January 5,19dT Mr.' Oliver D. Kingsley, P' resident -
Nuclear Generation Group Commonwealth Edison Company ExeCJtive Towers West 111 1400 Opus Place, Suite 500
)
Downers Grove,IL 60515
SUBJECT:
TECHNICAL SPECIFIC /. TION BASES CHANGE - QUAD CITIES NUCLEAR POWER STATION, UN',TS 1 AND 2 (TAC NOS. MA4182 AND MA4183)
Dear Mr. Kingsley:
1 By [[letter::05000254/LER-1998-022, :on 980930,reactor Low Water Level Scram Occurred When Equipment OOS Disabled FW Level Control.Caused by Inadequate Review of Controlled Drawings.Heightened Risk Assessment for OOS Activities|letter dated October 29,1998]]. Commonwealth Edison Company (Comed, the licensee) submitted a change to Facility Operating License Nos. DPR-29 and DPR-30, Appendix A -
i Technical Specifications (TS) Gases Sections 3/4.2.D, " Reactor Core isolation Coo... g Actuation Instrumentation" a:id 3/4.5.D, " Reactor Core Isolation Cooling." The licensee made administrative changes to '.hese base! sections to provide clarity and consistency with the i
system design descripticas provided in the Updated Final Safety Analysis Report (UFSAR)
Sections 5.4.6.
l This change clearly reiterates statements from the UFSAR that the Reactor Core isolation
. Cooling system (RCIC) provides cooling water to the core to a postulated isolated reactor with the loss of the feedwater system. The RCIC system can be manually started as well as being automatically initiated upon a reactor vessel low-low water level signal in a one-out-of-two taken
{
twice logic scheme.
l These changes provide clarity to Bases Sections 3/4.2.D and 3/4.5.D and consistency with the l
UFSAR. The staff has no objections to this Bases change.
Sincerely, Original signed by:
I Robert M. Pulsifer, Project Manager O
Project Directorate 111-2 Division of Reactor Projects - Ill/IV g
Office of Nuclear Reactor Regulation
(
f Docket Nos. 50-254 and 50-265 cc w/ encl: See next page Distribution:
Docket Fild PUBLIC PDill-2 r/f E. Adensam, EGA1 S. Richards C. Moore R. Pulsifer '
OGC,015818 ACRS, T2E26 M. Ring, Rlli 110040 1
. DOCUMENT NAME: G:\\PD3-2\\MA4182-B.SES 4'
To receive a copy of this document, indica Win the, box: "C" = Copy without enclosures *E* = ",opy with enclosures "N" = No copy OFFICE PM:PDill-2 n C LLAP#lll-2 C. f NRR:SRXB D:PDill-2 Cs 2
NAME' RPULSIFEW/'
Di@68E AfCOLLINS M SRICHARDSe' DATE 12/'hf /98 171%i/98 d
12/'2,/ /98
%d 6 /98'i OFFICIAL REC'ORD COPY l
9901110279 990105
-p I'td b
PDR ADOCK 05000254 P
PDR p
3 g p y, W c Lu. C _ _ g l
January 5, 1998 E
Mr. Oliver D. Kingriey, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
TECHNICAL SPECIFICATION BASES CHANGE - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA4182 AND MA4183)
Dear Mr. Kingsley:
By [[letter::05000254/LER-1998-022, :on 980930,reactor Low Water Level Scram Occurred When Equipment OOS Disabled FW Level Control.Caused by Inadequate Review of Controlled Drawings.Heightened Risk Assessment for OOS Activities|letter dated October 29,1998]], Commonwealth Edison Company (Comed, the licensee) submitted a change to Facility Operating License Nos. DPR-29 and DPR-30, Appendix A -
Technical Specifications (TS) Bases Sections 3/4.2.D, " Reactor Core Isolation Coo!!ng Actuation Instrumentation' and 3/4.5.D, " Reactor Core Isolation Cooling.' The licensee made administrative changes to these bases sections to provide clarity and consistency with the system design descriptions provided in the Updated Final Safety Analysis Report (UFSAR)
Sections 5.4.6.
This change clearly reiterates statements from the UFSAR that the Reactor Core Isolation l
Cooling system (RCIC) provides cooling water to the core to a postulated isolated reactor with the loss of the feedwater system. The RCIC system can be manually started as well as being automatically initiated upon a reactor vessel low-low water level signal in a one out-of-two taken twice logic scheme.
These changes provide clarity to Bases Sections 3/4.2.D and 3/4.5.D and consistency with the UFSAR. The staff has no objections to this Bases change.
