ML20199E313

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to PECO-COLR-L2R4, COLR for Lgs,Unit 2, Reload 4,Cycle 5, Per TS Section 6.9.1.12.Rev Changes Max Permissible Recirculation Pump Motor Generator Set Scoop Tube Stop Setpoints
ML20199E313
Person / Time
Site: Limerick Constellation icon.png
Issue date: 01/11/1999
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199E319 List:
References
NUDOCS 9901200380
Download: ML20199E313 (1)


Text

I a ~ **

Ctition Support Department

~

A

=apr-TS 6.9.1.12 PECO NUCLEAR ncm c-965 Chesterbrook Boulevard A Unit of PECO Energy wavne. PA 19W7R91 January 11,1999 Docket No. 50-353 License No. NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Unit 2 lssuance of Revision 2 of the Core Operating Limits Report for Reload 4, Cycle 5

Dear Sir / Madam:

Enclosed is a copy of the Core Operating Limits Report (COLR), Revision 2 for Limerick Generating Station (LGS), Unit 2 Reload 4 Cycle 5. This revision changes the maximum permissible Recirculation Pump Motor Generator (MG) Set Scoop Tube Stop Setpoints.

This COLR Revision was implemented on January 4,1999 and is being submitted to the NRC in accordance with LGS, Unit 2 Technical Specification (TS) Section 6.9.1.12.

If you have any questions, please do not hesitate to contact us.

Ve Iy yours, l

h

/ Garrett D. Edwards Director-Licensing cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

A. L. Burritt, USNRC Senior Resident inspector, LGS (w/ Enclosure)

R. R. Janati, PA Bureau of Radiological Protection (w/ Enclosure) 1 9901200380 990111

~

j\\ cot 1

i PDR ADOCK 05000353 P

PDR