l' 1
/g>m noeu,*o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION 8
([ -
REGION itt 3
801 WARRENVILLE ROAD LISLE. ILLINOIS 605324351 January 16,'1998 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Conipany ATTN: Regulatory Services Executive Towers West lll 1400 Opus Place, Suite 500 Downers Grove,IL 60515
Dear Mr. Kingsley:
This refers to the meeting conducted at the Region ill office of the Nuclear Regulatory Commission (NRC) in Lisle, Illinois, on December 10,1997. This meeting was to discuss the status of your actions to improve fire protection at Quad Cities Station with regards to the requirements of 10 CFR Part 50, Appendix R.
During this meeting, you were unable to demonstrate that the current safe shutdown analysis and pmcedures were adequately reviewed, validated, and approved to assure that a design basis fire in any plant area will not prevent the performance of necessary safe shutdown functions.
Subsequently, you shut down Unit 1, the remaining operating unit, to further evaluate corrective actions to be taken.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
We appreciate your cooperation in this matter, if you have any questions regarding this meeting, please contact me at 630/829-9700.
Sincerely, John A. Grobe, Director Division of Reactor Safety Docket Nos. 50-254; 50 265 License Nos. DPR 29; DPR 30
Enclosures:
1.
List of Attendees
- 2.
Licensee Presentation Slides See Attached Distriteution 11 9801280207 900116
/
PDR ADOCK 05000254 F
- fkJ R&h
3
~-
e r
O. Kingsley 2-1 oc w/encis:
M. Wallace, Nuclear Services i
Senior Vice Pres! dent
- G. Stanley, PWR Vice President J. Perry, BWR Vice Pre 6ident 2
D. Farrar, Regulatory i
Services Manager
- l. Johnson, Licensing Director DCD Licensing i
E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard i
Nathan Schloss, Economist Omco of the Attomey General 1
State Liaison Officer.
Chairman, Illinois Commerce i
Commission
- W. D. Leech, Manager of Nuclear -
i MidAmerican Energy Company I
i 4
i 2,
I A
t January 16, 1998 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Comoany ATTN: Regulatory Geivices Executive Towers West lll 1400 Opus Piace, Suite 500 Downers Grove,IL 60515
Dear Mr. Kingsley:
This refers to the meeting conducted at the Region ill office of the Nuclear Regulatory Commission (NRC) in Lisle, Illinois, on December 19,1997. This meetir,g was to diser i the h
status of youi actions to improve fire protection at Quaa Cities Station with rene-P
}
rerjuirements of 10 CFR Pa:150, Appendix R.
During this meeting, you were taable to demonstrate that v current st -
. onalysis and precedures were adequately reviewed, validated, and ar.-
ed to assut
. a oesign basis fire in any plant area will not prevent the performance of net.s sary safe shutdown functions.
m Subsequently, you shut down Unit 1, the remaining operating unit, to further evaluate corrective act;ons to be taken
=
In cccordance with Section 2.790 of the NRC'r " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
u, We appreciate your cooperation in this matter. If you have any questions regarding this meeting, please contact me at 630/829-9700.
Sincarely,
/s John A. Grobe John A. Grobe, Director Oivision of Reactor Safety k
Docket Nos. 50-256;50-265 License Nos. DPR-29; DPR-30
.s
Enclosures:
1.
List of Attendees 2.
Licensee Presentation Slides See Attached Distribution DOCUMENT NAMid: G:\\ QUAD \\QUr.12197. SUM To receive e copy of this document, Indicay :-* box 'C" = repy without attach! net *E* = Cspy with attach /enct *N* = No copy OFFICE _
Rlli,a)
C Rlli M
Rill N
NAME MRing p RGardner k JGrob DATE 01//6/08
_01/'s is8 01/l 8
3FFICMt. RECORC COPY V
O.'Kingsley -
.-2
. cc w/ enc s:
M. Wallace, Nuclear Servicet Senior Vice President -
G. Stanley, PWR Vice President J. Perry, BWR Vice President
- D. Farrar, Regulatory
< Services Manager
- 1. Johnson, Licensing Director DCD - Licensing E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard Nathan Schloss, Economist Office of the Attomey General State Liaison Officer Chairman, ll!inois Cominerce Commission W. D. Leech, Manager of Nuclear MidAmericait Energy Company Distribution:
Docket File w/enets DRP w/encls PUBLIC IE-01 w!encls TSS w/encls A.' Beach w/encls DRS (2) w/encls Deputy RA wiencls Rill PRR w/encls
' Rlli Enf._ Coord. wiencls RAC1 (E-Mail)
SRI Quad Cities w/encls CAA1 (E-Mail).
