c s-November 6,1997 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Techno;ogy Division Westinghouse Electric Corporation'-

P.O. Box 355 Pittsburgh, PA - 15230

SUBJECT:

AP600 INSPECTIONS, TESTS, ANALYSES, AND ACCEPTANCE CRITERIA

Dear Mr. Liparulo:

The enclosure to this letter contains requests for additional information (RAls) or corrections conceming Revision 3 of the P600 Tier 1 information including the inspections, tests, analyses, and acceptance criteria (ITAAC). If you have any questions regarding this matter, you may phone me at (301) 415-3145.

Sincerely, original signed by:

Jerry N. Wilson, Senior Policy Analyst Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Dock 9t No.52-003

Enclosure:

As stated cc w/en.: See next page n\\

DISTRIBUTION:

",, 0 3 l'i Docket File PDST R/F JRoe PUBLIC DMatthews TQuay JNWilson TKenyon BHuffman DScaletti ACRS (11)

TCheng,0 7 H15 WDean, O-5 E23 JMoore,0-15 B18 DThatcher,0-7 E4 GThomas,0-8 E23 MChiramal,0-8 H3 REmch,0-10 D4 HWalker,0-3 D1 JBongarra,0-9 H15 JPeralta,0-9 A1 MSnodderly,0-8 H7 DTerso,0-7 E23 HBrammer, 0-7. H15 DOCUMENT NAME: A:\\ECGB4 PIP.JNW To receive a copy cf this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with cttachment/ enclosure "N" = No copy-OFFICE.

PA:PDST:DRPM l D:PDST:DRPM I l

l l

NAME JNWilson:sg /<fd TRQuay 17!h DATE 11/ e/97 I!

11/1,/97 OFFICIAL RECORD COPY 9711190214 971'106 E

P = o5=vu3 ll H. lil.ll,Ill,11ll Nf!C RLE CENTER e_my.

e

  1. _.u._.u _m.a_.
u. u 2
z -

- - - ~ - - - - -

9

.e

=

Mr. B. A. McIntyre Mr. Russ Bell Advanced Plant Safety & Licensing Senior Project Manager, Programs.

Westinghouse Electric Corporation Nuclear Energy institute Energy Systems Business Unit-17761 Street, NW-P.O. Box 355' Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Ms. Cindy L. Haag Ms. Lynn Connr Advanced Plant Safety & Licensing Doc-Search Assx.istes Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks -

GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC-754 NE-50 San Jose, CA 95125 19901 Germantown Road Idaho Falls,ID 83415 Germantown, MD 20874 Mr. Robert H. Buchholz Mr. Frank A. Ross GE Nuclear Energy U.S. Department of Energy, NE-42 175 Curtner Avenue, MC-781 Office of LWR Safety and Technology San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Barton Z. Cowan, Esq.

Eckert Seamans Cherin & Mellott Mr. Charles Thompson, Nuclear Er.gineer 600 Grant Street 42nd Floor AP600 Certification Pittsburgh, PA 15219 NE 50 19901 Germantown Road Mr. Ed Rodwell, Manager Germartown, MD 20874-PWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303

=

w e.

9

y-l

+

.s.

n RAls for AP600 ITAAC I

$40.162 2.7.1 - Nuclear Island Nonradioactive Ventilation System -

As a result of the changes to the Main Control Room design, identified in your letter dated October 21,1997, the Tier 1 information and ITAAC should be revised as follows:

a.

A new table similar to CDM Table 2.1.2 2, should be added to identify all of the new safety-related lines.

b.

In CDM Table 2.7.13, ITAAC for this new piping should be included.

c.

CDM Figure 2.7.1 1 should be further revised to identify the ASME Class and the classification interfaces of all the new piping and valves.

640.163 The wording for the functional arrangemoni inspection for buildings and systems shoud be revised as follows. "The functional arrangement of the (building or system) is desuibed in Section 640.104 AP600 is a passive plant and natural circulation is a key feature of the plant. The piping lay-out of the passive systems is critical to the proper operation of the passive system. We understand the detailed piping lay-out of several systems are already finalized including the pipe stress analysis. Confirm that piping slope and elevation are specified in 'he ITAAC to verify that the passive systems will function us designed. Systems flow resistance and nozzle elevations given in the ITAAC are not sufficient to verify the system function.

640.165 For several systems, including non safety systems, the staff specified many require-monts in the initial Testing Plan (ITP). For those systems for which ITP tests will be used to satisfy ITAAC r3quirements, confam that the significant features of the ITP plan are included in the ITAAC.

O h