f, BALTIMORE OAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 NUCLEAR ENGINEERING SERVICES DEPARTMENT
' cALysRt curra NUCLEAR POWER PLANT LUtef, MARYLANO 20e57 June 12,1986 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 ATTENTION:
Mr. Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
SUBJECT:
Calvert Clifis Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Technical Support Center Computer
REFERENCES:
(a)
Letter from Mr. 3. A. Tiernan (9G&E), to Mr. A. C. Thadani (NRC),
same subject, dated May 5,1986 (b)
Letter from Mr. A. E. Lundvall, Jr. to Mr. T.' E. Murley (NRC),
Response to Inspection Report Nos. 317-85-16 and 317-85-14, dated October 8,1985 Gentlemen:
Reference (a) provided a list of variables to be displayed in the Technical Support Center l
(TSC). We have discovered a typographical error within this list and ask that you update Reference (a) as described below.
l Item number (AX18) in Attachment A should include footnote (3). The correct status of Boric Acid Charging Flow is that the variable is not available at this time, but will be available prior to startup following the cycle 10 refueling outage-Unit 1 (estimated to be Spring 1988) and cycle 9 refueling outage-Unit 2 (estimated to be Spring 1989). We apologize for any inconvenience this may cause.
For additional information regarding item number (AX29), titled Main Vent Radiation / Flow, please refer to our discussion in Reference (b).
As explained in Reference (b), the instrumentation does not measure the flow rate but does measure radiation inpCi/cc and is adequate for post-accident monitoring.
l
,J k-
jh I
Mr. Ashok C. Thadant
- June 12,1986 Page 2 Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yours, OAbW b
Principal Engineer Licensing Unit LES/ WPM / dim cc: