Forwards Revised Epips,Including Rev 26 to EP-002-010,rev 21 to EP-002-060,rev 9 to EP-002-061,rev 6 to EP-002-090,rev 17 to EP-002-130,rev 15,change 1 to EP-002-050,rev 25,change 1 to EP-002-102
ML20199B623
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/14/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199B627 List:
References
W3F1-97-0256, W3F1-97-256, NUDOCS 9711190044
Download: ML20199B623 (2)


Text

. _ _ . ___ m .. _ _ _ . ._

k f- .

Ente gy Operations,Inc.

, 's>

Killona. LA 70006

Tel 504 739 6242 -

l W' Early C. Ewing ill to Safety & Regulatory Affans Waterford 3 W3F1-97-0256 A4.05 PR ,

November 14,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No.60-382 License No. NPF-38 L Emergency Plan Implementing Procedures

? Gentlemen:

Enclosed are the latest issues of five recently revised and two recently changed Waterford 3 Emergency Plan implementing Procedures. This submittalis being made in accordance with Appendix E of 10CFR50. These changes were reviewed in

, acccrdance with 10CFR50.54 requirements and were determined not to decrease the effectiveness of the emergency plan. .

included la this submittal are the following procedures:

i

1. EP-002-010 (Revision 26), Notifications and Communications. This revision' updates and clarifies existir.g guidance to assist in completing Notification Message Forms.

L 2. EP-002-000 (Revision 21), Radiological Field Monitoring. This revision provides guidance for selecting radiological field team members.

'3. EP-002-061 (Revision 9), Emergency Environmental Monitoring. This revision 4 is editorial in nature. It updates procedure references, organization titles and U)/

sample location descriptions.

4. EP-002-090 (Revision 6), Core Damage Assessment. This revision eliml nates the computerized method of performing core damage assessment.

\g\

r

$. vus rs .w ' G .

9711190044 97 4" llkk>!$ '

  • POR- ADOCK 0 F p g u_:

J

Emergency Plan Implementing Procedures W3F1-07-0256 Page 2

' November 14,1997

5. EP-002-130 (Revision 17), Emergency Team Assignments. This revision allows the OSC Supervisor to delegate the responsibility of reviewing and

' approving briefing sheets.

6. EP-002-050 (Revision 15, Change 1), Offsite Dose Assessment (Manual).

This change removes the reference to the Plant Stack as being the release path for emergency exhaust from the Main Condenser Evaluation System.

7. - EP-002-102 (Revision 25, Change 1), Ema.gency Operations Facility (EOF)

Activation, Operation and Deactivation. Tnis change is editorialin nature. It change - NRC position titles in the EOF and identifies phone numbers for those positions.

NOTE: EP-002-050, Revision 15, Change 1 contains changes which will be incorporated into the next revision of the Emergency Plan.

Should you have cny questions concerning these procedures, please contact J.J. Lewis, Emergency Planning Manager, at (504) 739-6624.

Very truly yours,

)

/

E,C. Ewing Director Nuclear Safety & Regulatory Affairs -

ECE/ssf Enclosures cc: -(w/ Enclosures; E.W. Merschoff, NRC Region IV (2 copies)

(w/o Enclosures)

C.P. Patel (NRC-NRR)

G.M. Good (NRC Region IV)-

J. Smith L N.S. Reynolds NRC Resident inspectors Office

!