

S o q,,4 ; g. e, a 3 4 nmva W<aso n a Alac /cac

?n wg-tsq, 3 h'edh fver/v Nfc sno,;H 3ci. qis -00yt GotC/}L6b

/VRC/PsN 20\\-4IF72s4

/

/

~,,. -,

- ~. - --

COhlPLIANCE PLAN ISSUES C0511NG DUE i

DURING TIIE NEXT QUARTER PADUCAH ISSUE NO.

DESCRIPTION OF ISSUE DUE DATE STATUS 10 Posting of Radioactive hinterials 11/30/97 On schedule 19 Management Controls 12/31/97 On schedule 21 Plant Changes and Configuration Management 12/31/97 On schedule 23 Operations Program 12/31/97 On schedule 29 Quality Assurance Program implementation 12/31/97 On schedule 35 Depleted Uranium hianagement Plan 12/31/97 On schedule 36 Seismir Capability of Buildings C 331 and C.

12/31/97 Behind schedule' 335 44 Operational / Safety System Trip Redundancy 12/31/97 On schedule 4

  • A certifict.te amendment request to modify the scope and schedule of this CP issue was issued by lett r GDP 97 0136 dated July 31,1997. NRC review of unreviewed safety questions submitted by letter GDP 97 0062 dated April 23,1997 is ongoing.

PORTSMOUTil ISSUE NO.

DESCRIPTION OFISSUE DUE DATE STATUS 17 Fire Protection Procedures and Hot Work 12/31/97 On schedule Permit Program 21 Management Controls 12/31/97 On schedule 23 Plant Changes and Configuration Management 12/31/97 On schedule 25 -

Operations Program 12/31/97 On schedule 32 Quality Assurance Program implementation 12/31/97 On schedule A.1 Materials Control and Accountability Manuals 12/31/97 On schedule and Procedures -

[ (

11/5/97 2

i l-

PGDP CERTIFICATE AMENDMENT REQUESTS AT NRC FOR REVIEW Listed in Order of Review Priority SUBJECT NRC' COMPIITE USEC NRC ISSUE USEC REVIEW RESPOND CERA NRC ISSUE IMPLEMENT COMMENT AND TO RAI FR NOTICE FINAL CAR CAR R - Required, F-Forecast. A - Actual ISSUE RAI PGDP - CASCADE CELL TRIP 5/22S7 A 6/13S7 A.

CEP.9/l&S7 A 10/16S7 A IOSIS7 A FUNCTION. RACs 97C014.96C212 7/18/97 A 6/23 S 7 A FR 9122S7 F (SUBMITTED 4/14S7)

Sn767F PGDP - AUTOCl GT MANUAL I/1SS7 A 2/14S7 A CER7/16/97 A 9/2S7 A i1/1/97 A ISOLATION SYST1?M.RAC 96Cl22 SAS7A 5/16 S 7 A FR7/24S7 A (SUBMITED 108166) 6/16 67 A i

PGDP - USQ FOR "00* SEISMIC 8/20S7 A 9/19S7 A i1/2SS7 F MODIFICATIONS,RAC 97C089 (SUllMITTED 4/23S7,78IS7)

PGDP-TSR 3.11.1, NCS PROGRAM NONE NONE CER 9/2S7 A 10/16/97 A I1/156 7 F ELEMENTS, RAC 97C0073 FR 9/15S7 A (SUBMITITID 6/16S7)

PGDP - PRODUCT & TAILS InSS8 F WITIIDRAWAL CAAS (SUBMITTED 9/1567)

PGDP - PRODUCT A TAILS 12/12S7 F WIT 1tDRAWAL AND CASCADE CAAS CROSS-REFERFECE (SUBMITTED 10Y/37)

II/5/97 3

. PGDP CERTIFICATE AMENDMENT REQUESTS AT NRC FOR REVIEW Listed in Order of Review Priorih>

(Continued)

