Forwards Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 Issued on 970629-0809.Several Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary Were Identified
ML20199E129
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/14/1997
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20199E133 List:
References
50-498-97-05, 50-498-97-5, 50-499-97-05, 50-499-97-5, NUDOCS 9711210105
Download: ML20199E129 (5)


See also: IR 05000498/1997005

Text

fi

'

e;

h8 "'G% .

UNITEo STATES

[. _ = [k- _

NUCLEAR REGULATORY COMMISSION

',.: ggotoNgy;

-

-

.$s#6 #- 611 RYAN PL AZA DRIVE; SulTE 400

y

' h . . .#..

[ - ARLINGTON TEXAS 760118064

.

'I40W IT 1997

William T. Cottle, Group Vice

President, Nuclear-

-

Houston. Lighting & Power Company.

P.O. Box 289

Wadsworth, Texas 77483

SUBJECT: NRC INSPECTION REPORT 50 498/97-05;50-499/97-05

Dear Mr. Cottle:

NRC inspection Report 50-498/97 05:50 499/97 05 was initially issued

- September 9,1997, with several errors in the numbering of the inspection followup system

~

open items and in some items identified in the Executive Summary. Due to potential

confusion in future correspondence,_ on September 12 we issued a letter and corrected

pages to replace t$ose incorrect pages in the report. We recently identified a section in the

issued report that had been duplicated and incorrectly placed in the report. To minimize

-the confusion in correcting all of the identified errors, we are reissuing Inspection Report

50-498/97 05;50-499/97 05 as Revision 1- Please replace Inspection Report

.

o. 50 498/97-05;50-499/97 05 and all correction pages with Revision 1. We regret any

inconvenience this may have caused.

Sincerely,

.

.

~

Joseph I.=Tapia, Chief

Project Branch A

Division of Reactor Projects

' Docket Nos.: 50-498

.50-499

.. License Nos.: NPF-76

NPF 80

--/

-cc:

Lavurence E. Martin, General Manager

Nuclear Assurance & Licensing

-Houston Lighting & Power Company

P.O. Box 289

f'

Wadsworth, Texas 77483

9711210105 971114

,

PDR-

G

ADOCK 05000498

PDR

h :m.

_

. .

, . . . , -- . . - - _ .. .-.. ~ - -. . . ~

'

.

,

- .

g -

^

j

JHouston Lighting & Power CompanyL 1-2-

- Mr. J. C! Lanier/Mr. M. B. Lee--

' City of Austin

Electric Utility. Department - ,

721 Barton 9prings Road - ,

-

Austin, Texas: 78704

Mr,' K. J. Fiedler/Mr. M. T. Hardt '

. City Public Service Board

P.O. Box 1771

San Antonio, Texas 78296

Jack R. Newman,' Esq.

.

'

. Morgan, Lewis & Bockius

.

~-1800 M." Street, N.W.  ;

'

Washington, D.C. 20036-5869

'

' Mr.'G. E. Vaughn/Mr. C. A. Johnson

Central Power & Light Company

P.O. Box 289
Mail Code:' N5012

Wadsworth, Texas' 77483-

lNPO '

Records Center

700 Galleria Parkway

' Atlanta, Georgia- 3J339 5957

'

Dr; Bertram Wolfe

15453 Via Vaquero-

'

- Monte Sereno, California' 95030-

2~

Bureau of Radiation Control

State of Texas.:

1100 West 49th Streat

- Austin, Texas :78756

Mr. Gienn' W. Dishong

' ~

' Texas Public Utility Commission

~7800 Shoal Creek Blvd.

Suite 400N.

Austin, Texas . 78757-1024

'

.

4  !: [ .

fi M .+

s

%

.iY-.

we M ' -4- e- + u- y- n v ,,~r-- t,--w-+t-- -

e ^W"'

. -- . . _._ ._. - 1~.-. _ . . _. _ _ . . - _ . _ _ _ . .

.

SA- 2

l'

I - 3-

Houston Lighting & Power Company

!

'

4

-

,

John Howard,-Director'

-

,

- Environmental ano Natural Resources Policy +;-

. Office of the Governor  :

P.Oi Box 12428.'

