|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] |
Text
.
- ~ ' '8+3 Rezvy'o UNITED STATES E ^t NUCLEAR REGULATORY COMMISSION U I REGION ill 7; f 7ee ROOSEVELT ROAD je GLEN ELLYN,lLLINOIS 60137 March 29, 1985 MEMORANDUM FOR: R. Warnick, Chief, Projects Branch 1 C. Williams, Chief, Plant Systems Section FROM: L. McGregor, SRI, Braidwood R. Schulz, SRI, Braidwood
SUBJECT:
TELEPHONE CONFERENCE C. ALL WITH COMMONWEALTH EDIS0N IN REGARD TO L. K. COMSTOCK QUALITY CONTROL PROBLEMS.
During the course of the normal work day (Friday, March 29, 1985) the NRC Resident Inspectors were confronted twice by L. K.
Comstock Quality Control Inspectors, first by lsix inspectors and again later that same day (noon hour) by twenty-four inspectors, all with allegations of 1) intimidation, browbeating threats of cuts in overtime hours, harassment and to put bodily fear in front of the quality control inspectors, 2) quality control inspectors are training their lead inspectors and supervisory personnel who are managing the L. K. Comstock QC organization (management personnel are not qualified or certified within the disciplines which they are governing) and 3) the quality of inspector work has become secondary to managements insistence on quantity of and completion of inspections. This memorandum outlines Commonwealth Edison's corrective action program, as described to the NRC, to alleviate the immediate problems and inspire a conscientious quality assurance and quality control program at the L. K. Comstock Company.
Present in the residents office at the Braidwood site are L.
McGregor, R. Schulz, (NRC) and from Commonwealth Edison (CECO)
Gene Fitzpatrick and Lou Kline. At the Region III office are, R.
Warnick, R. Learch (sitting in for P. Pelke) R. Mendez, C. Wiel, and C. Williams.
8603270592 PDR FogA 060004 GUILD 85-777 PDR a/c
Warnick/ Williams 2 March 29, 1985 Mr. Fitzpatrick stated: Commonwealth Edison (CECO) actions will include both short term and-long term items. First of all I'll tell you of the short term actions that we have already completed or are in process of completing which will be finished before the end of the day. The first thing we did was (Ceco management Maiman, Fitzpatrick, T. Quaka'and D. Shamblin) to meet with Comstock site management to express our concerns over (1) concerns submitted to the Quality first program and (2) the concerns over the allegations made today.
Point 1 of Short Term: We told L. K. Comstock that CECO expected them to perform their work in accordance with, or consistent with the quality assurance and quality control requirements and in particular with their_own policy statement, which is section 1.0.0 out of their Quality Assurance manual. Comstock said they were aware of some of the problems and were investigating them under their program and especially concerns or issues of Mr.
Saklak.
Part 2 of Short Term: CECO has requested, and L. K. Comstock has agreed to administrative 1y remove Mr. Saklak from his duties pending. completion of their investigation relative to allegations concerning harassment by Mr. Saklak.' CECO will be. involved in the review of Comstock's investigation and depending what that review indicates we may have a clear course of action or we may have some additional digging.
Part 3 of Short Term: There is a memo being issued this afternooon setting up a meeting (requested by CECO) with all quality control personnel of L. K. Comstock (managers, supervisors, inspectors) to (1) reiterate the Quality Policy (2) to confirm CECO's concerns about the concerns given to the Quality First Program and (3) any other concerns that may be lurking out there that we are unaware of at this point and time.
We will give them (inspectors) an opportunity to express either openly or privately throughout the Quality First Program or through other vehicles that they may elect to choose other than the Quality First program. CECO will make a firm commitment to resolve those concerns and any other concerns that they have.
Part 4 of Short Term: We are issuing a joint quality assurance project letter reiterating our commitment to a strong quality program in support of L. K. Comstock corporate Quality Assurance, Quality Control policy.
J.
Warnic k/ Williams 3 March 28, 1985 These are the four actions we have going or have completed today and we have also an expectation that we will be prepared by the middle of next week, to meet with the residents on the status of a longer range plan. 'Any questions on what I have said?
Region III: When is the meeting to take place?
Ceco:The meeting with L. K. Comstock Quality Control Organization j will take place at 8:00 Monday morning.
Region III: As you think about this long range plan you might give consideration as to what CECO wasn't doing or what you can do to keep a better finger on the pulse of what is happening at Comstock and other subcontractors so that your guys get feed back, as to the problems as they are formulating rather than waiting till the problems get to the point they are so severe; the individual feels they have to go to the NRC to get some action and relief.
