Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML20199D950
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9711210069
Download: ML20199D950 (7)


Text

-- _ _ _ . ._ __

y _ - . . . - . _ _ _ . . .

I i

  1. 8460s, . UNITt3 sT Af ts )

. .!. t NUCLEAR REGULATORY COMMISSION f

[ t $ nrosoN iv

- t h 'h[ # . sii nvAN PLAZA onive sviTE 400 AnLINoToN. T E X AS 760118064 l

[

\*#

  • e e ,

John R. McGaha, Vice President Operations River Bend Stat!on i Entergy Operations, Inc.

P.O. Box 220 '

St. Francisville, Louisiana 70775

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) RIVER BEND STATION

Dear Mr. MaGaha:

On October 9,1997, the NRC staff completed the Semlannual Plant Performance Review (SPPR) of River Bend Station. The staff conducts theon reviews for all operating

. nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for River Bend Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April through September 1997. SPPRs provide NRC management with a current summary of licensee performance as d serve as inputs to the NRC Systematic Assessment of Licenseo Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the River Bend Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. The regional initiative inspection scheduled is consistent with SALP assesoments. Resident inspections are riot listed due to their ongoing and continuous nature, We willinform you of any changes to the inspection plan, if you have any questions, please contact Elme Collins at (817) 860 8291.

Sincerol

[ -

D Thomas P, Gwyn , Dire or Division of Reactt r Pr ects

' Docket No.:' S0 458 [

License No.: NPF 47 h

^

W"1888

  • 7AL""

1115 E Elf spil o

i Entergy Operations, Inc. 2 .

?

Enclosure:

Inspection Plan ,

cc w/ enclosure: -

Executive Vice President and ,

Chief Operating Officer ,

Entergy Operations, Inc.

P.O. Box 31995 .

7 Jackson, Mississippl 39286 1995  !

Vice President i

- Operations Support Entergy Operations, Ir.c.

P.O. Box 31995 ,

Jackson, Misalssippi 392861995 i

General Manager Plant Operations i

River Bend Ftation Entergy Operations, Inc.

P.O. Box 220

'St. Francisville, Louisiana 70775 l Director Nuclear Safety River Bend Station '.

Entergy Operations, Inc.

P.O. Box 220

. St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005 3502 o .- Manager - Licensing

~

River Bend Station Entergy Operations, Inc. . ,

P.O. Box 220

-St. Francisville, Louisiana 70775 1

3- , Entergy Opetetions, Inc. 3

'The Honorable. Richard P. leyoub Atterney General P.0, Box 94095

  • Baton Rouge, Loulslana - 70804 9095 H. Anne Plettbger 3456 Villa Rose Drive Baton Rouge, Loulslana 70806 President of West Felselana Polico Jury P.O. Box 1921 *.

St. Francisville, Loulslana 70775 Joint Ownership Manager-Calun Electric Power Conp. Inc.

P.O. Box 15540 Baton Rouge, Louisiana 70895 William Hi Spell, Administrator Louislana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884 2135 i

1 l

Entergy Operations, Inc. 4 NOV t4 1997 )

bec to DCD (IE01) bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS PSB Brancn Chief (DRP/C) MIS System 4 Project Engineer (DRP/C) RIV File Branch Chief (DRP/TSS) Resident inspector i

I DOCUMENT NAME: R:\_RB\RBSP9704.LTR To receive copy of document, indicate in box: "C = Copy without enclosures "E" = Copy wth enclosures "N" = No copy RIV:P4pijtP/C C:D,RP/C D:DRS ,,, D:DRP J ,

MPSifint\g(f.df EEDd11 ins ATHo_wel19P TPGwynn L/ /

101 \/97 " 10tt,j/97 1$/f.Y97 [# 1@//'//97 ,

OFFIC AL RECORD COPY l l

l

j El $N Entergy Operations, Inc. . 4 f i

L t

L bec to DCD flE01)  !

?

bec distrib. by RIV: .

Regional Administrator Senior Resident inspector (Grand Gulf)  !

CHP Director - DRS PSB ,

, Branch Chief (DRP/C) MIS System ,

Project Engineer (DRP/C) RIV File i Branch Chief (DRP/TSS) Resident inspector j P

i i

4 i

r I

i l

i Y

DOCUMENT NAME: R:\;RB\RBSP9704.LTR to recein copy of documentiindicate in boc "c" = copy wahout enclosures ."E" = Copy with enclosures "N" = No copy RIV:PEy@P/C . C:D.RP/C D:DHS , ; D:DRP J .

MPSIGnWdf EEOdilins ATHowell >I TPGwynn f/ f 10til/97 19/i'197 l' 106)/97 W 19//3fl97 OFFIClAL RECORD COPY ,

v.r t' P -4 '

1 77' t 6 a w-* V V'- 'Nw-'vyrv 'w v Wtr *= =r vtu t- t- - =-* -wwtw

  • TVer t' v' (ve'r--w--- -T'ee-r'-'- w =v-w7s + vu-r-grw +w T wo i, y*w w+, -

-pwr*wi-ie--T==- V --- -

o .

RIVER BEND STATION INSPECTION PLAN IP - Inspection Piocedure TI - Temporar; instruction Core inspection Minimum NRC Inspection Program (mandatory all plants)

I i INSPECTION TITLLEI NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 73756 INSERVICE TESTING 2 12/01 -12/05/97 REGION AL INITIATIVE IP 71001 LICENSE OPERATOR 2 12/08-12/12/98 CORE INSPECTION REQUAllFICATION INSPECTION IP 81700 SECURITY 1 01/12-01/16/98 CORE INSPECTION IP 82301 E P EXERCISE 5 02/09-02/13/98 CORE INSPECTION IP 83750 OCCUPATIONAL 1 02/23-02/27/98 CORE INSPECTION RADIATION EXPOSURE

  • IP 73753 INSERVICE INSPECTION 1 03/02-03/06/98 CORE INSPECTION IP 82701 E P OPS STATUS 2 03/16-03/20/98 REGIONAL INITIATIVE IP 93809 SAFETY SYS ENGR 5 05/04 -05/08/98 REGIONAL TEAM (CORE AND INIIIATIVE)

IP 37001 50.59 IP 93809 SAFETY SYS ENGR 4 05/18-05/22/98 REGIONAL TEAM (CORE AND INITIATIVE)

IP 40500 SELF-ASSESSMENT 3 06/08-06/12/98 CORE INSPECTION 06/22-06/26/98