D
[ *' %
,\\
NUCLEAR REGULATORY COMMISSION j' ;,(,
't b
i R E oloN iv
/
Gli RYAN PLAZA oRIVE $UllE 400 I
AR LINO ton. T E XA5 760118064 L!DV l 41997 Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066
SUBJECT:
SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) WATT
Dear Mr. Dugger:
On October 8,1997, the NRC staff completed the Semiannual Plant Performai '
Review (SPPR) for Waterford 3. The staff conducts these reviews for all opera-n
~.r power plants to develop an integrated understanding of safety performance. The re are used by NRC management to facilitate planning and alloration of inspection rescarces.
The SPPR for Waterford 3 involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 through September 1997. SPPRs provide NRC management with a current summary of licenseo performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior b/ oagement Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Waterford 3 SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival on site. The enclosure details our inspection plan through the end of the current SALP cycle. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are ns - !isted due to their ongoing and continuous nature.
f We willinform you of any changes to the inspection plan. If you have any questions, please contact Phil Harrell at (817) 860-8250.
(
l Sincer yocw Thomas P. Gwynn, irect r Division of Reactor o'
ts Docket No. 50 382 License No.' NPF 38 "limil1 HQllIll %IE 9711210109 971114 lilim l}dlilllilI!! mlilli mill:
PDR ADOCK 05000382 lllidl I
G PDR
9
.c,.
U w
_ Entergy Operations, Inc.
- f2-4
Enclosure:
Inspection Plani y
- cc w/ enclosure:-
Executive Vice President andi Chief Operating Officer-Entergy Operations, Inc.
'P.O. Box 31995
- Jackson, Mississippi 39286 1995 nVice President,' Operations Support
- Entergy. Operations, Inc.-
P.O. Box 31995_.
~ Jackson, Mississippi : 39286_1995 Wise, Carter, Child & Caraway
'P,0.. Box 651
-Jackson,- Mississippi-39205 General Manager, Plant Operations -
Waterford 3 SES Entergy Operations,-Inc.
P.O. Box B Killona, Louisiana' 70066 Manager - Licensing Manager -
Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066
- Chairman Louisiana Public Service Commission
-One American Place, Suite 1630
- Baton Rouge, Louisiana 70825 1697-
- Director, Nuclear Safety &
- Regulatory 'Af f airs-
-Waterford 3 SES
~ Entergy Operations,- Inc.
' P.O. Box' B f Killona, Louisiana; 70066 0
y.
9 y --
&l 4 -9 ;
k:
y Entergy Operations, Inc. _
William H. S'pell, Administrator -
Louisiana Rsdiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethosda, Maryland 20814 -
Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
p~
f
- ?b p a, i e t ~,
.L Entergy Operations, Inc. '
f:
bec to DCD (IE01) bec distrib. by RIV:-
Rogional Administrator Resident inspector DRP Director DRS PSB Branch Chief (DRP/D)
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS) h 4
' DOCUMENT NAME: R:\\ WAT\\WTSP9704.LTR
~
To receive copy of document, lrdcate in box: "C" = Copy without enclosures
- E* = Copy with enclosures *N* = No copy.
RIV:PE:DRP/D C:DRP/D D:DRS
//
0:DRP f/
g PHHarrel. j}, ATHowelf27 TPGwynn fV GAPick;df I
~
19/ g /9i l j' 1$/d/97 p/
19//7/97 '
P 14/ l$/97
- Mt i
v OFFICIAL RECORD CO*Y
fn
.n 7,-
.p
^
-~
1 l Entergy Operations, Inc. --
.4 -
- !!ny 1.1 En 1
i
(
~
F bec to DCD (IE0111 bec distrib.-by RIV:-
+-
' Regional Administrator '
. Resident inspector.-
DRP Director '
DRS PSB -
. Branch Chief (DRP/D)
--MIS System
- Project Engineer (DRP/D)-
' RIV Fife.
Branch Chief (DRP/TSS) t i
- .y
- DOCUMENT _ NAME: R:\\_WAT\\WTSP9704.LTR
- To neceive copy of document, indicate in box: "c" = copy without enclosures
- E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D -
C:DRPtD D:DRS
(_-
D:DRP -
f/
GAPick:df p-PHHarral,_(,
ATHowell~
TPGwynn Q 19/ n/97.
- VI 19/g/9Tl(?
19/
/97 si 1p//7/97 '
V-OFFICIAL RECORD COPY i
)
l
Enclosure WATERFORD 3 INSPECTION PLAN IP - inspection Procedure Ti - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandato.y all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 93809 Safety System Engineering 5
12/01-05/97 Core Inspection 12/15-19/97 IP 37001 10 CFR 50.59 Safety Evaluation IP. 86750 Radioactive Waste Treatment and 1
01/12-16/98 Core Effluent and Environmental Monitoring IP 40500 Effectiveness of Licensee Controls 3
02/02-02/98 Core in Identifying, Resolving and 02/16-20/98 Preventing Problems IR 81700 Physical Security Program 1
02/02-06/98 Core IP 83750 Occupational Radiation Exposure 1
02/02-06/98 Core IP 82701 EP Operations Status 2
02/16-20/98 Core