MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
See also: IR 05000498/1997005
Text
fi
'
- e;
h8 "'G% .
UNITEo STATES
- [. _ = [k- _
NUCLEAR REGULATORY COMMISSION
',.: ggotoNgy;
-
-
.$s#6 #- 611 RYAN PL AZA DRIVE; SulTE 400
y
' h . . .#..
[ - ARLINGTON TEXAS 760118064
.
'I40W IT 1997
William T. Cottle, Group Vice
President, Nuclear-
-
Houston. Lighting & Power Company.
P.O. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT 50 498/97-05;50-499/97-05
Dear Mr. Cottle:
NRC inspection Report 50-498/97 05:50 499/97 05 was initially issued
- September 9,1997, with several errors in the numbering of the inspection followup system
~
open items and in some items identified in the Executive Summary. Due to potential
confusion in future correspondence,_ on September 12 we issued a letter and corrected
pages to replace t$ose incorrect pages in the report. We recently identified a section in the
issued report that had been duplicated and incorrectly placed in the report. To minimize
-the confusion in correcting all of the identified errors, we are reissuing Inspection Report
50-498/97 05;50-499/97 05 as Revision 1- Please replace Inspection Report
.
o. 50 498/97-05;50-499/97 05 and all correction pages with Revision 1. We regret any
inconvenience this may have caused.
Sincerely,
.
.
~
Joseph I.=Tapia, Chief
Project Branch A
Division of Reactor Projects
' Docket Nos.: 50-498
.50-499
.. License Nos.: NPF-76
NPF 80
--/
-cc:
Lavurence E. Martin, General Manager
Nuclear Assurance & Licensing
-Houston Lighting & Power Company
P.O. Box 289
f'
Wadsworth, Texas 77483
9711210105 971114
,
PDR-
G
ADOCK 05000498
PDR
h :m.
_
. .
, . . . , -- . . - - _ .. .-.. ~ - -. . . ~
'
.
,
- - .
g -
^
j
JHouston Lighting & Power CompanyL 1-2-
- Mr. J. C! Lanier/Mr. M. B. Lee--
' City of Austin
Electric Utility. Department - ,
721 Barton 9prings Road - ,
-
Austin, Texas: 78704
Mr,' K. J. Fiedler/Mr. M. T. Hardt '
. City Public Service Board
P.O. Box 1771
San Antonio, Texas 78296
Jack R. Newman,' Esq.
.
'
. Morgan, Lewis & Bockius
.
~-1800 M." Street, N.W. ;
'
Washington, D.C. 20036-5869
'
' Mr.'G. E. Vaughn/Mr. C. A. Johnson
Central Power & Light Company
- P.O. Box 289
- Mail Code:' N5012
Wadsworth, Texas' 77483-
lNPO '
Records Center
700 Galleria Parkway
' Atlanta, Georgia- 3J339 5957
'
Dr; Bertram Wolfe
15453 Via Vaquero-
'
- Monte Sereno, California' 95030-
2~
Bureau of Radiation Control
State of Texas.:
1100 West 49th Streat
- Austin, Texas :78756
Mr. Gienn' W. Dishong
' ~
' Texas Public Utility Commission
~7800 Shoal Creek Blvd.
Suite 400N.
- Austin, Texas . 78757-1024
'
.
4 !: [ .
fi M .+
s
%
.iY-.
we M ' -4- e- + u- y- n v ,,~r-- t,--w-+t-- -
e ^W"'
. -- . . _._ ._. - 1~.-. _ . . _. _ _ . . - _ . _ _ _ . .
.
SA- 2
l'
I - 3-
Houston Lighting & Power Company
!
'
4
-
,
John Howard,-Director'
-
,
- Environmental ano Natural Resources Policy +;-
. Office of the Governor :
P.Oi Box 12428.'
Austini: Texas 78711 _
-3
Judge, Matagorda County- ;
>
Matagorda County Courthouse'.
1700 Seventh Street.- *
Bay City, Texas 774141
. .
- 1
Licensing _ Representative
Houston Lighting & Power Company- :
-
. Suite 610'-
- Three Metro Center :
Bethesda, Maryland 20814
-
.