- Project Mgr., NRR w/encls COCDESK (E-Mail) f M
s-t J
9 QUAD CITIES APPENDIX R STATUS MEETING IN REGION lli 0ECEMBER 19.1997 LIST OF ATTENDEES
/
Nuclear Reaulatory Commission A. Bill Beach, Ra;,lonal Administrator, Region lil Robert Capra, Project Director, NRR Robert Pulsifer, Project Manager, NRR Tad Marsh, Chief, Plant Systems Branch, NRR Geoffrey E. Grant, Director, Division of Reactor Projects, Region ill John A. Grobe, Director, Division of Reactor Safety, Region ill Mark Ring, Chief, Projects Branch 1, Region lli Ronald N. Gardncr, Chief Enginetting Specialists 2, Region 111 Christopher Miller, Senior Resident inspector, Quad Cities Doris Chyu, Reactor Engineer, Region ll1 An ela Greenman, Public Affair Officer, Region 111 w
Jan Strasma, Public Affair Officer, Region 111 Commonwealth Edison (Comed) l E. S. Kraft, Jr., Comed BWR Vice-President L. W, Pcarce, Comed Site Vice-President John Hosmer, Comed Engineering Vice-President Frank Spangenberg, Comed Regulatory Assurance Manager-Dresden D. B. Cook, Comed Plant Manger Charles Peterson, Comed Regulatory Affairs Fred Chevalier, Comed Work Control R. V. Fairbank, Comed Acting Site Engineering Manager J. R. Garrity, Comed Engineering Stan Chingo, Comed Corp. Fire Protection T, B. Thorsell, Comed NES Electrical Chief Engir ser J. A. Brownell, Comed Engineering J. Mastertank, Comed Engineering Douglac Britz. Comed Engineering Greg Tice, Comed Enginec ing Eric Bep'amont, Comed NFS Englieering Nick Ficravante, TMCS, Inc., Consultant David C. Tuobs, MidAmerican Enargy Ron Kirven, S & L. Engineering Mark Wagner, Comed Licensing Tom Peterson, Comed - Regulatory Assurance Bob Rybok, Comed Licensing Roger Gavankar, Comed Chief Mechanical Engineer Robert Tsai, Comed Nuclear Fuel Services Don Roberty, Comed MISE FPE Delfo Bianchini. Sargent & Lundy m
A
.m.
y e
Quad Cities Appendix R Status December 19,1997 1
l.
Agenda Meeting Purpose and Overview (L. W. Fearce)
Background - Unit 1 ISS M (R. Fairbank)
Operaaility Evaluation (D. Cook)
Disposition of Recent Unit 1 SSD PIFs (D. Cook)
Deve. opment/ Review Proce.ss - Unit 1 (J. Garrity) l Dual Unit Operation (B. Fairbank)
)
l Closing Remarks (L. W. Pearce) 2 l
Meeting Purpose Main Purpose Today is to Discuss Status of our Efforts to Improve Fire Protection at Quad Cities
- Safe Continued Operations ofUnit 1
- Safe Restart of Unit 2
- We Recognize We are not in Full Compliance j
with Fire Protection Requirements
- Long Term Efforts to Reduce CDF 3
M Overview Reduced Risk e
- Improved IPEEE
- Steady decline in risk Improved Procedures
- Simpler methods
- Flowcharts
- Operator Feedback
- Recent Issues (PIFs) 4
Overview (Cont.)
Improved Operator Knowledge
- From 8 to 4 Procedures per unit
- Same methodology More Unitized Strategy 1
- Utilizes equipment from affected unit
- Example: U-2 diesel OOS First time equipment available for operating unit with diesel OOS 5
u----
Overview (Cont.)
- Lnit 2 Restart
- Strategy Incorporates the Simplified (4 procedure / unit) SSD Methodology Addresses the Significant Issues Long-Term - Continue to Review Entire SSA
-Issue Resolution
- Continued XRC Communications-
- Consider Operation of Unit 2 As a Single Unit l
6
e o
es Background - Unit 1 ISSM (Improved Safe Shutdown Methodology)
Station Responded Conservatively to Appendix R Safe Shutdown Analysis Concerns Original Safe Shutdown Analysis Had Weaknesses That Went Uncorrected
~
Program was Subject to Enforcement in 1988 and 1993 September 26,1997 Identified un Apparent Major Problem (lack ofload shedding)
Prompt Conservative Action was Taken
- All Safe Shutdown Paths Were Declared Inoperable
- Voluntary Unit 2 Shutdown on September 27,1997 7
00 Background - Unit 1 ISSM Station Engineers' Thor (ough Review)of Sa Cont.
Analysis Led to Simplified Approach (ISSM) l Rigorous Detailed Review of Original Analysis Revealed More l
Issues
- Mal Operations - EDG
- Spurious Operations - 125VDC October 24,1997, Decided To Revise SSD Approach
- Simplified Paths
- Eliminated Many Previous Issues
- Reduces Risk Multi-Disciplined Project Team Pursued Parallel Paths With Completion Expected Before End of 67-Day ATR 8
i J
1 Unit 1 Estimated CDFs Both Units Operating 1.0E-02 e:
g 15 E
m S
1 l
g 1.0E-03 g
e u-oa e
m Q
g oo 1.0E-04 1
I I
iPEEE With IASM SSDPs New SSDPs Unavailabio in Place f
a
i Background - Unit 1 ISSM (Cont.)
