Jantury 21, 1998-
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place. Suite 500
Downers Grove,IL 60515
SUBJECT:
NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS
50-454/98002(DRS); 50-455/98002(DRS)
Dear Mr. Kingsley:
On January 9,1998, the NRC completed an inspection of your emergency preparedness
program at the Byron Generating Station, Units 1 and 2. The enclosed report presents the
results of thatinspection.
Areas examined within your emergency preparedness program are identified in the report.
Within those areas, the inspection consisted of a selective examination of procedures and
representative records, interviews with personnel, and observation of activities in progress. The
objective of the inspection effort was to determine whether activities authorized by the license
were conducted safely and in accordance with NRC requirements.
Based in the results of this inspection, no violations of NRC requirements were identified.
During this inspection our evaluation of your activities showed the emergency preparedness
program to be effectively implemented. In particular, the emergency response facilitics,
equipment, and supplies had been very weli maintained, management support to the program
was strong, and interv' awed key emergency response personnel demonstrated competent
knowledge of responsibilities and emergency procedures.
1
.
/ >
ll ll 10lllllli.lll
-
-
ginggDR
..
.
.
.
,,
'e.
,
_
g
lhth
.
r 9
-
.,
e
p.
y .
-m
-- - ..-
__
- _ _ -
- _ _
_ _.
._.
.
-
.
.
I
O. D. Kingsley
2
January 21, 1998
k
in accordance with 10 CFR 2.790 of the NRC's * Rules of Practice ' a copy of this letter and
enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
f
Original Signed by J. A. Crebe
John A. Grobe, Director
Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF 66
Enclosure:
Inspection Reports 50-454/98002(DRS); 50-455/98002(DRS)
cc w/ encl:
M. Wallace, Nuclear Services
Senior Vice President
,
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing
K. Graesser, Site Vice President
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Llaison Officer
State Liaison Officer, Wisconsin
'
Chairman, Illinois Commerce -
Commission
Distribution
Docket File w/enci
Rlli PRR w/ encl
Rill Enf. Coordinator w/enci
PUBLIC IE-35 w/ encl
SRI, Byron w/ encl
TSS w/enci
-
LPM, NRR w/enci
J. L. Caldwell, Rill w/ encl
R. A. Capra, NRR wienci
DRP w/ encl
A. B. Beach, Rlli w/ encl
DOCDESK w/ encl
DRS w/enci
CAA1 w/enci
DOCUMENT NAME:: G:DRS\\BYR98002.DRS
t.
.
n,
,,o
we.cm *
r eu,a w - v iemy
,
OFFICE
Rill
. f
RHQ{ )
W
Ritt
m/
C.
Rlll
fo
NAME
JFoster/JDil4/-
'JCg@d
MJordanZ
JGro6mW
DATE
01/,Zy98
01( h/98
01/10 /96
01/ 3.l/98
OFFICIAL RECORD COPY
.
..
-.
. _
.