Austini: Texas 78711 _

-3

Judge, Matagorda County-  ;

>

Matagorda County Courthouse'.

1700 Seventh Street.- *

Bay City, Texas 774141

. .

1

Licensing _ Representative

Houston Lighting & Power Company-  :

-

. Suite 610'-

Three Metro Center  :

Bethesda, Maryland 20814

-

.

-?

Rufus S. Scott, Associate

General Counsel - ,

Houston Lighting & Power Company'.

' P,0. Box 61867; -:

Houston, Texas- 77208

, L Joseph R. Egan, Esq.

t

Egan & Associates, P.C.

- 2300 N Street, N.W.

-- Washington, D.C. 20037

.. .

$

f_.'

'

!.-

>

<

.

g . .- y -y ,. s, , ,w ,,- - -

,

-_ . . __ ~. -

..-

p

'

.,

'

' Houston Lighting' & Power Company --- 4.- NOV_ , 4 199f.

l

-

i

bec to DCD (IE01)'

bec distrib. b'y RIV:  ;

Regional Administrator : - Resident inspector 1

DRP Director DRS-PSB

. Branch Chief (DRP/A) MIS System

Project Engineer _ (DRP/A) ~ RIV File -

R. Bachmann, OGC (MS: 15 B 18)

'

Branch Chief (DRP/TSS)

>

P

+

- DOCUMENT NAME: R:\_STP\ST705RP.DPL

To voceive copy of document. IrMHcate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy

RIV:PE:DRP/A C:DRP/A . j

RAKopriva:dif * JITapia W

11/13/97 11/lV/97 )!

'Previously Ccncurred- VFFIClAL RECORD COPY

. . - .- _

. . -

7#

\

Houston Lighting & Power Company -4- NOV I 4i997

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

Branch Chief (DRP/A) MIS System

Project Engineer (DRP/A) RIV File

Branch Chief (DRP/TSS) R. Bachmann, OGC (MS: 15 B-18)

DOCUMENT NAME: R:\_STP\ST705RP.DPL

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

PlV:PE:DRP/A l C:DRP/A lj l

RAKopnva;dif * JITapia Q

11/13/97 11/l'$ /97 J'

'Previously Concurred DFFIC;AL RECOPO COPY

..

o

UNITE D ST ATE S

0 -p* f' %,,\ NUCLEAR REGULATORY COMMISSION

.: , -. q

g .<~ j g- REoloN IV

%A ' 611 RYAN PLAZA oRIVE, SulTE 400

AR LINoToN. Y E X AS 76011 8064 -

% , . .".". . .#.

September 9,1997

William T. Cottle, Group Vice

President, Nuclear

Houston Lighting & Power Company

P.O. Box 289

Wadsworth, Texas 77483

SUBJECT: NRC INSPECTION REPORT 50-498/97 05; 50 499/97-05 AND NOTICE OF

VIOLATION: REVISION 1

Dear Mr. Cottle:

On August 9,1997, the NRC completed <sn inspection at your South Texas Project, Units 1

and 2 reactor facility. The enclosed report presents the scope and results of that -

inspection.

E .ir,g the 6 week period covered by this inspection, your conduct of activities at the

South Texas Pioject was generally characterized by safety conscious operations with

strong engineering support. We are concerned, however, about a violation of NRC

requirements related to two examples of inadequate equipment clearance order boundaries.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements,

in addition, the report discusses two additional events that are of concern. Although the

specific safety significance of each event was low, we are concerned that previous

corrective actions taken for similar events were not effective to prevent these occurrences.

The first event was a partial siphon draining of the r pont fuel pool, in the second, plant

workers left plastic bags inside the Unit 1 containnient upon completion of a containment

entry,

in accordar.cc with 10 CFR 2.790 of the NRC's " Rules of Practie," e copy of this letter,

its enclosures, and your response will be placed in the NRC Pi.olic Cocument Room. To

the extent possible, your response should not include any p*,rsoral privacy, proprietary, or

safeguaids information so that it can be placed in the PuFic Dscument Room without

ledaction.

e m -

..

O

._ . . _ . _ - .

..y . . _. . _ . . . _ _ _ _ _ . - _ _ _ . . . _ _ _ . _

.. .

V  :

Houston Lighting &' Power Company? 2- 4

t

'Should you have'any. questions concerning this inspectior.,~ we will be pleased to discuss - ';

them with you.'

Sincerely,. .

--

J .

1

Joseph I. Tapia, Chief . -

"

Project Branch A

Division of Reactor Projects

..

Docket Nos.: 50 498

,

50 499-

License Nos.: NPF 76 -

NPF-80

.

Enclosures:

-1; Notice of Violation-

2. NRC Inspection Report

50 498/97 05:50-499/97-05, REVISION 1

,

- cc w/ enc losures:

Lawrence E. Martin, General Manager

Nuclear Assurance & Licensing -

Houston Lighting & Power Company

P.O. Box 289

Wadsworth, Texas 77483

~

'

Mr. J. C. Lanier/Mr ' M. B. Lee

City of Austin

Electric Utility Department

- 721 Barton Springr Road.

Austin, Texas 78704

Mr. K. J. Fiedler/Mr. M. T. Hardt

City Public Service Board

P.O. Box _1771

San Antonio, Texas 78296

J'ack R. Newman, Esq.

Morgan! Lewis & Bockius

1800 M. Street, N,W.

L Washington, D.C.- 20036-5869

,

1

.1

- .. . _ - . . - _ _ , .

_ . . _ _ _ _ _ _ _,

. . , . . . - - - . -.- . . - - - . . . .

..

o .

-

.{( -

Hodston Oghting & Power. Company-' 3-

Mr. G. E. Vaughn/Mr. C. A. Johnson

.

Central Power & Light Company-_ _

- P.O. Box 289

Mail Code: N5012

1Wadsworth, Texas 7_7483

INPO-

~ Records Center--

700 Galleria Paikway

Atlanta, Georgia ;30339-5957 -

Dr. Bertram Wolfe

15453 Via Vaquero

Monte Sereno, California 95030

Bureau of Radiation Control-

State of Texas

1100 West 49th Street -

'Aus, tin, Texas 78756.

.

-

Mr.,Glenn W. Dishong

Texas Public Utility Commission

7800 Shoal _ Creek Blvd. +-p'

,

Suite 400N

Austin,-' Texas 78757-1024

Andy Barrett, Director

= Environmental Policy-

Office of the Governor

P.O. Box 12428

' Austin, Texas 78711

- Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City,-Texas 77414 -

Licensing Representative.

, Houston Lighting & Power Company-

Suite 610;

LThree Metro Center

Bethesda, Maryland-:'20814

__.

.

'l

, - ~ ,-w.c ..re,e

..

o

Houston Lighting & Power Company -4-

- Rufus 5. Scott, Associate

General Counsel

' Houston Lighting & Power Company

PA, Box 61867

Houstoni Texas 77208

Joseph R. Egan, Esq.

Eg:.n & Associates, P.C.

2300 N Street, N.W.

Washington, D.C. 20037

.

_ - ~ _ ., ._ ..- .. _ . _ _ _. _ , . _ . . _ - - . _ , . . _ _ . _ _ . . - _ . . . _ .

,

.. ,

. _

,

J. -

l3

}-

i Houston Lighting & Power Company; S-  ;

-( :-

_

- E Mail report to T2 Frye (TJF) ,

E Mail report to Ts Hiltz (TGH)

-

- E Mail report to' NRR Event Tracking System (IPAS)-

- E Mail report to Document Control Desk (DOCDESK)'

-- E-Mail report to Richard Correia (RPC) .

'

' E-Mail report to Frank Talbot (FXT)-l

bec" to DCD (IE01)-

bec distrib. by. RIV: .