-?
Rufus S. Scott, Associate
General Counsel - ,
Houston Lighting & Power Company'.
' P,0. Box 61867; -:
Houston, Texas- 77208
, L Joseph R. Egan, Esq.
t
Egan & Associates, P.C.
- 2300 N Street, N.W.
-- Washington, D.C. 20037
.. .
$
f_.'
'
!.-
>
<
.
g . .- y -y ,. s, , ,w ,,- - -
,
-_ . . __ ~. -
..-
p
'
.,
'
' Houston Lighting' & Power Company --- 4.- NOV_ , 4 199f.
l
-
i
bec to DCD (IE01)'
bec distrib. b'y RIV: ;
Regional Administrator : - Resident inspector 1
DRP Director DRS-PSB
. Branch Chief (DRP/A) MIS System
Project Engineer _ (DRP/A) ~ RIV File -
R. Bachmann, OGC (MS: 15 B 18)
'
Branch Chief (DRP/TSS)
>
P
+
- DOCUMENT NAME: R:\_STP\ST705RP.DPL
To voceive copy of document. IrMHcate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy
RIV:PE:DRP/A C:DRP/A . j
RAKopriva:dif * JITapia W
11/13/97 11/lV/97 )!
'Previously Ccncurred- VFFIClAL RECORD COPY
. . - .- _
. . -
7#
\
Houston Lighting & Power Company -4- NOV I 4i997
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator Resident inspector
DRP Director DRS-PSB
Branch Chief (DRP/A) MIS System
Project Engineer (DRP/A) RIV File
Branch Chief (DRP/TSS) R. Bachmann, OGC (MS: 15 B-18)
DOCUMENT NAME: R:\_STP\ST705RP.DPL
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
PlV:PE:DRP/A l C:DRP/A lj l
RAKopnva;dif * JITapia Q
11/13/97 11/l'$ /97 J'
'Previously Concurred DFFIC;AL RECOPO COPY
..
o
UNITE D ST ATE S
0 -p* f' %,,\ NUCLEAR REGULATORY COMMISSION
.: , -. q
g .<~ j g- REoloN IV
%A ' 611 RYAN PLAZA oRIVE, SulTE 400
AR LINoToN. Y E X AS 76011 8064 -
% , . .".". . .#.
September 9,1997
William T. Cottle, Group Vice
President, Nuclear
Houston Lighting & Power Company
P.O. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT 50-498/97 05; 50 499/97-05 AND NOTICE OF
VIOLATION: REVISION 1
Dear Mr. Cottle:
On August 9,1997, the NRC completed <sn inspection at your South Texas Project, Units 1
and 2 reactor facility. The enclosed report presents the scope and results of that -
inspection.
E .ir,g the 6 week period covered by this inspection, your conduct of activities at the
South Texas Pioject was generally characterized by safety conscious operations with
strong engineering support. We are concerned, however, about a violation of NRC
requirements related to two examples of inadequate equipment clearance order boundaries.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements,
in addition, the report discusses two additional events that are of concern. Although the
specific safety significance of each event was low, we are concerned that previous
corrective actions taken for similar events were not effective to prevent these occurrences.
The first event was a partial siphon draining of the r pont fuel pool, in the second, plant
workers left plastic bags inside the Unit 1 containnient upon completion of a containment
entry,
in accordar.cc with 10 CFR 2.790 of the NRC's " Rules of Practie," e copy of this letter,
its enclosures, and your response will be placed in the NRC Pi.olic Cocument Room. To
the extent possible, your response should not include any p*,rsoral privacy, proprietary, or
safeguaids information so that it can be placed in the PuFic Dscument Room without
ledaction.
e m -
..
O
._ . . _ . _ - .
..y . . _. . _ . . . _ _ _ _ _ . - _ _ _ . . . _ _ _ . _
.. .
V :
Houston Lighting &' Power Company? 2- 4
t
'Should you have'any. questions concerning this inspectior.,~ we will be pleased to discuss - ';
them with you.'
Sincerely,. .