ISS M Approach Required More Time Than Expected November 25,1997 - Concern that the 67 Day ATR May Not be Achievable Explored Options Opted for GL 91-18 Operability Evaluation GL 9 -18 Logic Was Applied l
10 u______
Background - Lnit 1 ISSM (Cont.)
Basis of Operability Was Focused on Safety
- Safe Shutdown Analysis
- Safe Shutdown Procedures 1
- Safe Shutdown Walk.tbrough
- Technical Reviews a11d Issue Resolution 11
Background - Unit 1 ISSM (Cont.)
Operability Evaluation Was Prepared By Multi-Disciplined Engineering Team Approved By Engineering Management Oversight By Corporate Engineering Management Rigorous PORC Reviews 12
Background - Unit 1 ISSM (Cont.)
Operability is Factored Into Our Ongoing l
Activities l
- Final Safe Shutdown Analysis
- Appendix R Reviews
- Issue Identification and Operability Evaluations
- Third Party Independent Review of PIFs
- Issue Resolution 13
Operability Evaluation ATR Strategy
- Initial Goal-Ful: Compliance
- GL 91-18 Guidance Applied 3
- Extensive Review
- Challenged Safety Impact
- Conclusion 14
Disposition of Recent Unit 1 SSD PIFs 15 PIFs Generated Since Exiting ATR Implementation Process Documentation Proce'dures 1 - Under Review Minimal Safety Signif:'ance 15
Unit 1 ISSM Development / Review Process Flowchart for Safe Shutdown Analysis 16
~
E w T sg 1.
UNIT 1(2) (1/2)
ATYACHMENT E (Pcge 1 of 1) a wIcron 1 QUAD CITIES FPR UPDATE FROCESS FLOWCHA3T CIGINATIIM IF CHMGE
-Oriainator
-identify Potential Fire Concern
- Preoare FPR Chanet Requett Packaos FPk Revision Coordtea$or
-Log FPR Change Request
' TECMi! CAL REVIEW 5
-Fire Protection $ystem (noineer
-Appendtv R fnoineer
-FPR Revisten Coordinator
-Uposte FPR Change Package Log IRC50LUi!ON OF TECHNICAL CONCERN $
-Oct oi na t or
-9
,FPR Revtsten Coordinator
-Coorcinate Resolution of Technical Coments with Originator if Required
-Update FPR Change Package Log REVIEV AND AP 1 0 VAL OF CHANGE
-$vstem rn-i.eertro Supervisor
--- " --*- 9 e
-FPR Revision Coordinator
-Coorcinate Resolution of Technical Coments with Originator if Required
-Cancel FPR. Change Package if Required
-Update FPR Change Package Log APPRCVAL AND 4.UTHORIZATION OF CNulGC s
4
-Station Manaoer I
e
,.._L.'-...:...,
eCANCELLATION e
l-FRPRevistenCoordinator j
u
..y.
a j
-FPR Rev'ston Coordinator
-Cancel FPR Change Pachge if Required
-Update FPR Change Package Log
-Prepare an FPR Update Package IIKZlRPORATION Itic FPR
- 0ffice tueerviser IIMSERTION INTO CONTROLLED BOOKS FPe Molders FPR Revistorfoordinator Update FPR C.tange Package Log i
Propere NRC SJlntittn, cs
,-1r NOTIFICATION j
.dAR Cecedinator (final) 19
. ------ - J
- e Dual Unit Operation Revised Safe Shutdown Analysis Safe Shutdown Procedures / Operability Evaluation Issue Scope Document and Acceptance Criteria Develop First Drail Review 1987 SSA (S&L)
Reconcile with SSA Revise SSA Commence Operability Evaluation Accept SSA Review / Accept Procedures Perform 50.59 Confirm Compensatory Perform On-Site Review Measures / Revise Procedures Perform 50.59 on Procedures Perform On-Site Review Complete Operability Evaluation PORC Review of SSA, Procedures, and Operability Evaluation Site Vice President Approval Unit Startup Approved 18
i 0
g x
C4 C
E zO AO e
-