Georgi 2 Power Comp:,ny
- ~
Routa 2. Box 299A Wayresboro, Georgia 30830 Telephone 404 554 9961 404 724-8114 Southern Company Services,Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 8704011 Vogtle Proj.ect June 13, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-946 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 18: EXAMINATION OF STEAM GENERATOR TUBES
Dear Mr. Denton:
A preservice eddy-current examination of the full-length of the VEGP Unit 1 steam generator tubes has been completed. Examination was accomplished on 100% of the length of all tubes by making entry from both the cold-leg and hot-leg sides. The cold-leg was examined to the upper support. The hot-leg examination included the area around the U-bend to the upper support on the cold leg side. In addition, strip charts were prepared and, from these, an independent review and analysis was accomplished on 100% of the data.
Six tubes had initially been reported as being plugged by Wetinghouse. These tubes were verified as plugged, and no additional tubes were piugged as a result of this preservice examination.
A profilometry examination was accomplished in the region extending from the end of the tube to 2-1/2 inches above the top of the tube-sheet for 100% of the tubes. The tubes which were found to be under-expanded were reexpanded by l
Westinghouse. Reexamination revealed these tubes to be acceptable. No tubes were found to be over-expanded.
In summary, all the tubes in each of the four Unit 1 steam generators were found to be serviceable with the exception of six tubes which were plugged by the manufacturer. The detailed test reports are available at the Vogtle site for your staff's inspection.
I
$%86 $880$ SISShj4 gggl E
\\\\o
Director of Nuclear Reactor Regulation File: X7BC35 June 13, 1986 Log:
GN-946 Page 2 If your staff requires any additional information, please do not hesitate to contact me.
Sincerely, Y
J. A. Bailey Project Licensing Manager JAB /caa xc:
R. E. Conway G. Bockhold, Jr.
R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire W. C. Ramsey M. A. Miller L. T. Cucwa B. Jones, Esquire Vogtle Project File 0535V V