--
J .
1
Joseph I. Tapia, Chief . -
"
Project Branch A
Division of Reactor Projects
..
Docket Nos.: 50 498
,
50 499-
License Nos.: NPF 76 -
NPF-80
.
Enclosures:
-1; Notice of Violation-
2. NRC Inspection Report
50 498/97 05:50-499/97-05, REVISION 1
,
- cc w/ enc losures:
Lawrence E. Martin, General Manager
Nuclear Assurance & Licensing -
Houston Lighting & Power Company
P.O. Box 289
Wadsworth, Texas 77483
~
'
Mr. J. C. Lanier/Mr ' M. B. Lee
City of Austin
Electric Utility Department
- 721 Barton Springr Road.
Austin, Texas 78704
Mr. K. J. Fiedler/Mr. M. T. Hardt
City Public Service Board
P.O. Box _1771
San Antonio, Texas 78296
J'ack R. Newman, Esq.
Morgan! Lewis & Bockius
1800 M. Street, N,W.
L Washington, D.C.- 20036-5869
,
1
.1
- .. . _ - . . - _ _ , .
_ . . _ _ _ _ _ _ _,
. . , . . . - - - . -.- . . - - - . . . .
..
- o .
-
.{( -
Hodston Oghting & Power. Company-' 3-
Mr. G. E. Vaughn/Mr. C. A. Johnson
.
Central Power & Light Company-_ _
- P.O. Box 289
Mail Code: N5012
1Wadsworth, Texas 7_7483
INPO-
~ Records Center--
700 Galleria Paikway
Atlanta, Georgia ;30339-5957 -
Dr. Bertram Wolfe
15453 Via Vaquero
Monte Sereno, California 95030
Bureau of Radiation Control-
State of Texas
1100 West 49th Street -
'Aus, tin, Texas 78756.
.
-
Mr.,Glenn W. Dishong
Texas Public Utility Commission
7800 Shoal _ Creek Blvd. +-p'
,
Suite 400N
Austin,-' Texas 78757-1024
Andy Barrett, Director
= Environmental Policy-
Office of the Governor
P.O. Box 12428
' Austin, Texas 78711
- Judge, Matagorda County
Matagorda County Courthouse
1700 Seventh Street
Bay City,-Texas 77414 -
- Licensing Representative.
, Houston Lighting & Power Company-
Suite 610;
LThree Metro Center
- Bethesda, Maryland-:'20814
__.
.
'l
, - ~ ,-w.c ..re,e
..
o
Houston Lighting & Power Company -4-
- Rufus 5. Scott, Associate
General Counsel
' Houston Lighting & Power Company
PA, Box 61867
Houstoni Texas 77208
Joseph R. Egan, Esq.
Eg:.n & Associates, P.C.
2300 N Street, N.W.
Washington, D.C. 20037
.
_ - ~ _ ., ._ ..- .. _ . _ _ _. _ , . _ . . _ - - . _ , . . _ _ . _ _ . . - _ . . . _ .
,
- .. ,
. _
,
J. -
l3
}-
i Houston Lighting & Power Company; S- ;
-( :-
_
- E Mail report to T2 Frye (TJF) ,
E Mail report to Ts Hiltz (TGH)
-
- E Mail report to' NRR Event Tracking System (IPAS)-
- E Mail report to Document Control Desk (DOCDESK)'
-- E-Mail report to Richard Correia (RPC) .
'
' E-Mail report to Frank Talbot (FXT)-l
bec" to DCD (IE01)-
bec distrib. by. RIV: .
- Regional Administrator - Resident inspector
- DRP Director DRS PSB -
Branch . Chief. (DRP/A) . MIS System
- -
-Project Engineer (DRP/Al ~ RIV File -
Branch Chief (DRP/TSS) R. Bachmann, OGC (MS: 15-B-18)-
,
W
L
i
L
'
_ DOCUMEN1 NAME: 1R:\_STP\ST705RP.DPL REVISION!.1'
. To receive copy of document, Ind6cate in boa: "C" = Copy without err.losures "E" = Copy with enclosures "N" = No copy
- SRI- C:DRP/A DRS C:DRS/EB D:DRP
DPloveless;cm - JITapia DPerrira TStetka TPGwynn
09/5/97 09/5/97 09/9/97-
'
-
09/5/97- 09/5/97 \
- OFFIC1AL RECORD COPY
- _
3+
<
h-, # y - - . ,,.4.._ - ,. . . . - . -..--r. m. . . . ., , . -.
