ML20199B266

From kanterella
Jump to navigation Jump to search
NRC Operator Licensing Exam Rept 50-607/OL-97-01 Including Completed & Graded Tests for Tests Adminstered on 970909-10
ML20199B266
Person / Time
Site: University of California-Davis
Issue date: 10/10/1997
From: Eresian W
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20199B241 List:
References
50-607-OL-97-01, 50-607-OL-97-1, NUDOCS 9711180257
Download: ML20199B266 (2)


Text

- - . - . . - .-. -. - - -. . ,

i U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-607/OL-97 01 FACILITY DOCKET NO.: 50-607 FACILITY LICENSE NO.: N/A FACILITY: McClellan fa .: lear Radiation Center EXAMINATION DATES: September 9 10,1997 EXAMINER: We'ren J. Erosian, lief Examiner SUBMITTED BY: 9h 4 M -- /c O!N Warren J. Eresfn, Chief Examiner, D'at's

SUMMARY

The NRC administered initiallicense examinations to five Reactor Operator applicants and eleven Senior Reactor Operator applicants. All applicants passed the examination. The examinations were conducted in anticipation of the licensing of the McClellan AFB TRIGA reactor in 1997.

l ATTACHMENT 1 9711190257 971105  !

l PDR ADOCK 05000607 y V PDR e I. - . .

y _, '9 6

2-i f EPORT DETAILS

1. Examiners:' )

Warren J. Erosian, Chief Exa niner i

2. Results:

RO SRO Total  ;

(Pass / Fall) (Pass / Fall) (Pass / Fall)  !

NRC Grading: 5/0 11/0 16/0

3. Written Examination:. ,

The written examination was waived for all applicants. The waiver was granted on the basis that each applicant passed a comprehensive written examination as part of the Air Force operator certification program.

4. Operating Test:

All applicants passed the operating test. Portions of the operating test were waived on the basis that each applicant passed an operating examination as part of the Air Force operator certification program.

5. Exit Meeting:

An exit meeting was held on September 11,1997. Present were:

Warren J. Eresian, NRC Chief Examiner Wade J. Richards, Chief, Nuclear Licensing and Operations

-The NRC thanked the McClellan Nuclear Radiation Center staff for their cooperation during the examinations. Mr. Eresian expressed some generic concerns regarding operator knowledge in the area of radiation monitosing.

W

, - . , _ . . - - . .- , - ,,,m . . ~ ~ , .m - - ,, , _ . . _ - . . - - . - , . . _ . .