ML20199E528

From kanterella
Jump to navigation Jump to search
Forwards Complete Replacement of All Typed Pages to TS Changes Requested in Ltr LCV-0849-E,as Graphical Error Was Found in TS Figure 4.3.1-2.Rev 3 to WCAP-14720,incorporating Change,Also Enclosed
ML20199E528
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/27/1998
From: Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199E533 List:
References
LCV-0849-L, LCV-849-L, NUDOCS 9802020180
Download: ML20199E528 (2)


Text

'* J. D. Wooderd Southern Nuclear f acwtive We heode<it Operating Company. lac.

40 Inerms Centot Fa4my

'r.c:0'1toBox1?%

Oumingun Alabama ';5701 let 705 937 5086 SOUTHERN COMPANY January 27, 1998 r,,,,y ,, s,,,, rou r nild -

LCV-0849.L Docket Nos. 50-42.:

50-425 U S. Nuclear Regulatory Commission ATFN: Docum nt Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECilNICAL SPECIFICATIONS CREDIT FOR IlORON AND ENRICllMENT INCREASE FOR FUEL STORAGE CQRRiiCTION TO TYPED _J%QES Southern Nuclear letter LCV 0849 E requested changes to Vogtle Electric Generating Plant (VEGP) Units 1 and 2 Technical Specifications. Enclosure 3 ofletter LCV-0849 E included marked up Technical Specification pages. By way ofletter LCV-0849-J, Southern Nuclear provided a tyi,ed copy of the Technical Specificatien changes to accompany letter LCV-0849 E.

Subsequent to submitting letter LCV-0849-J, a graphical error was found in Technical Specification Figure 4.3.1-2 (Page 4.0-5). This figure originated from Figure 9 of Westinghouse WCAP-14720, Rev. 2, which was included as Enclosure 5 ofletter LCV-0849-E. Westinghouse has corrected the figure and reissued the WCAP as Revision 3. No changes were made to the analyses or results as can be seen by comparing the results in Table 7 on Page 57 of Rev. 2 and Rev. 3 of WCAP-14720.

Enclosure i of this letter contains a comple'e replacement of all the typed pages submitted in letter LCV-0849 J. The only change was the revised Figure 4.3.1-2. Because Westinghouse revised WCAP-14720 to incorporate this change, Enclosure 2 of this letter contains a copy of Rev. 3 of WCAP-14720.

The error in Figure 4.3.1-2 was graphical in nature. No changes to the analyses were required The change does not alter the Technical Specification changes requested in

\

00\ '

s

. . . - . 1. I.lill.lill.l .[lil.I. I.II 4

9002020100 900127 PDR ADOCK 05000424 P PDR

~ _ . _ . _ _ _ _ _ _ _ _

13. S. Nuclear Regulatory Commission Page 2 LCWO849.E, and it does not change the conclusions of the evaluations submitted in support of these requested changes.

-- N , 1 J. D. 'oodard JDW/RJF/gmb

Enclosures:

1. Typed Technical Specification Pages
2. Westinghouse WCAP-14720, Rev. 3 xc: Soythern Nuclent Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. H. Jaffe, Senior Project Manager, NRR Mr L Zeiler, Senior Resident inspector, Vogtle LC%0849 L

-