Advises of Planned Insp Effort Resulting from Plant Performance Review on 971021.Provides Details for Insp Plan for Next Six Months.Resident Insps Not Listed Due to Ongoing & Continuous Nature
ML20199B203
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/20/1998
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
NUDOCS 9801280202
Download: ML20199B203 (5)


Text

-.. _. - - -. ---

  1. p o na49'o, NUCLEAR REGlJLATORY COMMISSION t

UNITED STATES 8

g REGION lli W

g 801 WARRENvlLL4 nOAD LISLE. ILLINOIS 60532-4351 k*****,/

January 20, 1998 Mr. Oliver D. Kingsley 1

President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West lil 1400 Opus Piece, Suite 500 Downers Grove, IL 60515

SUBJECT:

PLANT PERFORMANCE REVIF.W (PPR)- QUAD CITIES STATION

Dear Mr. Kingsley:

On October 21,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Quad Cities Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Quad Cities Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 through September 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior managament meeting (SMM) reviews. The results of the PPR for Quad Cities determined that the station has been dealing with significant issues with fire protection and implementation of the maintenance rule, and had difficulty in properly resolving issues with Appendix G testing and emergency diesel generator air start motors, in addition, the initial deliberations of SALP 14 were considered in the inspection planning.

This letter advises you of eJr planned inspection effort resulting from the Quad Cities PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arriv:1 onsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

9801280202 900120

\\

PDR ADOCK 0500 4

G

~

.i.

fk.fff.)

180047 A8ut Jim

._ ~___-

O. Kingsley We wiu inform you of any changes to the inspection plan. If you have any questions, please conmet me at (630) 829-9703.

Sincerely,

]

Mark Ring, Chief Reactor Projects Branch 1 Docket Nos. 50-254,50-265 Uconse Nos. OPR-29, DPR-30

Enclosure:

Inspection Plan cc w/ encl:

M. Wallace, Nuclear Services Senior Vice President G. Stanley, PWR Vice President J, Perry, BWR Vice President D. Farrar, Regulatory Services Manager

1. Johnson, Ucensing Director DCD - Ucensing E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manage.;

Richard Hubbard Nathan Schloss, Economist Office of the Attomey General State Ualson Officer Chairman, ;llinois Commerce Commission W. D. Leech, Manager of Nuclear MidAn,erican Energy Company 5

f O. Kingsley 02-We win inform you of any changes to the inspection plan. If you hav3 any questions, please contact me at (630) 829-9703.

Sincerely,

/s Mark A. Ring Mark Ring, Chief Reactor Projects Branch 1 Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30

Enclosure:

Inspection Plan cc w/ encl:

M. Wallace, Nuclear Services Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager I. Johnson, Licensing Director DCD - Licensing E. Kraft, Jr., Site Vice President D. Cook, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard Nathan Schloss, Economist Office of the Attomey General State Liaison Officer Chairman, Illinois Commerce Commission W. D. Loech, Manager of Nuclear MidAmerican Energy Company f

DOCUMENT NAME: G:\\ QUAD \\lNSPPLNS.QUA 1.

,w

%..u w.c. con

.e -

r.c

.,=,

r

. m.

4 OFFICE Rlil 0l Rill _ i h, l6 Rill l6 Rlli lE Rill lk NAME Lerch/co Me CrheW ## Shear %

Gardner M/

Gavulah DATE 01/n/98 dt @ 01/f/98 //nh01/N/98 01/D/98 01/N98'h OFFICE Rill N

Rlli 6

NAME Lougheed RingW DATE 01/l%/98 01/t c/98 OFFICIAL RECORD COPY

. ~ _ _ -. - - _ -. -. -

E. Kran 3

Distribution' Docket File w/enci DRP w/end PUBUC IE-01 w/enci TSS w/onci A. Beach w/enci DRS (2) w/end Deputy RA w/ encl Rlli PRR w/enci Rill Enf. Coord. w/ encl RAC1 (E-Mail)

SRI Quad Cities w/enci CAA1 (E-Mail)

Project Mgr., NRR w/enci DOCDESK (E-Mall) 4 4

Enclosure QUAD CITIES i

INSPECTION / ACTIVITY PLAN IP - Inspection Procedure Tl - Temporary Instruction

'I Core Inspection - Minimum NRC Inspection Program (mandatory all plants) i INSPECTION /

TITLE /

NUMBER OF PLANNED TYPE OF INSPECTION /ACTMTY-ACTIVITY PROGRAM AREA NRC DATES COMMENTS INSPECTORS /

INDIVIDUALS IP 83750 Radiation Protection /

2 1/12-16/98 Core inspection and Followup on l

Plant Support Previously identified Weaknesses j

IP 81700 Security /

1 2/2-6/98 Core inspection and Followup on i

Plant Support Previously identified Weaknesses IP 93801 Design Inspection (AE Team) 6 Onsite:

Core inspection and Review of the 2/16-27/98 Plant Conformance to the Design i

3/16-27/98 Basis.

IP 83750 Radiation Protection /

1 4/13-16/98 Core inspection and Followup on Plant Support Previously identified Weaknesses IP 92902 Maintenance Rule 2

4/20-23/98 Followup on Maintenance Rule

[

Inspection IP 64704 Fire Protection Inspection 3-4 TBD Regional Initiative to Verify Fire Protection Readiness for Restart Ti 2515/137 Circuit Breakers 1-2 TBD Special Inspection IP 64704 Fire Protection 1

in Progress LER Re new (IR 97023)