Submits RGs 1.168,1.169,1.170,1.171,1.172 & 1.173 Which Provide Guidance to Licensees & Applicants on Methods Acceptable to NRC for Complying W/Nrcs Regulations for Promoting High Functional Reliability
ML20199B249
Person / Time
Issue date: 10/06/1997
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Gingrich N, Gore Al, Murphy R
GENERAL ACCOUNTING OFFICE, HOUSE OF REP., SENATE
References
RTR-REGGD-01.168, RTR-REGGD-01.169, RTR-REGGD-01.170, RTR-REGGD-01.171, RTR-REGGD-01.172, RTR-REGGD-01.173, RTR-REGGD-1.168, RTR-REGGD-1.169, RTR-REGGD-1.170, RTR-REGGD-1.171, RTR-REGGD-1.172, RTR-REGGD-1.173 CCS, NUDOCS 9711180254
Download: ML20199B249 (3)


Text

-

ku $1Y l9 yaa%,,'k g

UNITED STATES g

g

{

NUCLEAR REGULATORY COMMISSION t

WASHINoToN, D.C. 30866-0001 p%...../

October 6, 1997 The Honorable Al Gore President of the United States Senate Washington, DC 20510

Dear Mr. President:

Pursuant to Subtitle E of the Small Business Regulatory Enforcement Fairness Act of 1996, 5 U.S.C. 801, the Nuclear Regulatory Commission (NRC)is submitting Reg.ilatory Guide 1.168," Verification, Validation, Reviews, and Audits for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.169," Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Pisnts"; Regulatory Guide 1.170," Software Test Documen-tation for Digital Computer Sof tware Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.171,"Sof tware Unit Testing for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.172, " Software Requirements Specifications for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; and Regulatoiy Guide 1.173," Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants."

These new regulatory guides provide guidance to licensees and applicants on methods acceptable to the NRC staff for complying with the NRC's regulations for promoting high functival reliability and design quality in software used in safety systems of nuclear power plants.

We have determined that these regulatory guides are not " major rules" as defined in 5 U.S.C. 804(2). We have confirmed this determination with the Office of Management and Budget.

Enclosed is a copy of the guides, which will be distributed to affected licensees and other interested parties.

Sincerely, h*

[(NW 9711100254 971006 PDR REGGD Dennis K. Rathbun, Director 01.168 C PDR Office of Congressional Affairs

Enclosures:

l Regulatory Guides 1.168,1.169, 1.170,1.171,1.172,1.173 Regulatory Analysis l(&

CONGRESSIONAL CORRESPONDENCE SYSTEM DOCUMENT PREPARATION CHECEIST T,his check list is to be submitted with each docwnent (or group of Qs/As) sentforprocessing into the CG W

1. BRIEF DESCRIPTION OF DOCUMENT (S)

A.

6 n.

2. TYPE OF DOCUMENT X CORRESPONDENCE RE4 RINGS (QHAs)
3. DOCUMENT CONTROL _ SENSITIVE (NRC ONLY) X NON-SENSITIVE
4. CONGbESSIONAL COMMITIEE AND SUBCOMMTITEE (if applicable)

Congressional Comminee Subcommittee S. SUBIECT CODES (A)

(B)

(C)

6. SOURG OFDOCUMENTS (A) 5520 (DOCUMENT NAME

)

(B)

_ SC4N (C)

ATTAWMENTS (D)

OTHER

7. SYSTEhf LQG DATES (A) /,//13197 DATA OC4 SENTDOCUMENT TO CCS (B)

DATE CCS REGIVED DOCUMENT (C)

DATE RETURNED TO OC4 FOR ADDITIONAL INFORMATION (D)

DATE RESUBMIDED BY OC4 TO CCS (E)

DATE ENTERED INTO CCS BY (F)

DATE OC4 NOTIFIED THATDOCUMENT IS IN CCS COMMENTS:

RELEASE TO PDR

@O1 i

l

_____.___m_

- - ~ - - - - - - - - - - - - - - - - - - - - " - -

f~.g%

UNITED STATES g*

g j

NUCLEAR REGUL.ATORY COMMISSION t

WASHINGTON, D.C. SMeHOM

,/

October 6, 1997 The Honorable Newt Gingrich Speaker of the United States

- House of Representatives Washington, DC 20515

Dear Mr. Speaker:

Pursuant to Subtitle E of the Small Business Regulatory Enforcement Fairness Act of 1996, 5 U.S.C. 801, the Nuclear Regulatory Commission (NRC)is submitting Regulatory Guide 1.168," Verification, Validation, Reviews, and Audits for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.169," Configuration Management Plans for Digital Computer Software Used in Safety Systems c,f Nuclear Power Plants"; Regulatory Guide 1.170," Software Test Documentation for Digital Computer Software Used b Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.171," Software U.eit Testing for Digital Computer Software Used in Safety Systems of i

Nuclear Power Plants"; Regulatory Guide 1.i 72, " Software Requirements Specifications for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; and Regulatory Guide 1.173," Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants."

These new regulatory guides provide guidance to licensees and applicants on methods acceptable to the NRC staff for complying with the NRC's regulations for promoting high functional reliability and design quality in software used in safety systems of nuclear power plants.

We have determined that these regulatory guides are not " major rules" a:: defined in 5 U.S.C. 804(2). We have confirmed this determination with the Office of Management and Budget.

Enclosed is a copy of the guides, which will be distributed to affected licensees and other interested parties.

Sincerely,

-l &

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosures:

Regulatory Guides 1.168,1.169, 1.170,1.171,1,172,1.173 Regulatory Analysis

1 e nee f

UNITED STATES

[P

,' j NUCLEAR REGULATORY COMMISSION

)

WASHINGTON, D.C. 30006 0001 October 6, 1997

,,g, Mr. Robert P. Murphy General Counsel General Accounting Office, Room 7175 441 G Street, NW.

- Washington, DC 20548

Dear Mr. Murphy:

Pursuant to Subtitle E of the Small Business Regulatory Enforcement Fairness Act of 1996, 5 U.S.C. 801, the Nuclear Regulatory Commission (NRC) is submitting Regulatory Guide 1.168," Verification, Validation, Reviews, and Audits for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.169," Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.170, " Software Test Documen-tation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.171," Software Unit Testing for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Regulatory Guide 1.172," Software Requirements Specifications for Digital Compute.- Software Used in Safety Systems of Nuclear Power Plants"; and Regulatory Guide 1.173," Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants."

These new regulatory guides provide guidance to licensees and applicants an methods acceptable to the NRC staff for complying with the NRC's regulations for promoting high functional reliability and design quality in software used in safety systems of nuclear power plants.

We have determined that these regulatory guides are not " major rules" as defined in 5 U.S.C. 804(2). We have confirmed this determination with the Office of Management and Budget.

Enclosed is a copy of the guides, which will be distributed to affected licensees and other interested parties.

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosures:

Regulatory Guides 1.168,1.169, 1.170,1,171,1.172,1.173 Regulatory Analysis

__