Informs of Planned Insp Effort Resulting from 971008 South Texas Project Semiannual Plant Performance Review.Details of Inspection Plan for Next 8 Months Encl
ML20199E557
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 9711210242
Download: ML20199E557 (6)


Text

-., ~.

. ~ - ~ _. -

t "N

. gt UNITED STATES.-

_fJ-

-I NUCLEAR REGULATORY COMMISSION if- !

i REoloN iv o--

g

8. '

611 RYAN PLAZA drive sulTE 400 -

%, * *V

/

- AHLINoToN, texas 760118064 i HO'k 1 - O G97 William T. Cottle, Group Vice President, Nuclear :

- Houston Lighting & Power Company

- P.O. Box 289 Wadsworth, Texas 77483-m

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) - SOUTH TEXAS PROJECT Dear Mr. Cottlet On October 8,1997, the NRC staff completed the SPPR of South Texas Project.- The staff --

. conducts these reviews for all operating nuclear _ power plants to develop an integrated understanding of safety performance. The results are used by NRC management to f acilitate planning and allocation of inspection resources..The SPPR for South Texas Project involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March through September 1997.

SPPRs provide NRC management with a current summary of licensee performance and

. serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews This letter advises you of our planned inspection effort resulting from the South Texas Project SPPR review. it is provided to minimize the resource impact on your staff and to.

allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

The rationble or basis for each inspection _outside the core inspection program is provided so that you are awsrt, of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

.We willinform you of any cht.nges to the inspection plan, if you have any questions, please contact J. l. Tapia at (817) 860 8243.

Sincerel,

omas P. Gwyn, Dire or Division of React Pr et

' Docket Nos.: 50-498 50-499

\\

License Nos.: NPF 76 NPF-80 9711210242 971114

~

PDR ADOCK 05006498 y-G PDR

~

l l

g,

c

\\

-Houston Lighting-& Power Company'

- 2. --

j1 M

Enclosure:

- Inspection Plan :

cc w/ enclosure:

Lawrence E. Martin, General Manager.

- Nuclear Assurance & Licensing'

. Houston Lighting & Power Company.

" P.O. Box 289 Wadsworth, Texas. 77483

- Mr. J. C. Lanier/Mr.- M.~ B. Lee City of Austin.

Electric Utility Department:

721 Barton Springs Road Austin,-Texas 78704 -

Mr. K. J. Fiedler/Mr. M.= T. Hardt City Public Service Board

- P.O. Box.1771 San Antonio, Texas -78296 Jack R. Newman, Esq.

Morgan, Lewis & Bocklus

- 1800 M. Street, N.W -

Washington, D.C. 20036-5869' Mr..G. E. Vaughn/Mr. C. A. Johnson Central Power & Light Company.

~ P.O.. Box 289 Mail Code: ' N5012-Wadsworth, Texas 77483 INPO Records Center 700 Galleria Parkway -

Atlanta, Georgia L 30339-5957 Dr. Bertram Wolfe 15453 Via Vaquero -

i

. Monte Sereno, California 95030-Bureau of Radiation Control.

j (State of Texas :

1100 West 49th Street Austin, Texas ' 78756 m

v..

-- i

^

m g,,

rg

.; u

.s; Houston Lighting & Power Company.

-- e Mr. Glenn W. Dishong

'iexas Public Utility Commission --

7800 Shoal Creek Blvd.

1 Suite 400N

' Austin, Texas 78757-10241 John Howaid/ Director Environmental and Natural Resources Policy-;

Office of the Governor -

- P.O. Box 12428 =

Austin, Texas 78711 judge Matagorda County

.Matagorda County Courthouse 1700 Seventh Street

- Bay City,- Texas 77414 -

j

,b Licensing Representative Houston Lighting & Power Company-3

- Sur.e 610

- Th.ee Metro Center

[

Bethesda, Maryland 20814

^'

Rufus S. Scott, Associate General Counsel Houston Lighting & Power Company P.O. Box 61867.

- Houston, Texas 77208 4.

- Joseph R. Egan, Esq.

Egan & Associates P.C.

2300 N Street, N.W.

Washington, D.C. 20037

)

s m

I

.-~.

~..... - -..

.~.

f_c w

a

-l

/

4

  • s Ng j

j o

3D 4199E l

-r lHowton Lighting & Power Companyo -

3

p p

g n bec to DCD (IE01)--

- bec distrib. by RIV:

E

Regional Administrator-

. Resident inspector (

. DRP Director:

DRS-PSB

- Brt.nch Chief (DRP/A):.

MIS System

. Project Engineer (DRP/A)

RIV File -

Branch Chief (DRP/TSS)

R. Eachmcnn,' OGC (MS: 15-B 18)

{

~f

.g t.

i

(

i 4

L k

3 s

4 i

t m

.o -

- DOCUMENT. NAME: ' R:\\_STP\\STSP9704.LTR (

r To receive copy of ontweent, Indicato in twa: "C" = Copy without enc %ures "E" = Copy with enclosures "N" = No copy.

RIV:PE:DNP/A g-C;DRP/A:

g D:DRS ff D:DRP g.

RAKopriva;dif 'F JITapia e QQL,,.. ATHowellf/f TPGwynn f f 10/30/97-10/t%/97 (f-1$/:l$/97 [d 17//7/97 OFFIC IAL RECORD. COPY -

W

]%i

?

[ I'-

lI. :'

s lllI T

1--:

w m

+

, y e

=

w m.,

o J

140V t 4 DTI e

Houston Lighting & Power Company 4-bcc to'DCD (IE01)

~

bec distrib. by RIV:

Reg!onal Administrator Resident inspector -

DRP Director DRS-PSB Branch Chief (DRP/A)

MIS System Project Engineer (DRP/A)

RIV File R. Bar mann, OGC (MS: 15 B 18) s Branch Chief (DRP/TSS) s DOCUMENT NAME: R:\\_STP\\STSP9704.LTR To receive copy of docume it. Indicate in box: "C" = Copy wthout enclosures "E" = Copy v1th enclosures "N" = No copy RIV:PE:DRP/A C:DRP/A D:DRS D:DRP p,

r RAKopriva:dif 'g>U JITapia ATHowell TPGwynn (( f 10/go.t97

,10/%9/ ()~

1p/, ;/97 /:.

17/// /97 GFFIC.AL R$ CORD COPY

)

O

+

  • g ENCLOSURE SOUTH TEXAS PROJECT INSPECTION PLAN i

i IP -Inspection Procedure TI - Temporary Instruction Core inspection - Minimum NRC inspection Prog-am (mandatory all plants) v:

' INSPECTION TITLE /

NUMBE3 OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 50001 Steam Generator Replacement 1

12/01-04/97 Regional Initiative IP 62706 Maintenance Rule Audit 7

03/23-27/98 Mandatory Team inspection t

.