See also: IR 05000285/1997018
Text
_
. -
,_m
_ _ _
.m.
. _ ,.
m___.
_ _ _ _ __ . . ~
.
,
a
4
f
UNITf o STAf tS -
j
g* *'% y
'
- f.
-
.%
NUCLEAR REGULATORY COMMISSION
REOloN IV
'
$'N
8
611 RY AN PL AZA oRivi, $UITE 400
,
.8
ARLINGTON, T f xAS 760118064
ta 10 SER
1
?
<
S. K. Gambhir, Division Manager
,
Engineering & Operations Stpport
i
- Omaha Public Power District
.
,
Fort Calhoun Station FC 2 4 Adm.
.
P.O. Box 399
Hwy 75 North of Fort Calhoun
l
Fort Calhoun, Nebraska 68023 0399
'
SUBJECT: NRC INSPECTION REPORT 50-285/9718 AND NOTICE OF VIOLATION
J
i
Dear Mr. Gambhlt:
d
i
An NRC inspection was conducted September 14 through October 25,1997, at your Fort
"
Calhoun Station reactor facility. The enclosed report presents the scope and resu ts of that
'
inspection.
t
During the 6 week period covered by this inspection, your conduct of activities at the Fort
I
'
Calhoun Station was generally characterized by safety conscious operations, sound
'
engineering and maintenance practices, and careful radiological controls However, one
cited violation of NRC requirements was identified. The violation involved a failure to
evaluate and properly authorize deferral of preventive maintenance.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
-
surrounding the violation are described in detailin the enclosed report. Please note that
>
'
you are required to respond to this letter and should follow the instructions specified in the
'
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
[
ln accordance with 10 CFR 2.790 of the NRC's "Rulou of Practice," a copy of this letter,
f
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
'
To the extent possible, your response should not irtclude ony personal privacy, proprietary,
or safeguards information.so that it can be placed in the PDH without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
!
them with you.
Sincerely,
,
,
.**
3
William D. Johnson, Chief
.
Project Branch E._
Division of Reactor Projects
t
-
~
i
.
0
5
,
,
s.
.
. - -
-
.
-.
- - -
.
.
~
^
..
_
..
_
_.
. __
_
.
.
Omaha Public Power Districi
-2-
Docket No.: 50-285
License No.: DPR 40
Enclosurea:
2. NRC InspectNn Report
50-285/97 18
cc w/ enclosures:
James W. Tills, Manager
Nuclear Licensing
Omaha Public Power District
'
Fort Calhoun Station FC 2-4 Adm.
P.O. Box 399
Hwy. 75 North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Perry D. Rouinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005 3502
Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509 5007
,
- , , - - . . . .
,
.
.
Omaha Public Power District
3-
NOV l 0197;i
E Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
DRS PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Residera inspector
DOCUMENT NAME: R:\\_FCS\\FC718RP.WCW
To receive copy of document ind6catejn boa: "C" = Copy wahout enclosures
"E" * Copy wth enclosures "N" * No copy-
RIV: SRI:DRP/f[ /M
R1
(/fn
CiDRP/B [/
WCWalker:njp/
VGG@y
WDJohn66n
11/ jo /97
11/ 0 /97
11/ go /97
OTTTCIAL RECORD CDPY
~
. - -
-
-.?
.
Omaha Public Power District
-3-
NOV I 01997
E Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E Mail repoit to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_FCS\\FC718RP.WCW
- To rec.h. copy or document, indicat.An bon: c = copy woout enciowes y = copy with enclosures
N" = No copy -
!
RIV:SRl:DRP/l[ L
Rl
(//1n
C:DRP/B (/
l
WCWalker:njg7/
VGG@y
WDJohnd6n
\\
11/ o/97-
11/so /97
11/'o/97
t
OFFIC AL F;ECORD COPY
!
.
430035
..
.
-
- - -
- - . - -