Forwards Insp Rept 50-483/98-25 on 981115-1226 & NOV Re Failure to Perform Written Safety Evaluation for Inconsistency Between Emergency Operating Procedure Steps for Transfer to Cold Leg Recirculation
ML20199D919
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/12/1999
From: Graves D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20199D924 List:
References
50-483-98-25, EA-98-544, NUDOCS 9901200252
Download: ML20199D919 (5)


See also: IR 05000483/1998025

Text

p2 Mf Cg

y

%,

UNITED STATES

y j g~ 4(/f g

NUCLEAR REGULATORY COMMISSION

.

%'

E

REGloN IV

,o'[

0.,

d

611 RYAN PLAZA DRIVE. SUITE 400

%,

W

ARLINGTON.1EXAS 76011-8064

.....

JAN I 21999

EA 98-544

Garry L. Randolph, Vice President and

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT 50-483/98-25 AND NOTICE OF VIOLATION

Dear Mr. Randolph:

From November 15 through December 26,1998, a routine inspection was conducted at your

Callaway Plant reactor facility. The enclosed report presents the scope and results of that

inspection.

During the inspection period, your conduct of activities at the Callaway Plant was generally

characterized by safety-conscious operations, sound engineering and maintenance practices,

and careful radiological work controls.

Based on the results of this inspection, the NRC has detarmined that a violation of NRC

requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and

the circumstances surrounding it are described in detailin the subject inspection report. The

violation involved the failure to perform a written safety evaluation for an inconsistency between

i

emergency operating procedure steps for transfer to cold leg recirculation and the Final Safety

Analysis Report.

The NRC has concluded that information regarding the reason for the violation and the

corrective actions taken and planned to correct the violation and prevent recurrence is already

,

adequately addressed on the docket in this inspection report. Therefore, you are not required

to respond to this letter unless the description therein does not accurately reflect your corrective

actions or your position. In that case, or if you choose to provide additional information, you

should follow the instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

h12OO252990112

ADOCK 05000403

G

PDR

-

Union Electric Company

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

W//

David N. Graves, Acting Chief

Project Branch B

Division of Reactor Projects

Docket No.:

50-483

License No.: NPF-30

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-483/98-25

cc w/ enclosures:

Professional Nuclear Consulting, Inc.

l

19041 Raines Drive

Derwood, Maryland 20855

John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Suppod

Union Electric Company

P.O. Box 620

!

Fulton, Missouri 65251

Manager - Electric Department

i

(

Missouri Public Service Commission

301 W. High

P.O. Box 360

Jefferson City, Missouri 65102

,

Ronald A. Kucera, Deputy Director

Department of Natural Resources

P.O. Box 176

Jefferson City, Missou-i 65102

n.-

- -

-

--

23 ,

Union Electric Company

-3-

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan I. Bolef, President

Kay Drey, Representative

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

l

University City, Missouri 63130

Lee Fritz, Presiding Commissioner

Caliaway County Court House

10 East Fifth Street

j

Fulton, Missouri 65151

Alan C. Passwater, Manager

Licensing and Fuels

AmerenUE

One Ameren Plaza

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Missouri 63166-6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

l

P.O. Box 620

Fulton, Missouri 65251

l'

Jerry Uhlmann, Director

State Emergency Management Agency

P.O. Box 116

Jefferson City, Missouri 65101

t

l

,

l

i

- ..

)

p

i

1.

Union Electric Company

4

JAN l 21999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Granch Chief (DRP/B)

MIS System

Project Engineer (DRP/B)

RIV File

Branch Chief (DRP/TSS)

G. F. Sanborn, D: ACES

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE:EA File, MS: 7-H5

j

l

l

l

i

200007

\\

DOCUMENT NAME: R:\\_CW\\CW825RP.DGP

To recolve copy of document. Indicate in bar: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:RI

v-l

SRI

l. s

AC:DRP/B l

l

l

FLBrush 7 A

DGPassehlf u- DNGraves l'

1/ o /99 '/

1/W /99 y/

1/ iv/99

l

{ OFFICIAL RECORD COPY

.

Union Electric Company

-4-

JAN I 21999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk 'DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/B)

MIS System

Project Engineer (DRP/B)

RIV File

Branch Chief (DRP/TSS)

G. F. Sanborn, D: ACES

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE:EA File, MS: 7-H5

l

i

I

l

l

l

(

!

DOCUMENT NAME: R:\\_CW\\CW825RP.DGP

I

To receive copy of document, Indicate in box: "C" = Copy without enclosuces "E" = Copy with enclosures *N" = No copy

RIV:RI

me-l

SRI

l. m

AC:DRP/B j

l

FLBrush th

DGPassehlfcJ DNGraves IP

1/ sv/99 '#

1/\\\\/ /99 VW

'

1/ v/99

i

'

{ OFFICIAL RECORD COPY