ff UNITED STATES y
g NUCLEAR REGULATORY COMMISSION 3
Lj WASHINGTON, D. C. 20555
\\,.....*/
June 20, 1986 -
Docket No. 9990001047/86-01 Pacific Nuclear Systems Incorporated Nuclear Packaging Incorporated ATTN: Mr. David F. Jones Chairman / President 1010 South 336th Street Federal Way, Washington 98003 Gentlemen:
This refers to the inspection conducted by Messrs. R. Cilimberg, P. Prescott, K. Aspinwall, and Ms. C. Abbate of this office on May 5-8, 1986, at your facility in Federal Way, Washington and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
This inspection was the third in a series of trial inspections which focus on the fabrication, maintenance, and repair of transportation casks, but the first NRC inspection of Nuclear Packaging, Inc. The purpose < / this inspection was i
to review the implementation of the Nuclear Packaging (NUPAC) Quality Assurance (QA) program for the fabrication of transportation casks. Additionally, a limi-ted review of QA records for the two Model 125-B casks being used for the TMI-2 defueling was conducted. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection con-sisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
During the inspection it was found that the implementation of your program concerning 10 CFR Part 21 and 10 CFR Part 71 failed to meet certain NRC require-ments.
Further, weaknesses in the implementation of your QA program were iden-tified in the areas of personnel qualification, procurement, and nonconforming material. Additionally, unresolved items concerning nondestructive tests required to be performed on the Model 125-B casks were identified.
A meeting was held in Bethesda, Maryland between members of NUPAC, the NRC, Department of Energy and EG&G on June 12, 1986. The meeting cnnsisted of a presentation by NUPAC describing their nondestructive testing program and i
discussions concerning the qualification requirements of nondestructive testing personnel. A subsequent inspection of NUPAC is scheduled for June 21-26, 1986, to review these areas.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
l 8606240254 060620 PDR GA999 EMVNPI 99901047 PDR
}
l
Nuclear Packaging, Inc. June 20, 1986 The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing:
(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
The responses requested by this letter are not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
@ Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Notice of Violation 2.
Appendix B-Inspection Report 99901047/86-01 3.
Appendix C-Inspection Data Sheets (7 pages) cc w/ enclosures:
GPU Nuclear Corporation Ideal Machine & Mfg.
ATTN: Mr. F. Standerfer ATTN: Mr. Lee H. Long, Jr.
Vice President / Director TMI-2 3611 S. Warner Post Office Box 480 Tacoma, WA 98409 Middletown, Pennsylvania 17057 U.S. Department of Energy-TMI Site Office X-Ray, Incorporated ATTN: Mr. W. W. Bixby ATTN: Mr. William Richmond Manager 7500 Perimeter Rd. South Post Office Box 88 Seattle, WA 98108 Middletown, Pennsylvania 17057
-)
1 June 20, 1986' DISTRIBUTION:
VPB"'R adihg DQAVT Reading RVollmer, IE HThompson, NRR CMacDonald, NMSS R0degaarden, NMSS CWilliams, NMSS RStarostecki, RI BGrimes, IE HMIller, IE RHeisnman, IE JStone, IE JCraig, IE PPrescott, IE CAbbate, IE RCilimberg, IE LParker, IE WTravers, NRR JWhite, NRR MMasnik, NRR RI'al1, NRR KAspinwall, BNL (s
VPB:DQTVT
- DQAVT VPB:0QAVT LR:DQAVT
- DQAV
' Miller Brfrimes
[RCilimberg fo/ 8 86
((GGZech JCraig
/g0/86
/2e/86 g/?,o/86 v//4/86 h
,l\\
Y June 20,1986 DISTRIBUTION:
N VPB Reading 00AVT Reading RVollmer, IE HThompson, NRR CMacDonald, NMSS R0degaarden, NMSS CWilliams, NMSS RStarostecki, RI BGrimes, IE HMIller, IE RHeishman, IE JStone, IE JCraig, IE PPrescott, IE CAbbate, IE RCilimberg, IE LParker, IE WTravers, NRR JWhite, NRR MMasnik, NRR RHall, NRR KAspinwall, BNL 1
VPB:00AVT QAVT VPB:DQAVT R:DQAVT IR:DQAV fRCilimberg JCraig GGZech i/iMiller B imes b /g0/86 fc/SCf86
( /2d86 f./?v/86
/ /86