ML20199C641

From kanterella
Jump to navigation Jump to search
Forwards Itinerary for Commissioner Zech 860623 & 24 Visit to Facilities
ML20199C641
Person / Time
Site: Palisades, Cook, 05000000
Issue date: 06/13/1986
From: Burgess B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Humenansky D
NRC COMMISSION (OCM)
References
NUDOCS 8606180212
Download: ML20199C641 (4)


Text

,

VDvl$

JUN 13 1983 MEMORANDUM FOR: D. F. Humenansky, Technical Assistant, OCM o

FROM: B. L. Burgess, Chief, Projects Section 2A, Division of Reactor Projects

SUBJECT:

COMMISSIONER ZECH'S VISIT TO PALISADES AND D. C. COOK Attached is the itenerary for Commissioner Zech's visit to the Palisades and D. C. Cook plants on June 23 and 24, 1986. The times listed are proposed and can be changed as you desire. As we discussed earlier, A. B. Davis and I will provide transportation to and from the Kalamazoo Airport and during your visit.

Please feel free to call me (FTS 388-5689) should you have any questions.

B. L. Burgess, Chief Projects Section 2A

Attachment:

As Stated cc w/ attachment:

C. E. Norelius A. B. Davis l

l

%06]Qgy $$ g5 P

W RIII R

?

/

S Burgess Guldemand 06/13/86 h gyyb ] tig ;

, Visit by Consnissioner Zech June 23 and 24, 1986 Palisades Itinerary Monday, June 23, 1986 09:51 a.m. (EDT) Commissioner arrives in Kalamazoo, Michigan 10:15 a.m. Depart Kalamazoo Airport 11:45 a.m. Lunch in South Haven Senior Resident Inspector from Palisades to meet Zech party at restaurant 01:00 p.m. Arrive at Palisades site

-01:10 p.m.

Meet with utility for presentation (30-45 minutes)

Presentation should include:

Past, present and anticipated problems and corrective actions for each Transparencies for the following perfonnance indicators:

' 1. Unplanned trips

2. LERs by cause code
3. SR0/R0 exam rates
4. Liquid / Solid / Gaseous releases and exposure
5. ESF Actuations Transparency on Organization (no more than two minutes)

Training Accreditation Status Transparency on Shift Arrangement including names, experience and education 1:50 p.m. Plant Tour i

l I

45 minutes in control room

! interviews with shift engineer / shift supervisor (topics of discussion to include procedures, alarm and control board familiarity)

Visit by Commissioner Zech 2 Palisades Itinerary Monday, June 23, 1986 02:35 p.m. Continue tour (Conducted by Plant Manager)

Topics of Interest

1. May 19 equipment failures
2. Chemistry Labs
3. Training 03:35 p.m. Tour training building 15 minute pep talk with all available operators 04:15 p.m. Exit with licensee managers (45 minute presentation by ConmissionerZech) 05:00 p.m. Depart site
07
00 p.m. Dinner at Holidome or other acceptable restaurant l

l.

l l

I

Visit by Connissioner Zech ~3 D. C. Cook Itinerary Tuesday, June 24, 1986 07:00a.m.(EDT) Breakfast at the Holidome (meet with Resident Inspectors) 08:00 a.m. Arrive at D. C. Cook site 8:15 a.m. Meeting for utility presentation (30-45 minutes)

Presentation should include:

Past, present and anticipated problem and correcrive actions for each Transparencies for the following performance indicators:

1. Unplanned trips
2. LERs by cause code
3. SR0/R0 Exam rates
4. Liquid / Solid / Gaseous releases and exposures
5. ESF Actuations Transparency on Organization (no more than 2 minutes)

Training accreditation status Transparency on shift arrangement (including names, experience and education) 09:00 a.m. Plant Tour 45 minutes in control room Interviews with shift supervisor / assistant shift supervisor / unit supervisor (topics of discussion to include procedures, alarms and control panel familiarity) 09:45 a.m. Continue Plant Tour (conducted by Plant Manager) 1 -

Topics of Interest Equipment problems related to recent events Chemistry Labs Training 11:15 a.m. Tour training building 15 minute pep talk with all available operators 11:45 a.m. Meet with licensee managers 45 minute presentation by Commissioner Zech 01:00 p.m. Depart site 02:30 p.m. LunchinKalamazoo(optional)

I w