Sincerely, Original signed by:
Robert M. Pulsifer, Project Manager Project Directorate lil-2 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265 cc w/ encl: See next page Distribution:
Docket File PUBLIC PDill 2 r/f E. Adensam, EGA1 S. Richards C. Moore R. Pulsifer OGC,015B18 ACRS, T2E26 M. Ring, Rill DOCUMENT NAME: G:\\PD3-2WIA4182-B.SES
' Te rehive a copy of this document. Indics Win the, boa: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy OFFICE lPM:PDlll-2 n C iLAP4111-2 U
@R:SRXB D:PDill-2 O
NAME RPULSIFEF#
DNf068E AfCOLLINS M SRICHARDSs&
DATE 12/ 3/ /98 1Y/ $ i /98 12/%/ /98
% 6 /98'i E
N OFFICIAL REC'ORD Y
I
4 l.
f""%k j
UNITED STATES
-2 NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20006 4001
~I January 5, 1998 i
e Mr. Oliver D. Kingsley, President Nuclear Generation Group 3
- Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
TECHNICAL SPECIFICATION BASES CHANGE - QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA4182 AND MA4183)
Dear Mr. Kingsley:
I
. By [[letter::05000254/LER-1998-022, :on 980930,reactor Low Water Level Scram Occurred When Equipment OOS Disabled FW Level Control.Caused by Inadequate Review of Controlled Drawings.Heightened Risk Assessment for OOS Activities|letter dated October 29,1998]], Commonwealth Edison Company (Comed, the licensee)
~
submitted a change to Facility Operating License Nos. DPR-29 and DPR-30, Appendix A -
Techr.ical Specifications (TS) Bases Sections 3/4.2.D, " Reactor Core isolation Cooling Actuation Instrumentation" and 3/4.5.D, " Reactor Core isolation Cooling." The licensee made
- c
- j..
administrative changes to these bases sections to provide clarity and consistency with the A
d
- system design descriptions provided in the Updated Final Safety Analysis Report (UFSAR)
. Sections 5.4.6.
F' This change clearly reiterates statements from the UFSAR that the Reactor Core isolation l'
Cooling system (RCIC) provides cooling water to the core to a postulated isolated reactor with 3-
- the loss of the feedwater system. The RCIC. system can be manually started as well as being e
. automatically initiated upon a reactor vessel low-low water level signal in a one-out-of-two taken
}
- twice logic scheme.
i
~ These changes provide clarity to Bases Sections 3/4.2.D and 3/4.5.D and consistency with the r,
UFSAR. The staff has no objections to this Bases change.
[
Since ly, m
U p
f..
[','
Robert M. Pulsifer, Project Manager Project Directorate ill-2 Division of Reactor Projects - lil/lV Office of Nuclear Reactor Regulation Docket Noc. 50-254 and 50-265 i
cc w/ encl: See ne:d page i
-._ _.y
)
~
O. Kingsley Quad Cities Nuclear Power Station.
' Commonwealth Edison Company Units 1 and 2
)
cc:
MichaelI.' Miller Esquire' Vice President - Law and Sidley and Austin -
Regulatory Affairs
~ One First National Plaza
- MidAmerican Energy Company H
Chicago, Illinois 60603 -
One River Center Place i
106 E. Second Street Commonwealth Edison Company P.O. Box 4350 3
Quad Cities Station Manager Davenport, Iowa 52808 22710 206th Avenue North Cordova, Illinois 61242-9740 Document Control Desk-Licensing Commonwealth Edison Company U.S. Nuclear Regulatory Commission 1400 Opus Place, Suite 400 Quad Cities Resident inspectors Office Downers Grove, Illinois. 60515 F
22712 206th Avenue N.
Cordova, Illinois 61242 Mr. David Helwig Senior Vice President Chairman d
- Commonwealth Edison Company
' Rock Island County Board Executive Towers West lli of Supervisors 1400 Opus Place, Suite 900 1504 3rd Avenue Downers Grove, Illinois 60515 Rock Island County Office Bldg.
l Rock Island,!llinois 61201 Mr. Gene H. Stanley PWR Vice President J
. lilinois Department of Nuclear Safety Commonwealth' Edison Company Office of Nuclear Facility Safety Executive Towers West til
.1035 Outer Park Drive
.1400 Opus Place, Suite 900 Springfield, Illinois. 62704 Downers Grove, Illinois 60515 s
Regional Administrator Mr. Christopher Crane
~ U.S. NRC, Region ill BWR Vice President 801 Warrenville Road Commonwealth Edison Company Lisle, Illinois 60532-4351 Executive Towers West lli i
1400 Opus Place, Suite 900
. William D. Leach Downers Grove, Illinois 60515 Manager-Nuclear MidAmerican Energy Company Mr. R. M. Krich 907 Walnut Street Vice President - Regulatory Services P.O. Box 657 Commonwealth Edison Company
' Des Moines, Iowa 50303 Executive Towers West lll 1400 Opus Place, Suite 500 Commonwealth Edison Company Downers Grove, Illinois 60515 Site Vice President - Quad Cities 22710 206th Avenue North Cordova, Illinois 61242-9740
.,e=%.r
-. ~ ~
ee**
~ ++=-- -- '
e' a
l.
- g
-4' i
l..
t!y-O. Kingsley -
Quad Cities Nuclear Power Plant i
Commonwealth Edison Company 2--
Units 1 and 2 I.
l i,
Commonwealth Edison Company Reg. Affairs Manager-Quad Cities
[
ll 22710 206th Avenue N.
Cordova, Illinois 61242-9740 Ms. Pamela B. Stroebel Senior Vice President and General Counsel l
Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690-0767 i
i 1
l t.
c l.
1 I
l l
l.
l.-
I I'
1 r-s-
1 j
i i
9 I
l
+
\\
l l
l
,..,,,,,-+,
,v
~
---