Regional Administrator - Resident inspector

- DRP Director DRS PSB -

Branch . Chief. (DRP/A) . MIS System

-

-Project Engineer (DRP/Al ~ RIV File -

Branch Chief (DRP/TSS) R. Bachmann, OGC (MS: 15-B-18)-

,

W

L

i

L

'

_ DOCUMEN1 NAME: 1R:\_STP\ST705RP.DPL REVISION!.1'

. To receive copy of document, Ind6cate in boa: "C" = Copy without err.losures "E" = Copy with enclosures "N" = No copy

SRI- C:DRP/A DRS C:DRS/EB D:DRP

DPloveless;cm - JITapia DPerrira TStetka TPGwynn

09/5/97 09/5/97 09/9/97-

'

-

09/5/97- 09/5/97 \

- OFFIC1AL RECORD COPY

_

3+

<

h-, # y - - . ,,.4.._ - ,. . . . - . -..--r. m. . . . ., , . -.

I

.

C

ENCLOSURE 1

Revision 1

NOTICE OF VIOLATION

Houston Lighting & Power Company Dockets: 50-498,

50-499

South Texas Project, Units 1 and 2 Licenses: NPF 76,

NPF-80

During an NRC inspection conducted on June 29 through August 9,1997, a violation of

NRC requirements was identified. In accordance with the " General Statement of Policy

and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

A. Technical Specification 6.8.1.a requires, in part, that written procedures be

established, implemented, and maintained concerning the applicable

procedures recommended in Appendix A of Regulatory Guide 1.33,

Revision 2, February 1978. Regulatory Guide 1.33, Appendix A,

Section 9.e.(1), states that procedures should include information on the

method for obtaining permission and clearance for work. This requirement is

implemented, in part, by Plant General Procedure OPGP03-ZO EC01,

Revision 6, " Equipment Clearance Orders." This procedure requires that

equipment clea,ance orders shall provide adequJte personnel and equipment

safety.

Contrary to the above, on June 24, Equipment Clearance Order 97-2-76518

f ailed to provide adequate persoi at and equipment safety in that Essential

Cooling Water Screen Wash Bouster Pump 2A inadvertently started while the

system was drained.

Also contrary to the above, on July 21, Equipment Clearance

Order 97-1-71609 failed to provide adequate personnel and equipment

safety in that workers breached an unisolated component cooling water

system pipe while performing maintenance on Residual Heat Removal

Pump 18.

This is a Severity Level IV violation (Supplement l} (498:499/97005-03).

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting and Power Company is

hereby required to submit a written statement or explanation to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a

copy to the Regional Administrator, Region IV, and a copy to the NRC Resident inspector

at the f acility that is the subject of this Notice, within 30 days of the date of the letter

transmitting this Notice of Violation. This reply should be clearly marked as a " Reply to a

Notice of Violation" and should include for each violation: (1) the reason for the violation,

or, if contested, the basis for disputing the violation, (2) the corrective steps that have

been taken and the results achieved, (3) the corrective steps that will be taken to avoid

f urther viciations, and (4) the date when full compliance will be achieved. Your response

h l 9

. . _ . . . . - . . . ~ -. . - . -.- -.- - . -. - - ... - - . -

6*

"

,

i

$,.

42 =

e

4

- Revision 1

may. reference or include previous!y' docketed correspondence, if the correspondence

adequately addresses the required response.;lf an adequate reply is not received within

.the time specified in this Notice, an order or a Demand _ for information may be issued as to

_

,

why the license should not be modified, suspended, or revoked, or why such other actisn

i

- as may be~ proper should not be taken. Where good cause is shown, consideration will oe

_

given to extending the response time.- f

- Because your response will be placed in the NRC Public Document Room (PDR), to the--

_

extent possible, it should not include any personal privacy, proprietary, or safeguards -

information so that it can be placed in the PDR without redaction. If personal privacy or-

proprietary information is necessary to provide an acceptable response, then please provide '

a bracketed copy of your response that identifies the information that should be protected

and a redacted copy of your response that deletes such information, if you request ,

withholding of such material, you must specifically identify the portions of your response

_

that you seek to have withheld and provide in detail the bases for your claim of

withholding (e.g., explain why the disclosure of information will create an unwarranted

invasion of personal privacy or provide the information required by-10 CFR 2.790(b) to

support a request for withholding confidential commercial or financial information), if

'

safeguards information is necessary to provide an acceptable response, p! ease provide the

level of protection described in 10 CFR 73.21.

'

Dated at Arlington, Texas

this 9th day of September 1997

1

>