9
~.
Enti gy Oporttions,Inc.
N!tona LA 700(60761 Tel 504 739 6f40 y eP r a.s wuw 3 W3F1-98-0013 A4.05 PR January 27,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk WashingMn, D.C. 20555
Subject:
Waterford 3 SES Decket No. 50-382 License No. NPF-38 Quality Assurance Program Manual Update Gentlemen:
Pursuant to the requirements of 10 CFR 50.54(a)(3), Waterford 3 is submitting the Quality Assurance Program Manual (QAPM) updates for the period May 2,1996 to December 1,1997. The submittalincludes seven (7) sets of Quality Assurance (QA) Program Changes which are grouped acccrding to the seven revisions (12 through 18) to the QAPM Table of Contents and are incorporated in seven corresponding attachments. The changes are deemed to not result in lessening of j) commitments to the QA Program; therefore, NRC approval was not secured prior to implementation. A summary description of the changes relating to each Table of Contents revision is provided in Attachment A.
Attachments I through VI include the associated QAPM Table of Contents, the 10 CFR 50.54 Quality Assurance Program Change Review form, summary sheets, l
and the "before" and "after" changed pages for each affected chapter. The last l
version of the QAPM, Rcvision 18, is provided as Attachment Vil and includes all pages for all chapters. All affected sections are noted with revision bars in the right margin next to the changes.
ll!ll!II:~ 1 lii !!. !.l o
9001290075 900127 l
PDR ADOCK 05000392
}
P PDR I
a
i Quality Assurance Program Manual Update W3F198-0013 Page 2 January 27,1998 If you have any questions concerning this submitta!, please contact Early Ewing at (504) 739-6242 or Tim Gaudei at (504) 739-6666.
Very truly yours, t
[
C.M. Dugger Vice President, Operations Waterford 3 CMD/lHS/ssf Attachments (w/ Attachments) cc:
E.W. Merschoff (NRC Region IV)
NRC Resident inspectors Office (w/o Attachments)
C.P. Patel (NRC-NRR)
J. Smith N.S. Reynolds
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of
)
)
1 Entergy Operations, Incorporated
)
Docket No. 50-382 Waterford 3 Steam Electric Station
)
AFFIDAVIT Charles Marshall Dugger, being duly sworn, hereby deposes and says that he is Vice President, Operations - Waterford 3 of Entergy Operations, Incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Quality Assurance Program Manual Update that he is familiar with the content thereof; and that the matters set torth therein are true and correct to the best of his knowledge, information and belief.
Y Mi 0
Charles Marshall Dugger Vice President, Operations Waterford 3 STATE OF L OUISIANA
)
) ss PARISH OF ST. CHARLES
)
Subscribed and sworn to before me, a Notary Public in and for the Parish and State above named this 2,t day of Wme
,1998.
[
O I
x 2:l c_ f e
Notary Public c'
My Commission expires
/ d'dY L
Attachment A to W3F1-98-0013 Page 1 of 3 Summary Description of the Changes Relating to Each Table of Contents Revision Attachment QAPAt Revised Number Table of Content Revision ChapterNumbers Description of Changes l
Table of Contents Revision 12 Chapter 1, Rev.11, Composition of Plant Operating Review Chapter 16, Rev. 6, Committee (PORC), Safety Review Appendix A, Rev. 5 Committee, and Organizational Changes 11 Tsbie of Contents Revision 13 Chapter 1, Rev.12, Organizational Changes and clarification Chapter 2, Rev.10, of material traceability requirements Chapter 6, Rev. 6, Chapter 7, Rev. 6, Chapter 8, Rev. 5, Chapter 15, Rev. 6, Chapter 16, Rev. 7, Chapter 17, Rev. 5, Chapter 18, Rev. 6 Ill Table of Conwnts Revision 14 Chapter 1, Rev.13, Identifies Entergy Operations, Inc. (EOI)
Chapter 2, Rev.11, shared services between EOI sites, J
Chapter 4, Rev. 5, Organizational and Responsibility Chapter 7, Rev. 7,
- Changes, Chapter 15, Rev. 7, Chapter 16, Rev. 8, Chapter 18, Rev. 7 IV Table of Contents Revision 15 Chapter 1 Rev.14, Typographical corrections Chapter 5, Rev. 5 E
e s
3 v
n- - - -, -
-w---
1 Attachment A to W3F1-98-0013 Page 2 of 3 Attachment QAPM Revised Number Table of Content Revision ChaptcrNumbers Description of Changes V
Table of Contents Revision 16 Chapter 1, Rev.15, Organizational and Title Changes Chapter 2, Rev.12, Chapter 3, Rev. 4 Chapter 4, Rev. 6, Chapter 5, Rev. 6, Chapter 6. Rev. 7, Chapter 7, Rev. 8, Chapter 8, Rev. 6, Chapter 9, Rev. 6, Chapter 10, Rev. 7, Chapter 11, Rev. 3, Chapter 12, Rev. 3, Chapter 13, Rev. 5, Chapter 14, Rev. 2, Chapter 15, Rev. 8, Chapter 16, Rev. 9, Chapter 17, Rev. 6, Chapter 18, Rev. 8, Appendix A, Rev. 6, Appendix B, Rev.1 Appendix C, Rev. 6 VI
. Tab:e of Contents Revision 17 Chapter 1, Rev.16 Clarification on PORC Composition 1
+-v-
--v r-g w-
-V
Attachment A to W3F1-98-0013 Page 3 of 3 Attachment QAPM Revised Number Table of Content Revision Chapterl' 'nbers Description of Change:
Vil Table of Contents Revision 18 Chapter 1 Rev.18, Manual Reformatting, Forward and Policy Chapter 2, Rev.18, Statement Deletion, Organizational Name Chapter 3, Rev.18, Changes associated with Approval, Chapter 4, Rev.18, Reporting, and Responsibility Changes, Chapter 5, Rev.18, Addition of Material, Purchasing, and Chapter 6, Rev.18, Contracts Administrative Manual, Chapter 7, Rev.18, Administrative Changes for language and Chapter 8, Rev.18, terminology clarification, Revision of Chapter 9. Rev.18, various Terms and Definitions, and Chapter 10, Rev.18, placement of the Appendices in Chapter Chapter 11, Rev.18, 2 as Attachments I
Chapter 12, Rev.18, Chapter 13, Rev.18, Chapter 14, Rev.18, Chapter 15. Rev.18, Chapter 16, Rev.18, Chapter 17, Rev.18, Chapter 18, Rev.18 O
O