UNITED STATES
y j g~ 4(/f g
NUCLEAR REGULATORY COMMISSION
.
%'
E
REGloN IV
,o'[
0.,
d
611 RYAN PLAZA DRIVE. SUITE 400
%,
W
ARLINGTON.1EXAS 76011-8064
.....
JAN I 21999
EA 98-544
Garry L. Randolph, Vice President and
Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
SUBJECT: NRC INSPECTION REPORT 50-483/98-25 AND NOTICE OF VIOLATION
Dear Mr. Randolph:
From November 15 through December 26,1998, a routine inspection was conducted at your
Callaway Plant reactor facility. The enclosed report presents the scope and results of that
inspection.
During the inspection period, your conduct of activities at the Callaway Plant was generally
characterized by safety-conscious operations, sound engineering and maintenance practices,
and careful radiological work controls.
Based on the results of this inspection, the NRC has detarmined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and
the circumstances surrounding it are described in detailin the subject inspection report. The
violation involved the failure to perform a written safety evaluation for an inconsistency between
i
emergency operating procedure steps for transfer to cold leg recirculation and the Final Safety
Analysis Report.
The NRC has concluded that information regarding the reason for the violation and the
corrective actions taken and planned to correct the violation and prevent recurrence is already
,
adequately addressed on the docket in this inspection report. Therefore, you are not required
to respond to this letter unless the description therein does not accurately reflect your corrective
actions or your position. In that case, or if you choose to provide additional information, you
should follow the instructions specified in the enclosed Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
h12OO252990112
ADOCK 05000403
G
-
Union Electric Company
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
W//
David N. Graves, Acting Chief
Project Branch B
Division of Reactor Projects
Docket No.:
50-483
License No.: NPF-30
Enclosures:
2. NRC Inspection Report
50-483/98-25
cc w/ enclosures:
Professional Nuclear Consulting, Inc.
l
19041 Raines Drive
Derwood, Maryland 20855
John O'Neill, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, N.W.
Washington, D.C. 20037
H. D. Bono, Supervising Engineer
Quality Assurance Regulatory Suppod
Union Electric Company
P.O. Box 620
!
Fulton, Missouri 65251
Manager - Electric Department
i
(
Missouri Public Service Commission
301 W. High
P.O. Box 360
Jefferson City, Missouri 65102
,
Ronald A. Kucera, Deputy Director
Department of Natural Resources
P.O. Box 176
Jefferson City, Missou-i 65102
n.-
- -
-
--
23 ,
Union Electric Company
-3-
Otto L. Maynard, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
Dan I. Bolef, President
Kay Drey, Representative
Board of Directors Coalition
for the Environment
6267 Delmar Boulevard
l
University City, Missouri 63130
Lee Fritz, Presiding Commissioner
Caliaway County Court House
10 East Fifth Street
j
Fulton, Missouri 65151
Alan C. Passwater, Manager
Licensing and Fuels
AmerenUE
One Ameren Plaza
1901 Chouteau Avenue
P.O. Box 66149
St. Louis, Missouri 63166-6149
J. V. Laux, Manager
Quality Assurance
Union Electric Company
l
P.O. Box 620
Fulton, Missouri 65251
l'
Jerry Uhlmann, Director
State Emergency Management Agency
P.O. Box 116
Jefferson City, Missouri 65101
t
l
,
l
i
- ..
)
p
i
1.
Union Electric Company
4
JAN l 21999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Granch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
G. F. Sanborn, D: ACES
W. L. Brown, RC
J. Lieberman, OE, MS: 7-H5
OE:EA File, MS: 7-H5
j
l
l
l
i
200007
\\
DOCUMENT NAME: R:\\_CW\\CW825RP.DGP
To recolve copy of document. Indicate in bar: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:RI
v-l
l. s
AC:DRP/B l
l
l
FLBrush 7 A
DGPassehlf u- DNGraves l'
1/ o /99 '/
1/W /99 y/
1/ iv/99
l
{ OFFICIAL RECORD COPY
.
Union Electric Company
-4-
JAN I 21999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk 'DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
G. F. Sanborn, D: ACES
W. L. Brown, RC
J. Lieberman, OE, MS: 7-H5
OE:EA File, MS: 7-H5
l
i
I
l
l
l
(
!
DOCUMENT NAME: R:\\_CW\\CW825RP.DGP
I
To receive copy of document, Indicate in box: "C" = Copy without enclosuces "E" = Copy with enclosures *N" = No copy
RIV:RI
me-l
l. m
AC:DRP/B j
l
FLBrush th
DGPassehlfcJ DNGraves IP
1/ sv/99 '#
1/\\\\/ /99 VW
'
1/ v/99
i
'
{ OFFICIAL RECORD COPY