ML20199B604

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-331/98-21 on 981214-17.No Violations Noted.Inspector Concluded That Staff Was Effective in Implementing Corrective Actions for Items Reviewed
ML20199B604
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/05/1999
From: Gardner R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20199B608 List:
References
50-331-98-21, NUDOCS 9901140001
Download: ML20199B604 (2)


See also: IR 05000331/1998021

Text

. _. _

.. .

. . .

.._.m...

_ . ._. _ _ .._ _ _ . __ _ . _ _ _._.

_ . . ._.. _ . .

January 5, 1999

,i.g.

l

Mr. John F. Franz, Jr.

Vice President, Nuclear

~Alliant Tower -

200 First Street SE -

P. O. Box 351

Cedar Rapids, IA 52406-0351

. SUBJECT:

.NRC INSPECTION REPORT NO. 50-331/98021(DRS)

.

Dear Mr. Franz:

I

On December 17,1998, the NRC completed an inspection at your Duane Arnold Energy Center.

nThe enclosed report presents the results of the inspection.

1

The purpose of the inspection was to review corrective actions for previously identified issues.

l

. The inspector concluded that your staff was effective in implementing corrective actions for the

l

items reviewed. . For some of the items reviewed, corrective actions were considered excellent.

ll

In addition, the engineering staff was knowledgeable and involved in the corrective action

process.

The inspection consisted of a selective examination of procedures and representative records,-

observations, and interviews with personnel.

In accordance with '10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Roo

We will gladly discuss any questions you have concerning this inspection.-

Sincerely,

original /s/ R. N. Gardner

. Ronald Gardner, Chief

Engineering Specialist Branch 2

Division of Reactor Safety

i.

L

Docket No.: 50-331

License No.: DPRC

I

'

Enclosure:

. Inspection Report 50-331/98021 (DRS)

.

4

l'
See Attached Distribution -

!-

{-

l

DOCUMENT NAME
G:\\DRS\\DUA98021.wpd

g

v.

.

or == e

n. me m m. w,c c c

ui .n.ceme. . r . c e .ww. u . no e.

!

~

OFFICE ^ Rill

l

Rlli

>

Rlli

l# lRlli

l

'

i

NAME-

RMendez:sd /P'h

RGardner SV

RLanksbury be%

DATE

01/5/99

1/6/99

01/r/99

01/ /99

'

'

.

OFFICIAL RECORD COPY

i' . i

W

9901140001 990105

s/

PDR

ADOCK 05000331

'

9

PDR

<

r

,

s

-+

-

-

4c

1--

-

,

,

,

_

'

.

i,-

.

J. Franz

-2-

cc w/ encl:

E. Protsch, Executive Vice President

4

Energy Delivery Alliant;

' President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

Chairperson, Iowa Utilities Board

i

Distribution:

RPC (E-Mail)

- Project Mgr., NRR w/enci

J.' Caldwell, Rlli w/ encl

C. Pederson, Rlli w/ encl

B Clayton, Rlli w/ encl

SRI Duane Arnold w/enci

. DRP w/ encl

- TSS w/enci

i

DRS (2) w/enci

Rill PRR w/enci

1

PUBLIC IE-01 w/ enc!

Docket File w/enci

GREENS

- LEO (E-Mail)

l

DOCDESK (E-Mail)

1

l

-

i

,

- T

%

,

1

J

_130106-

-

.