CECO: Yes, that is the ideal situation to be in - we have an awful lot of things going on - that for example we were aware in the past of moral problems in L. K. Comstock organization. A lot of that was attributed --- to perhaps the dollar situation and the certification process these guys had to go through.
Region III: Has L. K. Comstock corporate been readied at all with this?
CECO: No, L. K. Comstock corporate personnel are on site for this meeting today. We will make sure they are informed, but that has not been done as yet.
- 1 I
i l
I I
Warnick/ Williams 4 March 28, 1985 Region III.and the residents were satisfied with Ceco's comprehensive and extremely swift corrective actions taken this afternoon. An agreement was made to keep the NRC appraised of the meetings to take place early next week and CECO's long range plans to address quality assurance and quality control problems identified at L. K. Comstock Company.
l L. G. McGregor R. D.~Schulz i
i i
i
4 tLS, iuUCL E L4 C 0 Utef 349 Coe.wstssom tgaac*ese399
%ssi ALLEGATION DATA INPUT q m
f A. AECElviNG OF FICE
- t_
- .raciuTv i c.c..T .. a,, ,m.
ooc. 1=v .. = - < . ~ - - s
~
~.MINiN i D Tillllllllill!Illlllilll11111111 ~~/ 1111ll11 11ll1111111111111111111ll111lll111lllll lM N III f 1111$111lllIl1111lIIIllIililli11111 A .IIll11ll 11Illlll1IlilIIlllllllIllil11Ill11ll111
'j ._
- . Tves or secuLATEo acTiviTv sen.ce.a.noamme e..ai e ofwtm a heaCToe thvenoon asavaneatt e 547touanos t a.asATraiAL uce=sa
8,vuo rats
! l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l
- .. FUNCTION.L ARE Ats) (Caert e#f.penceN,) 's ea
{ q a opezate=s a Taaareroavarene M ee sue consTaucTc=
=oe=cv ras.anso=e ss e sassavanos e omsits meattie ano saegvv c8"**
e oTk h l g os8$#Tt ut aLTm ano $48tTV g9O 8r 9 t l t di fal t t it a f 1 vii tt e s t t f f se f i tfef t 9 i it a a . a l ~o onec==s<en orse o s. g. , A c,,,,,,m a., nao s m e "o 4,exvsv.tA<n*rcr m o ^ -rryy m auseEr r. a.> e m yr =
l Wement GC 5'WPAterr f*'. ."S. (~en e fru g QC.ro)*fAss2.fa n t .3'Arr.2*?92OAW &rrerar .3%fPa t=ricAf y9),, 2gpge',ws g-Effg n gg,;p 91 MA= -2A .EA,J9 der.Ema I' 'r -
1 DAY T W$ GA .'_"^4Prettims '~'4Itr astr* ."= =-)*hindsfAa,res AlendJ M :7' f.ne't.4ll> .ZAmtJ*\'erk L A dl2rr b y.21 Annt fer'Freraw.ee
- / Cirrto58 fan- ATSW2A 4! sums. .~ f. .Zs.1dfr>rErssr= JuAretw rrefr)"* 9. &goggy NAA,gpd _
s
- *a co g y,,aje'.
'F. soumCE ffnere snel
. ConteaCfoe tasptovag e somusm coastnaCTom etsPtovte s. assosevwovs ,'8 8 ,'*g *',' *", '",*" y , , , , , , , , ,
, ,g,
. o.er=ser emetoves _
. = r= =e o 4
'**'**'**I I I I I I I I I I I I I I I I l i I I I I I I I g'w
, . co. w as.ce=sseau.tovee . ,=,vatectrire= -
t ov=ea rs i , t .. o
- 9 oaTE jysaa .sonin oav 10 Eh4PLovEE RECElviMG ALLEGATeoN traer tw.m. tem, <aer ne.nes l* "e s o* nce as ce rv.
. c,L L(GATsoas es ce.vio iPi Sldi3lAt 9 C N (us.rt. IA'O .zi2t2
~ '
.(,,,,, B. ACTION OFFICE
, un c.,,o u . . 2. co= Tact ra w <-. ..<e. <- a - e *) co~Tacn irurno~t . saa e1v sic ~isic ~ct s .o..o o. .. .c a , ,o,,
, a a axx u .. . ... ,g,o .,o,,,, atcos m soto TJT.2I.2T- b-l a I-1041718 (vt MW
. sv.Tus lI SIPrPI-if lSI'1Io - o
. t aunc Tio...s su sr ~, .vio I . vis l I ' ao
- w. . , o ... ..a.
> 1510 41,2.i2'
...a.
a . .Lo o . . . , . . o,.. ca. ~
. . . , u......a,.
