ML20198T242
| ML20198T242 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/06/1997 |
| From: | Hughey W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 50-416-97-05, 50-416-97-5, GNRO-97-00108, GNRO-97-108, NUDOCS 9711140237 | |
| Download: ML20198T242 (2) | |
Text
e-J Entergy Operations,Inc.
)*
h [OfhV.
RO. Box 760 Port Gitason. MS 39150 Tel 001437-6470 W.K.Hughey own f411tw $#ety & Ik91 Mary A*ars Noveraber 6,1997 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Completion Date Revised in Response to Notice of Violation (GNRO-97/00059) Report No. 50-416/97-05 GNRO-97/00108 Gentlemen:
Entergy Operation's response to Notice of Violation 50-416/G7-05-03, item IV.4 & 5, stated that we would perform a thorough evaluation of the fuel pool decay heat load calculations and heat removal capabilities considering projected batch sizes, outage duration, and operating cycle lengths and revise the FSAR to clarify the licensing / design basis.
In response to Notice of Violation 50-416/97-05-06, item IV.3.a, we further stated 'the requirements for the FPCC system will be clearly determined and consistently applied to all system components required for system operation".
The above commitments were scheduled to be completed by October 31,1997. During the engineering work in support of the violation responses, the scope of activities was expanded to include an extensive rewrite of the applicable FSAR sections. A revision of the committed response date from October 31,1997 to December 31,1997 is necessary in order to comotete engineering work and ensure the quality of the revised sections of the /M FSAR.
g 9711140237 971106 Nibh kkh.flfllfl PDR ADOCK 03000416 e-POR
\\
V.
- ' ' L bNRO-97/00108 Page 2 of 2
^
This extension was previously discussed with Linda Smith, NRC in a recent teleconference.
Shou!d you have any questions, please contact Mr. R. W. Byrd at 601-437-6550 or -
Mr. C. A. Bottemiller at 601-437-6299.
Yours truly,
-R&
WKH/WBAlams cc:
Ms. J. L. D_ixon Herrity, GGNS Senior Resident Mr. L. J. Smith (Wise Carter)
Mr. N. S. Reynolds Mr. H. L. Thomas s
Mr. E. W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Reg'on IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2)
Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.- 20565 G9711051-l
!