I
.
C
ENCLOSURE 1
Revision 1
NOTICE OF VIOLATION
Houston Lighting & Power Company Dockets: 50-498,
50-499
South Texas Project, Units 1 and 2 Licenses: NPF 76,
NPF-80
During an NRC inspection conducted on June 29 through August 9,1997, a violation of
NRC requirements was identified. In accordance with the " General Statement of Policy
and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
A. Technical Specification 6.8.1.a requires, in part, that written procedures be
established, implemented, and maintained concerning the applicable
procedures recommended in Appendix A of Regulatory Guide 1.33,
Revision 2, February 1978. Regulatory Guide 1.33, Appendix A,
Section 9.e.(1), states that procedures should include information on the
method for obtaining permission and clearance for work. This requirement is
implemented, in part, by Plant General Procedure OPGP03-ZO EC01,
Revision 6, " Equipment Clearance Orders." This procedure requires that
equipment clea,ance orders shall provide adequJte personnel and equipment
safety.
Contrary to the above, on June 24, Equipment Clearance Order 97-2-76518
f ailed to provide adequate persoi at and equipment safety in that Essential
Cooling Water Screen Wash Bouster Pump 2A inadvertently started while the
system was drained.
Also contrary to the above, on July 21, Equipment Clearance
Order 97-1-71609 failed to provide adequate personnel and equipment
safety in that workers breached an unisolated component cooling water
system pipe while performing maintenance on Residual Heat Removal
Pump 18.
This is a Severity Level IV violation (Supplement l} (498:499/97005-03).
Pursuant to the provisions of 10 CFR 2.201, Houston Lighting and Power Company is
hereby required to submit a written statement or explanation to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a
copy to the Regional Administrator, Region IV, and a copy to the NRC Resident inspector
at the f acility that is the subject of this Notice, within 30 days of the date of the letter
transmitting this Notice of Violation. This reply should be clearly marked as a " Reply to a
Notice of Violation" and should include for each violation: (1) the reason for the violation,
or, if contested, the basis for disputing the violation, (2) the corrective steps that have
been taken and the results achieved, (3) the corrective steps that will be taken to avoid
f urther viciations, and (4) the date when full compliance will be achieved. Your response
h l 9
. . _ . . . . - . . . ~ -. . - . -.- -.- - . -. - - ... - - . -
6*
"
,
i
$,.
42 =
e
4
- Revision 1
may. reference or include previous!y' docketed correspondence, if the correspondence
adequately addresses the required response.;lf an adequate reply is not received within
.the time specified in this Notice, an order or a Demand _ for information may be issued as to
_
,
why the license should not be modified, suspended, or revoked, or why such other actisn
i
- as may be~ proper should not be taken. Where good cause is shown, consideration will oe
_
given to extending the response time.- f
- Because your response will be placed in the NRC Public Document Room (PDR), to the--
_
extent possible, it should not include any personal privacy, proprietary, or safeguards -
information so that it can be placed in the PDR without redaction. If personal privacy or-
proprietary information is necessary to provide an acceptable response, then please provide '
a bracketed copy of your response that identifies the information that should be protected
and a redacted copy of your response that deletes such information, if you request ,
withholding of such material, you must specifically identify the portions of your response
_
that you seek to have withheld and provide in detail the bases for your claim of
withholding (e.g., explain why the disclosure of information will create an unwarranted
invasion of personal privacy or provide the information required by-10 CFR 2.790(b) to
support a request for withholding confidential commercial or financial information), if
'
safeguards information is necessary to provide an acceptable response, p! ease provide the
level of protection described in 10 CFR 73.21.
'
Dated at Arlington, Texas
this 9th day of September 1997
1
>