ML20199F735

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to PECO-COLR-P3C12, COLR for Pbaps,Unit 3 Reload 11,Cycle 12. Rev Incorporates cycle-specific power- Dependent Average Power Range Monitor,Rod Block Monitor,Ts Improvements Curves & Supplemental References
ML20199F735
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/17/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199F739 List:
References
NUDOCS 9711250004
Download: ML20199F735 (1)


Text

___

ct; tion Support Department e

{

TS 5.6.5.d

, PECO NUCLEAR nm-c-su crestsuxs oc swans A Unit of PECO Energy Wave F* 1tx*7 'd91 November 17,1997 Docket No. 50 278 License No. DPR-56 U.S. Nudear Regulatory Commission Attention DocumentControlDesk Washington DC 20555 Subject.

Peach Bottom Atomic Power Station, Unit 3 Issuance of the Core Operating Limits Report for Reload 11, Cycle 12, Revision 1

Dear NRC Offcials:

Enclosed is a copy c,f the Core Operating Umits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 3. Reload 11, Cycle 12 (Rev.1). This COLR is Revision i to the COLR submitted to the NRC on October 31,1997. Revision 1 of this report incorporates cycle specife power-dependent ARTS (Average Power Range Monitor, Rod Block Moniior, Technical Specircations Irnprovements) curves and a supplemental reference to Siemens Power Corporation (SPC) Lead Fuel Assembly (LFA) DESLIMd.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Technical Specircations (TS) Section 5.6.5.d.

If you have any questions, plea.;a do not hesitate to contact us.

Very truly yours, i

h' j\\

G. A. Hun 0er, Jr.

Director-Licensing Enclosure cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

R. S. Barkley, USNRC Senior Resident Inspector, PBAPS (w/Encitture) 9711250004 971117 i

.PDR ADOCK 05000278i

~

lll,l llll l

'P PDR