SUBJECT NRC COMPLETE USEC NRC ISSUE

'USEC REVIEW RESPOND CER &

NRC ISSUE IMPLEMENT COMMENT AND TORAI FR NOTICE FINAL CAR CAR R-Reagelred, F-Forecast, A - Actual ISSUE RAI PGDP - CLOSURE OF C-360 12/12/97 F AUTOCLAVE ISOLATION VALVES FOLLOWING ZONE I OR 7DNE 4 UF6 DETECTION-CP ISSUE 3, ITEM S (SUBMITTED 8/29,97)

PGDP -RLMSE CP ISSUE 2 DATE FOR 8/12/97 A 8/l8/97 A NO SAkUP FORECAST (SUBMITTED 7/18/97)

PGDP - SARIIP CAR NO (SUBMITTED 8/l897,10/31/97)

FORECAST 11/5/97 4

PORTS CERTIFICATE AMENDMENT REQUESTS ATNRC FOR REVIEW Listed in Order of Review Priority

~

SUBJECT NRC COMPLETE USEC NRC ISSUE NRC ISSUE USEC REVIEW RESPOND CER&

FINAL CAR IMPLEMENT COMMENT.

AND TO RAI FR NOTICE CAR R - Required, A - Actual, F - Forecast ISSUE RAI PORTS - RASCIIIG RINGS TSR,ERP 6/23/97 A 7UM R CER 90197 A 10KW7 A 1I/5/97 F STATION,RAC 97X0147 7UM A FR 9/15/97 A (SUBMITTED 5/I(W7)

PORTS-TSR CIlANGE, SEAL MID-11197 F EXIIAUST PUMP,RAC %X0090 (SUBMITTED SYW7)

PORTS - SAR CIIANGE, OPERATION 7/8/97 A 8/7/97 A 16/3167l' AT 3% ASSAY IN X-333 (SUBMITTED 2/25S7)

PORTS - AUTOCLAVE INNER AND NONE NONE CER 10/23S7 A OUTER LOOP CTMT VALVES TESTING,CP ISSUE 3 RAC 97X0288 (SUBMITTI2)6/967)

PORTS - TSR 3.11.I NCS PROGRAM 10/17S7 F ELEMENTS, RAC 97X0096 (SUBMITTED 6/16/97)

PORTS - AUTOCIAVE LOCKING 10/31/97 F RING INTERLOCK - CP ISSUE 3 RAC 97X0134 (SUBMITTED 7/1/97)

(

11/5/97 5

4 PORTS CERTIFICATE AMENDMENT REQUESTS AT NRC FOR REVIEW Listed in Order of Review Priority (Continued)

F l

SU.

NRC COMPfJET :

USEC NRC ESUE NRCISSUE USEC REVIEW RESPOND CERA FINAL CAR IMPLEMENT COMMENT AND TO RAI FR NOTICE CAR yR - R:yurred. A - Actual. F - Forecast ISSUE RAI PORTS -TSR 2.I.3.11. AUTOCLAVE I1126"17 F SMOKE DETECTION SYS%"

R AC 97X0095 (SUBMITTED 7/3087)

? ORTS -REVISE CP ISSUE 2 DATE 8/12S7 A 8/lSS7 A NO FOR SARUP FORECAST (SUBMITTED 7/1SS7)

PORTS -SARUP CAR NO (SUBMITTED 8/I8S7.10/31S7)

FORECAST PORTS - REVISE CP ISSUE 24 NO i

CAllBRATION PROGRAM FOR MATE FORECAST (SUBMITTED 10/2167) l 11/5/97 6

{

+

GDP Scheduled Inspections CHEM CRIT FIRE ENVP EMRG MC&A RADP WSTM PORT 12/15 1/5 PAD 1/12 12/15 1/19 SEC OPRV MAIN MGTC TRNG TRAN PORT 11/3 11/3, 11/3, 11/3, I

1/6 1/5 1/5 PAD 1/19 1/19 1/19 4

Ati.achment 4