, , ,u,io ce-,
,, so , ,, ,, o f is%7ao* " o5'o l.a. l1 i li = 1. is l Fe
. ....ms . ~ , - . , - ,
- M L.M.[9cic AWcreAc enhs r* Nov~o-on ALMf~7" 7"AfeeranetOn>xc.e D.vo Arsac s,mrast,' -
j gew -a sr e-.arnea.a fraw msar As,4Nras .za,arprerm Arnouerw.mW AArwu roues, ra rrser.ma r-rv 4 rw wmnes no n a starava-o. 12a.' -rw M e _- str e nau- ewsw xwrwn.m l ,a.nee _m rem 1 A&e w=s na M s/Pr. t'*-,w.r---~n eu dhrr ~rar>m s- 3/trAttu s warso l Aema P t s .e (s. Aerr Mre cart .=< N^- mws- .t.2=rPat vs.r*4 Amer >Mrnarswa y themsaan * .2 nwr ma f 6ers.= a T_& m ar ->. ~9/s/PJ= 9. AWno '"t"b onPnM2t.24e s'Wav=4'er" ek.) AL/s 'sar fDF-Al".f.@_ep.
~ ~
! onr.o.r.n- m& ont-kr.'s- hal'r ' firr- kr. se-den. /
I to 0 aCTsoas le va% ge ho l s t. Os mE roaT'auu.E m g ,g g g g g g , , , g l
- a, ounaa n , = r ain.s . . . . .
_- - _ ~ _ .. ._ _ - _ _ - .-.
LJ2 A .
OSILY CEPORT DIII DATE 04/01/05 ,,-' }
' # REGIONAL ACTION FACILITY / LICENSEE NOTIFICATION ITEM OR EVENT ,
4 DR310W000 TELECON FROM SRI ON 03/29/95 AT 1999, SIX L.K. CONSTOCK IELECTRICAL RIII WILL CLOSELY 03/29/85 CONTRACTOR) INSPECTORS VISITED THE RESIDENT'S NCNITOR LICENSEE'S OFFICE TO PROVIDE ALLEGATIONS REGARDING THE CORRECTIVE ACTIONS OUALITY OF GC INSPECTIONS, QC SUPERVISOR SUALIFICATIONS. INTIMIDATION AND MARA55MF.NTe AND CLOSINe NONCONFORMANCES WITNOUT FIELO VERIFICATION. A SECOMO MEETING RETWEEN 2A
! CONSTOCK QC INSPECTOR $e REGION III AND THE
! RESIDENTS WAS HELD LATER IN THE DAY. THE I ALLEGERS IN0!CATED THAT THERE MAT BC A WALM-00T 04 84/01/05 IF SOMETHING wAS NOT DONE ABOUT
- THEIR CowCERNS. THE CONCERN 5 wERE SURSEQUENTLY ,
PROVIDE 0 TO COMMONWEALTH EDISON AND CECO Coww!TTED TO ACT UPON THE ISSUES WITH BOTN SHORT AND LONG RANGE PLANS. THE SHORT RANGE PLAN. WNICH WAS COMPLETE 0 04 03/29/85, INCLUDED A MEETING
< SETWEEN CECO ANO C0mSTDCKe5 MANAGEMENTe A OC -
SUPERVISOR REING REMOVED FR04 HIS POSITION ,
UNTIL THE ALLEGATIONS ARE RESOLVE 0, A wtETINS a
BEING SCHEDULE 0 BETWEEN CECO AND CONSTOCK OC/0A l PERSONNEL AND A CEC 0 GA PROJECT LETTER BEING IS5UEO TO RE-EMPHASIZE THE CECO PROJECT OA I POLICIES. CECO WILL PRESENT THEIR LONS RANGE PLANS To REGION III TMIS WEEK.
l CALLCCAY 'TELECON TO 00 ON 03/30/05 AT 0613 CST. THE LICENSEE DECLARED , FOLLOWUP PER WC 2519'
- 03/30/85 AN UNU5UAL EVENT WHEN A SAFETY INJECTION OCCURRED. TME PLANT WAS COOLING OOWN FOR A RI!! WILL ISSUE-A PN 4
MAINTENANCE OUTASE UTILIZING THE'ATwoSPHERIC 04/01/45. SRI RELIEF WALVE. THE LOW STEAM LINE PRESSURE SI REPORTED TO TME SITE.
4 SETPOINT WAS REACHED SECAUSE THE CIRCUITRY IS TO FOLLOW THE EVENT i RATE SENSITIVE. THE OPERATOR WAS FOLLOWING I PLANT PROCEDURES AT THE TIME OF TME EVENT.
