ML20198S423

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to 860527 Justification for Amends to Licenses DPR-77 & DPR-79,correcting Inadvertent Ref to Other Changes to Nuclear Safety Review Board.Revised Pages 6-10, Correcting Inadvertent Omission of Change,Also Encl
ML20198S423
Person / Time
Site: Sequoyah  
Issue date: 06/05/1986
From: Domer J
TENNESSEE VALLEY AUTHORITY
To: Youngblood B
Office of Nuclear Reactor Regulation
References
TVA-SQN-TS-60, NUDOCS 8606100419
Download: ML20198S423 (5)


Text

-

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 SN 157B Lookout Place June 5, 1986 TVA SQN TS 60 Director of Nuclear Reactor Regulation Attention:

Mr. B. Youngblood, Project Director PWR Project Directorate No. 4 Division of Pressurized Water Reactors (PWR)

Licensing A U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Youngblood:

In the Matter of the

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 By R. L. Gridley's May 27, 1986 letter to you, we provided revised pages to the proposed license amendment (TVA SQN TS 60) to change the technical specifications of the Sequoyah Nuclear Plant units 1 and 2 to reflect the new organizational structure being implemented in the TVA Office of Nuclear Power. Enclosed are revised pages to the justification (enclosure 3 to the May 27, 1986 letter) to correct an inadvertent reference to other changes to the Nuclear Safety Review Board.

Also enclosed is a revision to page 6-10 for unit 2 to correct an inadvertent omission of a change.

If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683.

Very truly yours, TENNESSEE VALLEY AUTHORITY

~.

f M

J. A. Domer, Assistant Director 3

Nuclear Safety and Licensing Sworn to 4 subscr ed before me thi day of _ //4/ _ 1986

' Notary Public ~

My Commission Expires

/

Enclosures cc: See page 2 8606100419 860605 PDR ADOCK 05000327

[

p PDR 1 \\

An Equal Opportunity Employer

. e Director of Nuclear Reactor Regulation June 5, 1986 l

cc (Enclosures):

U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Carl Stahle Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Mr. Micheal H. Mobley, Director (w/o Enclosures)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue North Nashville Tennessee 37203

This changs to tschnical specifications is en administrativa chings intanded to make the Administrative Controls Section of Plant Technical Specifications (section 6) consistent with the new organizational structure in the Office of Nuclear Power (ONP).

For clarity, the change will be divided into 6 items as follows:

Item Title A

Office of Nuclear Power (ONP) Reorganization B

Plant Operations Review Committee (PORC)

C Independent Safety Evaluation Group (ISEG)

D Radiological Assessment Review Committee (RARC)

E Fire Brigade Members A separate section of this package will be dedicated to each item which will address the description, reason, and justification for each of these changes.

Further, an overall determination of significant hazards consideration will be included addressing all 6 items in accordance with 10CFR50.91 and 92 as Attachment A.

Item A - Office of Nuclear Power (ONP) Reorganization Description of Change This administrative change is being made to change the title of Plant Superintendent to Plant Manager.

~

The plant manager will report directly to the site director. The title of Assistant Director of Nuclear Power (O'perations) is being changed to Site Director.

i The chief officer of the ONP is now titled Manager of Nuclear Power. Any references to the Manager of Power are changed to read Manager of Nuclear Power.

The Health Physicist is now titled Site Radiological Control Supervisor.

The reference to the offsite organization for radiological environmental monitoring program and dose calculations (item 6.2.1.2), Table 6.1-1, and figure 6.2-3 are being removed.

The site organization includes the new Plant Operation Review Staff (PORS).

The PORS is a staff reporting to the assistant plant manager.

For additional detail see attached marked-up pages from technical specifications.

Reason for Change The above changes are proposed in order to make the technical specifications consistent with the proposed organization for the ONP.

Several positions currently in technical specifications no longer (or will no longer) exist af ter the current reorganization.

This change will identify the positions currently responsible for those functions.

l

e Justification for Change The shift supervisor is responsible for the overall safe operation of the plant. For this reason it is imperative that he remain in the main con'.rol room as much as possible without the distraction of intimate involvement in fire fighting efforts.

This change is more restrictive (i.e., more conservative) than currently configured in unit 1 technical specifications.

Unit 2 technical specifications currently are configured this way. The fire brigade is shaced between the two units, as is the shift supervisor, and this rule, being the more restrictive of the two, is already being followed.

This change will, for clarification purposes, bring unit 1 technical specifications into agreement with the comparable specification for unit 2.

This change will also make SQN's Technical Specifications consistent with Westinghouse Standard Technical Specifications, Revision 5.

e r

l l

e ADMINISTRATIVE CONTROLS 6.4 TRAINING 6.4.1 A retraining and replacement train 1 for the unit staff shall be maintained under the direction of the. g g rg :nt Superintendent and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55 and the supplemental requirements specified in Section A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization with relevant industry operational experience.M;ntificd by the I :C.

6.5 REVIEW AND AUDIT NucLERR 6.5.0 The Manager of Power is, responsible for the safe operation of all TVA 3

power plants.

The functional organization for Review and Audit is shown on Figure 6.2-1.

6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)

FUNCTION MANAg6.k.,

6.5.1.1 The PORC shall function to advise the Plant Super'n cndcat on all matters related to nuclear safety.

COMPOSITION

6. 5.1. 2 The PORC shall be composed of the:

fr)nNnggR, Cha rman:

p)f),y,g,ggjNt&$kR7icNs OR. MRINTENANe&),

Member; 95%#W?pfpM&lsEe oR. Rssistaur Quearuus Speeviso WWWWu, u + ---

e -- a - -- S if}*adiologicA CoutRoL %.

Member.

Member $

Nbbkt5 Sy 5bk$t ifh&'O~Eh[8EiPPoRY.SDMRVIS Member-

>0

~

Member:

c ervicer Qus!ity ^.::urance StafE

&"IJAlity ENgI!VEERINJ ANO 0DNfRol 00pSRyj$g SEQUOYAH - UNIT 2 6-10 9

.