GPU Nuclear Corporation
- - Nuclear
- =,ome a 48o s
Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84-2386 Writer's Direct Dial Number:
June 17, 1986 5211-86-2109 Office of Nuclear Reactor Regulation Attn:
J. F. Stolz, Director PWR Projects Directorate No. 6 g
U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
L Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Post Eddy Current Inspection Report Following the completion of the Eddy Current Inspection of TMI-1 A and B steam L
generator tubes, Technical Specification 4.19.5a requires a report to be submitted, of the number of tubes repaired or removed from service, within 15 days of the completion of the inspection. Tube plugging was completed on April 18, 1986.
The requisite information for the SM eddy current outage was provided to the NRC on May 2,1986 (Reference 1).
Technical Specification 4.19.5b requires that the complete results of the steam generator tube inservice inspection be reported to the NRC within 3 months following completion of the inspection, including (a) number and extent of tubes inspected, (b) location and percent of wall thickness penetration for r.
each indication of an imperfection; and (c) identification of tubes repaired or removed from service. TDR 781 Rev.1, "Results of Outage SM ECT Examinations of the TMI-1 OTSG's", provides a comprehensive assessment of the SM eddy current inspection results, and addresses the specific reporting requirements of Technical Specification 4.19.5b.
=-
TDR 781 also includes a tabulation of degraded tubes by tube number, indication elevation, signal amplitude, phase angle, and throughwall penetration, and a comparison on a tube by tube basis with the results of the 1984 inspection. This information exceeds the reporting requirements of Technical Specification 4.19.5.b and is provided for Outage SM as requested by NRC's consultant C. Dodd of ORNL during a meeting with the NRC staff on May 15,1986.
8606230141 860617 gG\\
ADOCK0500g9 I
DR 5
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
5211-86-2109 June 17, 1986 This letter ft!1f t11s the requirements of Technical Specification 4.19 for Outage SM.
Sincerely,
/ b,$ W H'.D.Hdci1 Vice President and Director, TMI-1 HDH/SK/pa(3508f) cc:
R. Conte J. Thoma
Reference:
(1) GPUN Letter 5211-86-2085, H. D. Hukill to J. F. Stolz,
" Post Eddy Current Inspection Report", May 2,1986.