THE CONTROLLIme PROCEDURE MAS BEEN REVISED i' TO ENSURE THAT THE PRIMARY SYSTEN PRESSURE IS LOW Ew006M TO 9 LOCK THE SI LOGIC PRIOR TO COOLING 00wN w!TH THE ATMOSPMERIC RELIEF i VALVE. TME UNUSUAL EVENT WAS TERNINATED
, AT 0639. APPR0x!MATELY 3000 6ALLONS WERE INJECTED AND THE PLANT 010 NOT SO SOLIO. THE LICENSEE HELO A NEWS CONFERENCE AND ISSUE 0 A .
PRESS RELEASE. .
i .
l 4
I l
.-e -. .-
i k.. _. e .
1 UAILY REPORT DIII I tk.
DATE8 04/04/85 hq;-
FACILITY / LICENSEE NOTIFICATION . ITEM OR EVENT REGIONAL ACTION ;
DIVISION OF RESCTOR PROJECTS t RIII WILL MONITOR I I SRAIOe000 TELECON FROM THE APPLICANT PROW 10E0 RIII WITN inEIR LONS RANGE APPLICANT PLAN 5 TO RESOLVE THE e3/29/e5 CONCERN 5 OF 24 LICENSEE 85 CORRECTIVE l ACTIONS '
l L. E. ComSTOCE GC INSPECTORS WHICH INCLuGEO CECO INVESTIGATION ASSIGNMENT 5e AN L. E. CONSTOCN CORPORATE INVESTIGATIONe AND PERMANENT REMOVAL l l 1 0F A GC SUPERVISOR FRON ALL SAFETY *RELATED ACTIVITIES.
l
! THE APPLICANT EAPECTS TO COMPLETE TMEIR INVESTIGATION
! SV 04/19/85.
i CYRON TELECON TO 00 ,
AT I415 CST ON 84/02/06. WITH REACTOR power AT 306 R!ts FOLLOWING t eA/02/85 AND WITH MAIN FEEDWATER SEING SGPPLIED SY THE IS LICENSEE 85 ACTIONS TuRSINE ORIVEN MAIN FEE 0 EATER PWNP (NFPle THE ANO WILL REVIEW !
MASTER FEE 0 EATER CONTROLLER WAS PLACEO IN AUTO PER MC 2515 !
j PER THE REGUIREMENTS OF AN UPCONINS STARTuP TEST.
- FEE 0e4TER FLod SEGAN TO OSCILLATE. OURING THE l-OSCILLATIONS THE MISM PRES $uRE eFP TURSIkE STOP I VALVE WENT 5Muf. THE MASTER CONTROLLER WAS RETURNED 70 MANUAL AND DEMAN0 I4 CREASED TO MARINUM.
! MFP fueeINE APM CONTINUED TO DECREASE A5 OIO FEE 0 MATER 4 FLOW AND STEAM SENERATOR LEVELS. OPERATORS STAeTED l THE IA MOTOR ORIVEN nFP TwICE A40 EACM TIME IT TRIPPE0 l l' IMMEDIATELY ON Los SUCTION PRE 55uRE. STEAN SENERATOR LEVELS DECREASED TO THE LOW Los SETPOINT CAUSING A REACTOR TRIP. ALL SYSTEMS RESPONDED NORMALLY AND 4
TME PLANT WAS STA#ILI2E0 IN MOT STANOSY. THE LICEN5EE
' OETERMINEO THAT THE IA MFP LOW SUCTION PRESCURE WAS CAUSED BY A PARTIALLY CLOSED SUTTERFLY WALVE IN TME CONDENSATE SYSTEN. LOCAL OSSERVATION PREVIOUSLY IN01CATED THE VALVE was FULL OPEN8 NOWEVERe.AFTER l DIFFERENTIAL PRESSURE ACROSS THE VALVE WAS DETERMINE 0
' TO SE EXCES5!vE, THE VALVE WA5 EaAMINEO. 'THE REY i
. WHICM CONNECTS THE OPERATOR TO THE WALVE STEN i J WAS MI551NS. A EEY WAS INSTALLE0 ANO THE VALVE
] OPENED 5AT!5FACTORILY. LICENSEE INVESTIGATIONS ,
~
i CONCERNING THE kFP CONTROL SYSTEM INSTASILITY AND THE IS nFP TURSINE STOP VALVE CLOSURE ARE ,
! TMus FAR INCONCLUSIVE AND ARE CONTINu!NS. FOLLOWING -
i NFP CONTROL SYSTEM RECALIBRATIO4e TME LICENSEE RESUMED STARTuP TESTINS. -
I 1
l 1
i l
1