MONTHYEARML20199B5541997-10-0808 October 1997 EN-97-097:on 971014,notice of Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Four Violations Pertaining to Prairie Island Staff Failure to Establish IST ML20138M1871997-01-17017 January 1997 EN-97-006:on 970123,notice of Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Unreviewed Safety Question (USQ) ML20059K9631994-01-21021 January 1994 EN-94-005:on 940126,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Findings of Dept of Labor Judge That Contractor for Plant Discriminated Against Employee ML20234E3511987-09-15015 September 1987 EN-87-079:on 870918,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util.Action Based on Failure to Verify That Power Supply Breaker Resulted in Inoperability of Pump ML20211E5121986-10-17017 October 1986 EN-86-079:on 861020,order to Show Cause Why Radios or Other Electrical/Electronic Equipment Providing Background Music Should Not Be Removed,Will Be Issued.Licensee Aug 1985 Ltr Ack Radios Removed as Potential Distraction 1997-10-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19993011999-07-0202 July 1999 NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including Completed & Graded Tests) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Were Issued Licenses IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-III-99-001, on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire1999-01-0606 January 1999 PNO-III-99-001:on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-051, on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities1998-11-0202 November 1998 PNO-III-98-051:on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20154M0691998-10-0909 October 1998 Notice of Violation from Insp on 980731-0910.Violation Noted:On 980901,maint Workers Failed to Follow Procedural Requirements,Of Sp 1180.2,Rev 8,Steps 7 & 8,when Workers Did Not Gain Access to Both Sides of Filter Bank ML20154J9881998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl ML20236N9941998-07-10010 July 1998 Notice of Violation from Insp on 980605-12.Violation Noted: on 980605,emergency Operating Procedure 1ES-0.1,rev 13 Lacked Adequate Guidance for Dumping Steam Using SG Power Operated Relief Valves W/Ms Isolation Valves Closed ML20236P0111998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 Rt Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236G9011998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-032, on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil1998-06-0909 June 1998 PNO-III-98-032:on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil IR 05000282/19980071998-06-0505 June 1998 Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248M1341998-06-0505 June 1998 Notice of Violation from Insp on 980329-0511.Violation Noted:Licensee Identified & Took Corrective Actions of Concerns W/Potential Effects of Flooding from Feedwater Line Break on Ability of Main Isolation Valves to Close ML20248J4971998-06-0404 June 1998 Notice of Violation from Investigation Rept 3-97-034, Completed on 980211.Violation Noted:Suppl 2,dtd 970212,to License Amend Request,Dtd 970129, Amend of Cooling Water Sys Emergency Intake Design Basis, Was Not Complete IR 05000282/19980061998-05-26026 May 1998 Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409.No Violations Noted.Major Areas Inspected:Conduct of Operations Which Included Continuous 72 H Period of Control Room Observation ML20248B3061998-05-26026 May 1998 Notice of Violation from Insp on 980330-0409.Violation Noted:On 980401,inspectors Observed Plant Operator Hang Secure Tag Associated W/Wo 9801216 on Number 21 Safety Injection Pump Motor Control Ctr W/O Performing Dead Test IR 05000282/19980011998-05-0101 May 1998 SALP Repts 50-282/98-01 & 50-306/98-01 for 960218-980328 IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20216E4621998-03-12012 March 1998 Notice of Violation from Insp on 980114-0224.Violation Noted:On 980121,instructions in Work Order 9800310, Isolate Breaker 1H3, Were Not Appropriate to Circumstances Because Loss of Offsite Power Source to Unit 2 Occurred PNO-III-98-011A, on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld1998-02-13013 February 1998 PNO-III-98-011A:on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld ML20202C0451998-01-30030 January 1998 Notice of Violation from Insp on 971203-980113.Violation Noted:On 971210,Maint Procedure D32,Rev 6,was Not Allowed for Unit 1 When RO & Nuclear Engineer Coordinating Procedure on Two Occasions,Failed to Do Five Degree Cooldown & Heatup ML20202C0581998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support PNO-III-98-011, on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal1998-01-26026 January 1998 PNO-III-98-011:on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal ML20198A4171997-12-23023 December 1997 Notice of Violation from Insp on 970929-1003.Violations Noted:On 960724,licensee Implemented Procedure Swi O-10, Operations Manual Usage, Rev 28,section 6.11.9,which Contained Inadequate Instructions ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support 1999-09-09
[Table view] |
Text
__
October 8,1997 EN 97-097 OFFICE OF ENFORCEMENT N_pTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION LigeJatt;' Northern States Power - (EA 97-290)
Prairie Island Nuclear Generating Plant Docket Nos. 50-282, 50-306
Subject:
PROPOSED IMPOSITION OF civil PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed imposition of Civil Penalty in the amount of $50,000 will be issued on or about October 14,1997 'o Northern States Power. This action is based on e Severity Level 111 problem involving four violations pertaining to the Prairie Island staffs failure to establish an Inservice Test (IST) procedure acceptance criteria that would not compromise the auxiliary feedwater (AFW) system design basis requirements, to implement corrective actions when incorrect acceptance criteria for a safety injection pump IST procedure were identified, to analyza a discrepancy between the Updated Safety Analysis Report (USAR) and the anticipated AFW flow, and to maintain the fidelity of the USAR.
According to the Enforcament Policy, a base civil penalty for $50,000 is considered for a Severity Levelill problem occurring before November 12,1996. Because the majority of the period of
- noncomoliance occurred prior to Novernber 12,1996, a civil penalty in the amount of $50,000 is being proposed. Because this was not the first escalated enforcement action within 2 years, the staff considered whether credit was warranted for identification and corrective actk,n. The NRC determined that credit was not warranted for Identification since these violations were identified by the NRC or the plant staff identified the violation but failed to recognize the significance until prompted by the NRC. The NRC determined that credit was warranted for Corrective Actions.
i Therefore, a base civil penalty of $50,000 is being proposed for the Severity Level til problem.
it should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
Mailing of Notice October 14,1997
- Telephone Notification of Licensee October 14,1997 The State of Minnesota will be noti'ied.
The licensee has thirty days from the date of the Notice in which to respond. Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Contacts: J. Heller, Rlli, (630) 810-4374 James Lieberman, OE, 415-2741 9711190026 971006 Distribution PDR 18 E EN-97-097 PDR OWFN _ OWFN TWFN Regional Offices
-Chairman Jackson EDO OC RI RIV Comm. Dieus DEDR AEOD Ril WCFO
- Comm. Diaz DEDS OP CTR Rlli
! Comm. McGaffigan OE' NMSS SECY OGC IRM MAIL L OCA NRR OlG NUDOCS l GPA 01 RES PDR SP ACRS a i
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL p\
l VERIFICATION THAT LICENSEE HAS RECEIVED ACTION N
l ll1. l.ll.Hi.ll.ll.i X.
.